Laserfiche WebLink
Pressure Sensor Installation Under Dispenser Installation Steps <br /> Base of dispenser cabinet <br /> I I <br /> 1 O Pressure <br /> Sensor Wrap rubber shim from <br /> 10 kit around sensor before Cable <br /> o <br /> Inserting in clamp 1 <br /> I `---J ---J ---J ---J J- ---J `---J r--- ---J ---J I <br /> --——————————— <br /> —————————————— ---------- <br /> sens ng Vapor return line <br /> port g from dispenser <br /> ISD Flow Meter Cord grip <br /> 3 <br /> Ive <br /> ` Junction box <br /> / (customerdsupplied) <br /> Pitch to drain 1/4"vertical OR <br /> connect these 2 <br /> per 12"horizontal 1/4"OD coppercables to a TLS RF <br /> tube as requiredtransmitters(W2) <br /> 12 2 Seal off <br /> O_ ,-(customer___— -- --- -- 0 0 Vaposupplied) <br /> shTopof ---------- � — --pedestal island 4 2 Conduit to---------- ----------- -- ----�— Q o TLS Console 0 �� dG <br /> ��� �---------------------------- � /\ 0 <br /> 0 � Flow Meter and Pressure 1�o 0,CD 0 v <br /> �� 0 C 1 0 0 ————— Sensor wiring can share ——— ' � 0 <br /> 0 0 0� the same conduit to console o 0 0 0 0� <br /> 0 : o Z< (Observe polarity!) 1 0�0 0/\ <br /> IO oc::�:) o 0 0 <br /> 0 <br /> 2"or 3"common main vapor return line V o <br /> ONumbers in circle refer to item numbers(kit components)in Table 1 <br /> Figure 4. Example Pressure Sensor Install In Shear Valve Port-Preferred ISD Installation(With Vapor Flow Meter Above Shear Valve) <br /> 10-9 <br /> CARB Approved IOM 10-Veeder Root Pressure Sensor-Executive Order VR-202 <br />