My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013950
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4082
>
2600 - Land Use Program
>
PA-2000174
>
SU0013950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:09 PM
Creation date
2/22/2021 9:35:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013950
PE
2632
FACILITY_NAME
PA-2000174
STREET_NUMBER
4082
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215-
APN
17917256
ENTERED_DATE
2/22/2021 12:00:00 AM
SITE_LOCATION
4082 S HWY 99
RECEIVED_DATE
1/10/2023 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Monitoring Reporting Plan-PA-2000174 (SA) January 9, 2023 <br /> Agency for Monitoring and Reporting <br /> Impact Mitigation Measure/Condition Type of Review Compliance Action Indicating Compliance or Review Verification of Compliance or Annual Review of Conditions <br /> Monitoring Reporting By Date Remarks <br /> III . Air Quality Construction and X San Joaquin Valley Air Pollution Control District For each project phase, within 30-days of issuance of the <br /> Operation - Exempt from first certificate of occupancy, if applicable, submit to the <br /> Off-site Fee District a summary report of the construction start, and <br /> end dates, and the date of issuance of the first certificate <br /> of occupancy. Otherwise, submit to the District a summary report of the <br /> construction start and end dates within 30-days of the end of each phase of <br /> construction . <br /> III . Air Quality Construction and X San Joaquin Valley Air Pollution Control District For each project phase, all records shall be maintained <br /> Operation - Recordkeeping on site during construction and for a period of ten years <br /> following either the end of construction or the issuance <br /> of the first certificate of occupancy, whichever is later. <br /> Records shall be made <br /> available for District <br /> inspection upon request. <br /> III . Air Quality Construction and X San Joaquin Valley Air Pollution Control District For each project phase, maintain records of ( 1) the <br /> Operational Dates construction start and end dates and ( 2) the date of <br /> issuance of the first certificate of occupancy, if applicable <br /> III . Air Quality Increase Density X San Joaquin Valley Air Pollution Control District 1.46 Jobs, unknown DU <br /> 111 . Air Quality Increase Diversity X San Joaquin Valley Air Pollution Control District Projects located in various land uses <br /> III . Air Quality Improve walkability Design X San Joaquin Valley Air Pollution Control District 121 .5 Nodes/Square Mile <br /> III . Air Quality Improve Destination Accessibility X San Joaquin Valley Air Pollution Control District 0.5 miles (distance to downtown or job center) <br /> IV. Biological Resources Participation in the SJMSCP X San Joaquin Council of Governments The developer shall apply to the San Joaquin Council of Governments <br /> ( SJCOG ) for coverage under the San Joaquin County Multi-Species Open <br /> Space and Habitat Conservation Plan (SJMSCP) . The project site shall be <br /> inspected by the SJMSCP biologist, who will recommend which Incidental <br /> Take Minimization Measures set forth in the SJMSCP should be applied to <br /> the project and implemented . The project applicant shall pay the required <br /> SJMSCP fee, if any, and be responsible for the implementation of the <br /> specified Incidental Take Minimization Measures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.