Laserfiche WebLink
Good morning Steven. <br /> We are working on the construction documents for the subject project, and we have a question regarding the Project <br /> COA's and an existing well. There is an existing well near the property, but it's located on the adjacent south <br /> property. We are in the process of filing a Record of Survey and during our field surveying, discovered the existing well <br /> is slightly south of the property line. Since the well is not on our property and on the adjacent private lot, are we <br /> required to abandon the offsite private well or should the property owner south of us,where the well is located, be <br /> required and conditioned to abandon the well? Please advise. <br /> For reference attached is an exhibit of the Property Line and existing well and the current Project Site Plan <br /> Should you have any questions regarding the existing well or the Project please contact me. <br /> Thank you, <br /> Ai ' Kevin Lang, Project Manager <br /> 1242 Dupont Court <br /> ENGINEERING Manteca, CA 95336 <br /> Phone:(209) 239-6229_Cell: (209) 298-4354 <br /> 2 <br />