Laserfiche WebLink
CalEEMod Version: CalEEMod.2016.3.2 Page 2 of 80 Date: 7/28/2020 11:25 AM <br /> River Islands Phase 2 Construction Emissions - San Joaquin County, Annual <br /> Project Characteristics - 95330 Zip Code; CO2 Intensity Factor amended for 2018 based on PG&E 10-k form. This model runs for annual construction emissions <br /> only. <br /> Land Use- Land uses derived from Chapter 2. Project Description <br /> Construction Phase- Construction to commence spring 2021 and end fall 2040. CalEEMod Default ratios utilized to provide phasing estimates. <br /> Off-road Equipment- CalEEMod defaults used <br /> Demolition - General estimate of tons to be demolished <br /> Grading - No import or export of materials. <br /> Trips and VMT- Grade crew: 50 workers, underground crew: 8 works, finish grade crew: 10 workers, homebuilder crew: 140 workers <br /> Architectural Coating - Consistent with SJVAPCD Rule 4601 and applicable land uses that would be painted. <br /> Construction Off-road Equipment Mitigation -2003 SEIR Mitigation Measure 4.5-a <br /> Table Name Column Name Default Value New Value <br /> tblArchitecturalCoating ConstArea_Nonresidential Exterior 3,701,000.00 11,512,500.00 <br /> g -----r-----------------------------t-------------------------- <br /> tblArchitecturalCoatin ConstArea_Nonresidential Interior r 11,103,000.00 3,837,500.00 <br /> tblArchitecturalCoating ConstArea_Residential_Exterior r 9,432,990.00 6,987,400.00 <br /> tblArchitecturalCoating ConstArea_Residential_Interior r 28,298,970.00 20,962,200.00 <br /> tblArchitecturalCoating EF_Nonresidential_Exterior r 150.00 100.00 <br /> ----------------------g------_------------------------------r-----------------------------t-------------------------- <br /> tblArchitecturalCoatin EF_Nonresidential Interior r 150.00 100.00 <br /> -----------------------------_------------------------------r-----------------------------t-------------------------- <br /> tblArchitecturalCoating EF Parking r 150.00 100.00 <br /> g -----r-----------------------------t-------------------------- <br /> tblArchitecturalCoatin EF—Residential—Exterior r 150.00 100.00 <br /> tblArchitecturalCoating EF—Residential—Interior r 150.00 100.00 <br /> g -----:-----------------------------t-------------------------- <br /> tblConstDustMiti ation WaterUnpavedRoadVehicleSpeed 1 0 15 <br /> ------- --------------------------------------+----------------------------- <br /> ---------- .00---- ----------T------------------------------------ <br /> tblConstruction PhaseNumDays <br /> -----------------------------_---------------- ------------r-----------------------------t-------------------------- <br /> tblConstruction Phase NumDay s r 155,000.00 3,782.00 <br /> -----------------------------_---------------- ------------r-----------------------------t-------------------------- <br /> tblConstruction Phase NumDay s r 10,000.00 244.00 <br /> ------- --------------------------------------+---------------- ----------T---------- ---- ---------- <br /> tblConstructionPhase .00----------------------------- ------------------------------t------------------------------ -------------------------- <br /> tblConstruction Phase NumDays 11,000.00 268.00 <br />