My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ISD Flow Meter Installation Guide Installation Steps-Vacuum Assist System Below Shear Valve <br /> Dispenser hydraulics cabinet . 4 --)� <br /> inches <br /> Vapor return line <br /> /from dispenser <br /> I I <br /> I <br /> Vapor return line <br /> Shear valve <br /> Top of I---------- ----® ®----i [0-1 ®---------------- <br /> pslddandll---- ------ ---- ---- - ---------------i View A-A <br /> ----------------- <br /> ---------- ---- ---- - --------------- <br /> Al <br /> O� o ,------ --- ---- ---� -- oOo <br /> ---------------- do0 <br /> da <br /> °�0 <br /> cISD Vapor � 0 <br /> A _CD �Ar <br /> o Flow Meter cc <br /> o Ga 0 00 oC <br /> � 0 0° �Approx. 00Q �oho OC <br /> flincheso0�o� <br /> p p <br /> o 0 0 Q� <br /> OIL <br /> 16 0 F Approx. <br /> 6 inches <br /> Approx. 796-3.eps <br /> 22 inches <br /> I <br /> \ Required'Y'fittin for 31 - Approx. <br /> q 9 12 inches <br /> introducing liquid during <br /> TP-201.4 dynamic <br /> backpressure test. <br /> Main vapor/ <br /> return line Dispenser sump I <br /> VERTICAL ACCESS HORIZONTAL ACCESS <br /> FITTING INSTALL FITTING INSTALL <br /> Figure 3. Example flow meter installations with approximate clearances <br /> ID-9 <br /> CARE Approved IDM 10 -Veeder Root ISD Vapor Flow Meter-Executive Order VR-POP <br />
The URL can be used to link to this page
Your browser does not support the video tag.