My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISD Operability Test Pr• • <br /> The following procedures shall be used at field sites to determine the operability of the Veeder-Root ISD system to <br /> satisfy the requirements documented in VAPOR RECOVERY CERTIFICATION PROCEDURE, CP-201, <br /> CERTIFICATION PROCEDURE FOR VAPOR RECOVERY SYSTEMS AT GASOLINE DISPENSING <br /> FACILITIES.Testing the ISD equipment in accordance with this procedure will verify the equipment's operability <br /> for Vapor Containment Monitoring and Vapor Collection Monitoring. <br /> Veeder-Root's TLS console ISD System Self-Test Monitoring algorithms are designed to verify proper selection, <br /> setup and operation of the TLS console modules and sensors and will not complete and report passing test results <br /> in the event of a failure of components used in the system. Completed ISD monitoring tests are evidence that: <br /> • The system was properly powered for data collection <br /> • All necessary ISD sensors were setup and connected <br /> • All necessary ISD sensors were operating within specification <br /> • All internal components including TLS console modules were properly setup and operating within specification <br /> Veeder-Root recommends printing a copy of the ISD ALARM STATUS and ISD DAILY report (REF. Section 5, <br /> Operation of the ISD Install, Setup &Operation Manual) periodically to determine that compliance tests are being <br /> completed in accordance with local and state regulations. <br /> A step-by-step worksheet for recording data from the following operability tests is provided in Appendix B. <br /> Vapor Pressure Sensor Verification Test <br /> See EO VR 202 Exhibit 9 for the Pressure Sensor Verification Test. <br /> Vapor Flow Meter Operability Test <br /> See EO VR 202 Exhibit 9 for the ISD Vapor Flow Meter Operability Test Procedure. <br /> 10-24 <br /> CARO Approved IOM 10 -Veeder Root ISD Install,Setup,5 Operation Manual-Executive Order VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.