Laserfiche WebLink
Operation Viewing ISD Reports via RS-232 Connection <br /> IV0200 <br /> MAR 1, 2009 12:20 AM <br /> (SITE NAME) <br /> (SITE STREET) <br /> (CITY,ST) <br /> (PHONE) <br /> (MMM DD, YYYY HH:MM XM) <br /> ISD MONTHLY STATUS REPORT <br /> EVR TYPE: VACUUM ASSIST <br /> ISD TYPE: XX.XX <br /> VAPOR PROCESSOR TYPE: NO VAPOR PROCESSOR <br /> OVERALL STATUS :FAIL EVR VAPOR COLLECTION :FAIL <br /> EVR VAPOR CONTAINMENT :PASS <br /> ISD MONITOR UP-TIME :100% STAGE I TRANSFERS: 39 of 39 PASS <br /> EVR/ISD PASS TIME : 85% <br /> CARB EVR CERTIFIED OPERATING REQUIREMENTS <br /> MIN MAX <br /> VAPOR COLLECTION ASSIST SYSTEM A/L RANGE 0.95 1.15 <br /> ISD MONITORING TEST PASS/FAIL THRESHOLDS <br /> PERIOD BELOW ABOVE <br /> VAPOR COLLECTION ASSIST SYSTEM A/L GROSS FAIL 1DAYS 0.33 1.90 <br /> VAPOR COLLECTION ASSIST SYSTEM A/L DEGRADATION FAIL 7DAYS 0.81 1.32 <br /> VAPOR CONTAINMENT GROSS FAIL, 95th PERCENTILE 7DAYS ---- 1.30"wcg <br /> VAPOR CONTAINMENT DEGRADATION, 75th PERCENTILE 30DAYS ---- 0.30"wcg <br /> VAPOR CONTAINMENT LEAK DETECTION FAIL @2"WCG 7DAYS ---- 8.50cfh <br /> STAGE I VAPOR TRANSFER FAIL, 50th PERCENTILE 20MINS ---- 2.50"wcg <br /> WARNING ALARMS <br /> DATE TIME DESCRIPTION READING VALUE <br /> 09-02-27 23:59:00 A/L RATIO DEGRADATION FP 6 BLEND 0.80 <br /> 09-02-27 23:59:00 A/L RATIO DEGRADATION FP 5 BLEND 0.76 <br /> 09-02-26 23:59:00 A/L RATIO DEGRADATION FP 5 BLEND 0.79 <br /> 09-02-25 23:59:00 A/L RATIO GROSS BLOCKAGE FP 6 BLEND BLKD <br /> 09-02-25 23:59:00 A/L RATIO GROSS BLOCKAGE FP 5 BLEND BLKD <br /> FAILURE ALARMS <br /> DATE TIME DESCRIPTION READING VALUE <br /> 09-02-27 23:59:00 A/L RATIO GROSS BLOCKAGE FP 6 BLEND BLKD <br /> 09-02-27 23:59:00 A/L RATIO GROSS BLOCKAGE FP 5 BLEND BLKD <br /> 09-02-26 23:59:00 A/L RATIO GROSS BLOCKAGE FP 6 BLEND BLKD <br /> 09-02-26 23:59:00 A/L RATIO GROSS BLOCKAGE FP 5 BLEND BLKD <br /> SHUTDOWN & MISCELLANEOUS EVENTS <br /> DATE TIME DESCRIPTION ACTION/NAME <br /> 09-02-27 23:59:00 A/L RATIO GROSS BLOCKAGE DISABLED FP 06 BLEND <br /> 09-02-27 23:59:00 A/L RATIO GROSS BLOCKAGE DISABLED FP 05 BLEND <br /> 09-02-26 23:59:00 A/L RATIO GROSS BLOCKAGE DISABLED FP 06 BLEND <br /> 09-02-26 23:59:00 A/L RATIO GROSS BLOCKAGE DISABLED FP 05 BLEND <br /> 09-02-15 23:59:00 READINESS ISD:PP EVR:PP ISD & EVR READY <br /> 09-02-19 23:59:00 READINESS ISD:PP EVR:PN EVR READINESS PENDING <br /> 09-02-13 23:59:00 READINESS ISD:PP EVR:PN EVR READINESS PENDING <br /> 09-02-12 23:59:00 READINESS ISD:PP EVR:PN EVR READINESS PENDING <br /> 09-02-11 23:59:00 READINESS ISD:PP EVR:PN EVR READINESS PENDING <br /> 09-02-10 23:59:00 READINESS ISD:PP EVR:PN EVR READINESS PENDING <br /> isd-evr\hea1yf1g5-10.eps <br /> Figure 31. ISD Monthly Status Report-Serial to PC Format <br /> 10-41 <br /> GARB Approved IOM 10 -Veeder Root ISO Install,Setup,S Operation Manual-Executive Order VR-202 <br />