Laserfiche WebLink
I ISD Vapor FlowInstallation <br /> This manual contains instructions to install a Veeder-Root ISD (In-Station Diagnostic) Vapor Flow Meter in a <br /> dispenser's vapor return line in vacuum assist systems. <br /> This manual assumes all preliminary site preparation is completed, and that wiring from the console to the Vapor <br /> Flow Meter junction box is in place and meets the requirements set out in the applicable console Site Prep and/or <br /> TLS RF Wireless 2 system (W2) installation manuals. <br /> Contractor Certification Requirements <br /> Veeder-Root Contractor Installer ATG Technician VR Vapor Products <br /> Certification Requirements Certification6 Certification? Certification$ <br /> Installl ISD X X X <br /> Install PMC X X X <br /> Install CCVP X X X <br /> Install Wireless ISD/PMC X X X <br /> Installation Checkout2 X X <br /> ATG Startup3/Training4/Services X X <br /> ISD Startup/Training/Service X <br /> PMC Startup/Training/Service X <br /> CCVP Startup/Training/Service X <br /> Wireless ISD/PMC Startup/Training/Service X <br /> Install Pressure Sensor(ATG) X X X <br /> Maintain Pressure Sensor(ATG) X <br /> Calibrate Pressure Sensor(ATG) X X <br /> Clear ATG Pressure Sensor Alarm(ATG) X X <br /> Clear ISD/PMC Alarms(ISD/PMC) X <br /> 1Perform wiring and conduit touting;equipment mounting GUST Monitoring Systems—Installer(Level 1) <br /> 21nspect wiring and conduit routing;equipment mounting ?Certified UST Monitoring Technician <br /> 3Turn power on,program and test the systems $VR Vapor Products <br /> 4Provide supervised field experience in service techniques and operations <br /> sTroubleshoot and provide routing maintenance <br /> Warranty Registrations may only be submitted by selected Distributors. Certified installers are required to pro- <br /> vide the GDF operator with the completed Equipment Warranty Notice,form 577013-868, for their records. <br /> 10-1 <br /> CARB Approved IBM 10 -Veeder Root ISD Vapor Flow Meter-Executive Order VR-202 <br />