My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013950
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4082
>
2600 - Land Use Program
>
PA-2000174
>
SU0013950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:09 PM
Creation date
2/22/2021 9:35:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013950
PE
2632
FACILITY_NAME
PA-2000174
STREET_NUMBER
4082
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215-
APN
17917256
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
4082 S HWY 99
RECEIVED_DATE
1/10/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 � ,ICOG , Inc . <br /> S JC0G , Inc . <br /> SGl/1 ,J0C7quil1 C011H .)l 111111jt1-Species Flabilat Conse%l a 011 Q?' Open Space Plan <br /> 555 East Weber Avenue • Stockton, CA 95202 • (209) 235- 0600 • FAX (209) 235 - 0438 <br /> SJMSCP HOLD <br /> TO : Local Jurisdiction : Community Development Department , Planning Department , Building <br /> Department Engineering Department , Survey Department , Transportation Department , <br /> Other : <br /> FROM : Laurel Boyd , SJCOG , Inc . <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMIT <br /> DO NOT ISSUE FOR THIS PROJECT <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi - <br /> Species Habitat Conservation and Open Space Plan ( SJMSCP ) . In accordance with that agreement , the <br /> Applicant has agreed to : <br /> 1 ) SJMSCP Incidental Take Minimization Measures and mitigation requirement : <br /> 1 . Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the <br /> project applicant prior to an round disturbance but no later than six 6 months from receipt of the ITMMs . <br /> p J PP p Y g ( ) p <br /> If ITMMs are not signed within six months , the applicant must reapply for SJMSCP Coverage . Upon receipt <br /> of signed ITMMs from project applicant, SJCOG , Inc . staff will sign the ITMMs . This is the effective date <br /> of the ITMMs . <br /> 2 . Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs . <br /> 3 . Upon issuance of fully executed ITMMs and prior to any ground disturbance , the project applicant must: <br /> a . Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered (the bond should be valid for no longer than a 6 month period) ; or <br /> b . Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered ; or <br /> c . Dedicate land in- lieu of fees , either as conservation easements or fee title ; or <br /> d . Purchase approved mitigation bank credits . <br /> 4 . Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs <br /> first, the project applicant must : <br /> a . Pay the appropriate SJMSCP for the entirety of the project acreage being covered ; or <br /> b . Dedicate land in- lieu of fees , either as conservation easements or fee title ; or <br /> c . Purchase approved mitigation bank credits . <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called . <br /> Project Title : PA-2000174 ( SA) <br /> Landowner : CK Bros Carrier , Inc . Applicant : Satbir Singh Rai <br /> Assessor Parcel #s : 179472 - 56 <br /> T , R. , Section ( s ) : <br /> Local Jurisdiction Contact : Giuseppe Sanfilippo <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP . <br />
The URL can be used to link to this page
Your browser does not support the video tag.