Laserfiche WebLink
(INCON Vapor Pressure Sensor Install Guide) <br /> CON <br /> Franklin Fueling Systems <br /> TS-VPS <br /> Installation Guide <br /> This install guide provides necessary installation instructions for the mounting of the INCON Vapor Pressure Sensor inside a dispenser, <br /> inside a dispenser sump, or on the top of a tank riser. Information regarding the cabling and the connection to the Tank Sentinel <br /> Console is found in the Tank Sentinel Installation Guide, (p/n 000-2150). All documentation relating to operability, maintenance, and <br /> testing of the Vapor Pressure Sensor is found in the Vapor Recovery Monitor Operator's Guide(p/n 000-2058). <br /> Important: See the Vapor Recovery Install/Operators Manual or Tank Sentinel Installation Manual for Important Safety Messages. <br /> Required Tools Related Documents <br /> • Pipe joint tape (Oil and gasoline compatible PTFE 000-2058 : Vapor Recovery Monitor Operators Guide <br /> Tape) 000-2150 : Tank Sentinel Installation Guide- TS-5XXX Series <br /> • Adjustable Wrench 000-2142 : Tank Sentinel Programming Guide- TS-5XXX Series <br /> • Small screwdriver(terminal block connection) 000-2151 : Tank Sentinel Operator's Guide- TS-5XXX Series <br /> • Slip joint pliers(crimping splice connector) <br /> Preparation <br /> 1. Perform a site inspection. Determine how the Vapor Pressure Sensor will be installed.The preferred installation method for this <br /> product is to come off the horizontal 1"port of the vapor shear valve. If this is not possible,then a piping tee may need to be <br /> installed below the Vapor Flow Meter. <br /> 2. If the Vapor Recovery equipment is going to be installed on an existing service station,verify that there is a run of intrinsically safe <br /> conduit going back to the console.Vapor Flow Meter wiring can share the same space with other intrinsically safe cables, but cannot <br /> be run with non-intrinsically safe cables. <br /> 3. Make sure that all contractor-supplied piping materials are compatible with California fuels and meet all local codes. <br /> Parts List and Materials Needed <br /> Table 1 -Off Shear Valve Table 2-Below Shear Valve <br /> Item Description .. Item Description <br /> � <br /> Vapor Pressure Sensor,TS-VPS INCON 1 Vapor Pressure Sensor,TS-VPS INCON 1 <br /> Sensor Installation Kit,020-1509 INCON 1 Sensor Installation Kit,020-1509 INCON 1 <br /> Weatherproof Junction Box Contractor 1 Weatherproof Junction Box Contractor 1 <br /> 1"to 0.5"reducing bushing Contractor 1 1"to 0.5"reducing bushing Contractor 1 <br /> 1.5"Piping Tee Contractor 1 <br /> Installation Steps <br /> Installation Steps Off the Vapor Shear Valve <br /> 1. Lock and tag out power to the dispenser and the console before attempting any work on the dispenser. <br /> 2. Refer to Figure 1 for reference. <br /> 3. Begin by removing the 1" plug from the vapor shear valve and installing a 1"to 1/2" reducing bushing. <br /> 4. If there is not already a watertight junction box for the intrinsically safe cables,then install one as described earlier in Tools Required. <br /> 5. Pull the black Vapor Pressure Sensor cable through the supplied cable grip and into the junction box. Using the supplied crimp <br /> connectors, splice the flow meter cable to the field cable.The color codes on the black Vapor Pressure Sensor are: Black= +(plus) <br /> and White=-(minus). <br /> Installation Steps Below the Vapor Shear Valve <br /> 1. Lock and tag out power to the dispenser and the console before attempting any work on the dispenser. <br /> 2. Refer to Figure 1 for reference. <br /> 3. Install a 1.5"piping tee below the Vapor Shear Valve. <br /> 4. Install an appropriate bushing sized to get to the supplied '/2"piping nipple. <br /> 5. If there is not already a watertight junction box for the intrinsically safe cables,then install one as described earlier in Tools Required. <br /> 6. Pull the black Vapor Pressure Sensor cable through the supplied cable grip and into the junction box. Using the supplied crimp <br /> connectors, splice the flow meter cable to the field cable.The color codes on the black Vapor Pressure Sensor are: Black= +(plus) <br /> and White=-(minus). 11-1 <br /> GARB Approved IN II-INCON Vapor Pressure Sensor(VPS)-Executive Order VR-202 <br /> Page 1 of 2 <br />