Laserfiche WebLink
ISD Flow Meter Installation Guide Installation Steps-Vacuum Assist System Below Shear Valve <br /> Dispenser hydraulics cabinet . 4 --)� <br /> inches <br /> Vapor return line <br /> /from dispenser <br /> I I <br /> I <br /> Vapor return line <br /> Shear valve <br /> Top of I---------- ----® ®----i [0-1 ®---------------- <br /> pslddandll---- ------ ---- ---- - ---------------i View A-A <br /> ----------------- <br /> ---------- ---- ---- - --------------- <br /> Al <br /> O� o ,------ --- ---- ---� -- oOo <br /> ---------------- do0 <br /> da <br /> °�0 <br /> cISD Vapor � 0 <br /> A _CD �Ar <br /> o Flow Meter cc <br /> o Ga 0 00 oC <br /> � 0 0° �Approx. 00Q �oho OC <br /> flincheso0�o� <br /> p p <br /> o 0 0 Q� <br /> OIL <br /> 16 0 F Approx. <br /> 6 inches <br /> Approx. 796-3.eps <br /> 22 inches <br /> I <br /> \ Required'Y'fittin for 31 - Approx. <br /> q 9 12 inches <br /> introducing liquid during <br /> TP-201.4 dynamic <br /> backpressure test. <br /> Main vapor/ <br /> return line Dispenser sump I <br /> VERTICAL ACCESS HORIZONTAL ACCESS <br /> FITTING INSTALL FITTING INSTALL <br /> Figure 3. Example flow meter installations with approximate clearances <br /> ID-9 <br /> CARE Approved IDM 10 -Veeder Root ISD Vapor Flow Meter-Executive Order VR-POP <br />