Laserfiche WebLink
Tools Required <br /> • 0-100" Water Column Vacuum Gauge • Copper Tubing Cutter <br /> • 9" Lineman's Pliers • Electrical Multi-Deter <br /> • Assorted Open End Wrenches 1/4"through 3/4" • 12" adjustable Wrench <br /> • Assorted Allen Wrenches • 18" Channel lock Pliers <br /> • Wire Cutters/Strippers 18 AWG and 26 AWG • (2) 18" Pipe Wrench <br /> • 3/8" Drill Assembly • Hand Pipe Threader(for up to 1" pipe) <br /> • Assorted Drill Bits 1/16" through 7/16" • Pipe Cutter(for up to 1" pipe) <br /> • 1/2" (5/8" O.D.) Copper Tube Bending Tool • Tape Measure <br /> • 1/2" (5/8" O.D.) Copper Flaring Tool • Oil and gasoline compatible PTFE Tape <br /> • Assorted Screwdrivers (Flat blade-one must be 1/8"wide) • Thread Sealing Compound <br /> • 1 1/8" Sheet Metal Hole Punch (for Potted Conduit • 1/2" or 3/8" Ratchet set w/Sockets 1/4"through 9/16" + <br /> Assembly) 3" Extension <br /> Dispenser Access <br /> • Secure dispenser access keys from station management. <br /> • Lock-out and tag-out all electrical power to dispenser being modified. <br /> • Remove dispenser panels and open doors as required for installation. <br /> Dispenser Survey <br /> Close inspection of the dispenser is needed before any work begins. The survey should include the following <br /> observations: <br /> • What vapor recovery system (if any) is currently installed— Balance or VAC Assist? <br /> • Does the existing vapor piping have any obstructions inline such as solenoid valves or ball valves? <br /> • The installer should take note of any possible obstructions that would effect the proper installation of the vacuum pump. <br /> Before Mounting the Vacuum Pump <br /> • The vacuum pump inlet cover must be accessible for service. <br /> • Allow spacing for inlet piping test port and ball valve. <br /> • An unobstructed path for the installation of vapor tubing. <br /> • Allow space for electrical conduit components. <br /> • Access point for the potted conduit through the vapor barrier. <br /> ELECTRONIC COMMERCIAL <br /> Control <br /> Module <br /> LN <br /> Control 0 UNLEADED PREMIUM <br /> Module <br /> d Potted Figure 7 <br /> Conduit Potted <br /> Conduit <br /> 0 <br /> J-Box <br /> J�ox <br /> VP1000 <br /> Vacuum <br /> VP1000 Pump <br /> Vacuum <br /> Pump <br /> SAND <br /> 8-8 <br /> CARE Approved IDM 8-Healy Universal Manual-Executive Orders VR-201 and VR-202 <br />