Laserfiche WebLink
Dispenser Interface <br /> The Dispenser Interface setup is where the Dispenser Interface Module is programmed. For this setup, you will need to <br /> know what kind of D-Box the Dispenser Interface module is connecting up to and what type of communication interface <br /> it is using. For more information on the installation and setup of the Dispenser Interface Module, see the TS-5xxx <br /> Installation Manual and TS-5xxx Setup and Programming Manual. <br /> Group Name Parameter Name Parameter Value Explanation <br /> Dispenser Interface <br /> Precision Volume Precision 3 Leave as default <br /> Dispenser Volume Gross Leave as default <br /> Grades Number of Grades 3 Select number of different gasoline only grades at <br /> facility <br /> Grade 1 Name Regular Unleaded Enter a Name for the Grade <br /> Include in Vapor recovery Yes <br /> Grade 2 Name Premium Unleaded Enter a Name for the Grade <br /> Include in Vapor recovery Yes <br /> Grade 3 Name Super Unleaded Enter a Name for the Grade <br /> Include in Vapor recovery Yes <br /> Dispenser Interface Modules <br /> DIM 1 Type Wayne <br /> Communication Current loop <br /> Fueling Points Number of Fueling Points 12 Enter the number of gasoline fueling points <br /> Fueling Point 1 Number of Hoses 3 <br /> Hose 1 QC Grade Association Regular Unleaded Enter a Name for the Grade <br /> Position 0 Select position of Grade <br /> Hose 2 Grade Association Premium Unleaded Enter a Name for the Grade <br /> Position 1 Select position of Grade <br /> Hose 3 Grade Association Super Unleaded Enter a Name for the Grade <br /> Position 2 Select position of Grade <br /> Fueling Point 2 Number of Hoses 3 <br /> Vapor Recovery Monitoring Setup <br /> This is the final setup to get the Vapor Recovery Monitor(VRM)to work properly. This is where we select the type of vapor <br /> recovery system and call in the appropriate external sensors. <br /> Group Name Parameter Name Parameter value Explanation <br /> Vapor Recovery Monitor Method Type Balance or Assist Select the type of EVR system installed. <br /> Hour Assessment 0 Set time of VRM alarm action <br /> Week Day Assessment Sunday Set Day of VRM alarm action <br /> Dispenser Configuration Dispenser Type Wayne or Gilbarco Select the dispenser model <br /> Multihose Dispenser Site No Select yes or no <br /> Number of Dispensers 0(1 to 48) Equal to the number of flow meters installed <br /> Dispenser 1 Flow Meter Unique Name Select Meter by name from list of enabled meters <br /> First Fueling Point 1 Select correct fueling points for dispenser number. <br /> Second Fueling Point 2 Select correct fueling points for dispenser number. <br /> Ullage Pressure Input Sensor Sensor name Select the correct sensor name <br /> Ullage Volume Input Acquire Ullage Internal,external Select internal if using LL2 probes or external if connected <br /> Security Code to remote ATG. <br /> Number of tanks # <br /> Tank 1 Ullage Enabled Yes or No Select Yes if part of EVR System <br /> Tank 2 Ullage Enabled Yes or No Select Yes if part of EVR System <br /> Pressure Management Enabled Yes or No Yes <br /> System <br /> Type Clean Air Separator Select appropriate device <br /> II-15 <br /> CARB Approved IOM 11-INCON Vapor Recovery Monitoring(VRM)-Executive Order VR-202 <br />