My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2021 4:48:00 PM
Creation date
2/22/2021 2:00:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
763
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pressure Sensor Installation Vapor Vent Stack Installation Step <br /> and the pressure sensing port tube in the base of the sensor is facing down. Locate the pressure sensor in <br /> the clamp, but leave the conduit clamp screw somewhat loose for later sensor height adjustment. <br /> 5. Install two169CA-4-4 male elbows (item 4 in Table 2) into each end of the 3-way calibration valve (item 11 in <br /> Table 2) as shown (see Figure 11). <br /> 6. Install one 68CA-4-4 male connector (item 5 in Table 2) into the center port of the 3-way calibration valve, <br /> and then directly attach it to the pressure sensor inlet port (see Figure 7). <br /> 7. Screw the 59CA-4 plug (item 6 in Table 2) onto the left port's male elbow (see Figure 11). <br /> 8. Install the two plastic enclosure mounting plates to the back of the enclosure. Use the four short flat-head <br /> screws included in the enclosure hardware bag. <br /> 9. Install the composite panel into the enclosure (item 2 in Table 2) such that the sensor cable outlet is facing up <br /> and the pressure sensing port tube in the base of the sensor is facing down. The top symbol on the panel <br /> should be facing upward. Use the four short screws included in the enclosure hardware bag. <br /> 10. Make sure that the white flanged porous vent (factory installed - item 17 in Table 2) is still securely installed <br /> into the hole in the bottom of the enclosure (see Figure 11). <br /> 11. Insert the S-bend 'A" OD copper tube (item 9 in Table 2) into the right-side male elbow of the 3-way <br /> calibration valve, but do not fully tighten the compression nut (see Figure 11). <br /> 12. Locate the 62CABH-4 bulkhead union (item 7 in Table 2) and remove the compression nut and the <br /> adjustable nut then place a large washer (item 8 in Table 2) against the fixed, integral body nut. Slide the <br /> compression nut that was removed onto the bottom portion of the S-bend tube. <br /> 13. Partially insert the bulkhead union into the bottom center hole in the enclosure. Slide a large washer over the <br /> body, and thread the adjustable nut back onto the body. <br /> 14. Insert the bottom portion of the S-bend tube into the bulkhead union and fully tighten the bulkhead union <br /> adjustable nut against the large washer and enclosure wall.Adjust the pressure sensor vertically in the shim / <br /> conduit clamp to make sure the S-bend tube is fully inserted into the union and male elbow. <br /> 15. Fully tighten the compression nuts to connect the S-bend tube to the union and to the male elbow.Tighten <br /> the sensor conduit clamp screw to secure the sensor in its final vertical position (see Figure 11). <br /> 16. Mount the plastic enclosure onto the vapor vent stack or suitable rigid structure ABOVE the vapor vent stack <br /> port using two conduit clamps (for 2" or 3" pipe), bolts, nuts, and washers included, or use other customer <br /> supplied suitable mounting hardware (Example: Unistrut(g). Leave the mounting hardware somewhat loose for <br /> later enclosure height adjustment (see Figure 10). <br /> 17. Measure,fabricate, and install customer supplied pipe and pipe fittings between the vapor vent stack port <br /> and within a few inches of the bulkhead union in the bottom of the enclosure. <br /> 18. Install one 68CA-4-4 male connector (item 5 in Table 2) onto the top of the new pipe (see View A-A, <br /> Figure 10). <br /> 19. Measure,fabricate, and install 1/4" OD copper tubing (item 10 in Table 2) between the bulkhead union and the <br /> male connector.Adjust the enclosure vertically on vent pipe to make sure the copper tube is fully inserted into <br /> the bulk head union and male connector. <br /> 20. Fully tighten the compression nuts to secure the fabricated tube to the bulkhead union and to the male <br /> connector.Tighten the enclosure mounting hardware to secure the enclosure in its final vertical position. <br /> Note: Important!All plumbing's pitch to drain should be 1/4" vertical per 12" horizontal to eliminate any <br /> potential liquid traps. <br /> 10-14 <br /> CARB Approved IOM 10-Veeder Root Pressure Sensor-Executive Order VR-202 <br />
The URL can be used to link to this page
Your browser does not support the video tag.