Laserfiche WebLink
5 Hydraulic Connections <br /> • A 1" NPT connection is supplied on the bottom of the Healy VP1000 pump. The location of this outlet is shown on <br /> the base layouts in Sections 5.1 & 5.2. This connection is used to return the vapors collected back to the tank. <br /> • Completing the connection of Healy Systems dispensing equipment requires the installation of Healy Systems <br /> Phase II dispenser adapters, hoses, breakaways and nozzles (hanging hardware). <br /> • Healy Vapor Recovery Hoses are available in various lengths to satisfy local ordinances and still provide "far side" <br /> fueling capability. Install these following the instructions contained on the shipping box. <br /> • The Healy Systems nozzle Model 900 is the nozzle necessary to complete the upgrade. Be sure to check for <br /> proper fit in the nozzle holster and that the nozzle can be locked in the off position. Also, be sure that when the <br /> nozzle is locked, that the dispenser cannot be activated from the locked position. <br /> • For Reliance G6200 and G5200 series dispensers, a Healy Model 1301 or 1302 Flow Limiter may be needed to <br /> keep the flow from going over 10.0 GPM. <br /> 5.1 Select (3/G7200) & Century (3/G2200) Base Layout <br /> 1�4 in. <br /> [8i9.9 mm! <br /> f 95 ilk ln. I <br /> I <br /> I Bion n:m]----�I � <br /> �,—--, <br /> -------------------- --------------------- <br /> -- yy <br /> [24x3.4 mrn.] <br /> I I 7 1.4;!n. <br /> 5 114 in. I F'� <br /> Ile 1A.^srn] i r"<10. mrnl I I <br /> 1210.9 <br /> mm] I I - 1 ^,7'7x3 in. <br /> I Heai,"Pump i i i i t4S3 v nn] I <br /> I 0ut!ef9''NFT 1 <br /> ---------- ------ ----�;--21+„I,-�-- 959I2in. I i23.Rsirl. <br /> I 11 L0.^.fiS Yi]I !,K?2.9 mriyj <br /> [vc 7 mm] I <br /> adanJ Box <br /> I I I <br /> I <br /> Ire r- ! I I 1 I <br /> I <br /> 7 <br /> L__.___ I Jl <br /> --- r-� --------- <br /> MainJ-Box Top VewofBase <br /> 3-T NPT <br /> 5.2 Reliance (G6200 & G5200) Base Layout <br /> 7op'ai,.-w h c:a=e ._ [1'02 mm] I <br /> I I <br /> ________ <br /> — . <br /> f --------- --Y <br /> i Z r i <br /> ---------N1. <br /> 8-118 in. ! I I Ii I <br /> HEaI}'Ping I I 8 liln. I I 1 <br /> 120.5 nm]_ I I <br /> �l i O-kIFt V rd Fr- I i Ian,0.,-,m; <br /> MA mm] I I 977E in. <br /> I <br /> I <br /> vl � <br /> uil I Iy: I I ! <br /> I <br /> email I !� 9G.2 i.. � iS a+3 in. <br /> I. 1ei1.1 mm] I r40:'£mm] <br /> AL'Ju P 5q5 �` [ I I. <br /> iJ Bar.tci I IJBcx f.r <br /> ITNJln -- <br /> ' '"""'"'"""'"'"'"- """'""'—'_-- <br /> 1 1.18 <br /> ['310.0 mm] I <br /> 3?94 in. --I <br /> [819.9 mm] <br /> GARB Approved IDM 8-Wayne Global Century,Select Reliance Series-Executive Orders VR-20I and VR-PDP <br />