My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013950
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4082
>
2600 - Land Use Program
>
PA-2000174
>
SU0013950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:09 PM
Creation date
2/22/2021 9:35:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013950
PE
2632
FACILITY_NAME
PA-2000174
STREET_NUMBER
4082
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215-
APN
17917256
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
4082 S HWY 99
RECEIVED_DATE
1/10/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA- 2000174 ( SA ) Referral , S00013950 Page 2 of 3 <br /> 4082 S . HWY 99 Frontage Road , Stockton 11 January 2023 <br /> 5 . Submit a Small Public Water System preliminary technical report to the California State Water <br /> Resources Control Board , Division of Drinking Water ( Water Board ) before issuance of a <br /> building permit and at least six months before initiating construction of any water related <br /> improvement , as defined . The issuance of a permit to operate a small public water system by <br /> the local primacy agency , EHD , is prohibited without the concurrence of the Water Board . <br /> Please contact Brian Kidwell , P . E . with the SWRCB Division of Drinking Water at ( 209 ) 948 - <br /> 3963 concerning the requirements for preliminary technical report submittal prior to issuance <br /> of building permits . <br /> If the Water Board determines that an onsite well shall be used as the potable water source , <br /> a permit application to operate Small Public Water System shall be submitted to the EHD for <br /> approval prior to sign off of the final occupancy certificate . To issue a permit to operate , <br /> concurrence from the Water Board is required . An approved permit to operate a public water <br /> system will be required by the Environmental Health Department prior to sign off of the final <br /> occupancy certificate ( San Joaquin County Development Title , Section 9 - 1120 . 2 and 9 - <br /> 1115 . 9 . ) . <br /> The supplier must possess adequate financial , managerial , and technical capability to assure <br /> delivery of pure , wholesome , and potable drinking water in accordance with San Joaquin <br /> County Development Title , Sections 9 - 1120 . 2 and 9 - 1115 . 9 and C . C . R . , Title 22 , and Health <br /> and Safety Code , Section 116525 116570 . <br /> 6 . Per site plan dated February 2 , 2021 a new water well is to be installed at the site . This water <br /> well shall be installed under permit and inspection by the Environmental Health Department <br /> at the time of development ( San Joaquin County Development Title , Section 9 - 1115 . 3 ) . <br /> 7 . The existing water well is located on property line of APN : 179 - 172 - 56 & 179 - 172 - 54 . Per San <br /> Joaquin County Well Standard Section 3 . 1 , all water wells shall have minirnum of 10 feet set <br /> back from all property lines . Prior to final occupancy , the applicant shall complete one of the <br /> following requirements : <br /> a . Destroy the existing water well and construct a new water well that complies with the <br /> San Joaquin County Well Standards under permit and inspection by the EHD as <br /> required by San Joaquin County Development Title , Section 9 - 1115 . 5 ( e ) & 9 - 1115 . 3 . <br /> b . Adjust the property line ( s ) for the existing well to meet the minimum set back from <br /> property line and repair this well under permit and inspection by the EHD ( San Joaquin <br /> County Development Title , Section 9 - 1115 . 4 ( e ) ) as follows : <br /> i . Install cement surface seal around the well casing to protect the well casing <br /> sufficiently and the integrity of well grout . <br /> ii . Provide check valve and sample tap between the well head and the pressure <br /> tank . <br /> 8 . If floor drains are required , they must be plumbed through a sand /oil separator and discharged <br /> to an above ground system approved by the EHD . A registered engineer must design this <br /> system . The material collected in the above ground holding system must be analyzed for <br /> hazardous constituents prior to disposal . Specific test requirements may be obtained from the <br /> EHD . The fee will be based on the current schedule at the time of payment . <br /> 9 . Any geotechnical drilling shall be conducted under permit and inspection by The EHD ( San <br /> Joaquin County Development Title , Section 9 . 1115 . 3 and 9 - 1115 . 6 ) . <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468 - 3420 1 F 209 464 - 0138 1 www , sjgov . org /ehd <br />
The URL can be used to link to this page
Your browser does not support the video tag.