Laserfiche WebLink
SAN JOAQUIN VALLEY UNIFIED AIR POLLUTION CONTROL DISTRICT <br /> ® Northern Region Office ❑ Central Region Office ❑ Southern Region Office <br /> 4800 Enterprise Way 1990 E.Gettysburg Ave. 34946 Flyover Court <br /> Modesto,CA 95356-8718 Fresno,CA 93726-0244 Bakersfield,CA 93308-9725 <br /> (209)557-6400 (559)230-5950 (661)392-5500 <br /> Gasoline Vapor Recovery Pre-Backfill Inspection Form <br /> Facility <br /> Station Name: Costco Wholesale Loc#38 ATC: N-4744-1-8 <br /> Location: 1630 E Hammer Lane City: Stockton Contact: Raj Mohan Phone: 209-478-2040 <br /> Contractor <br /> Gonzalo <br /> Company: Wayne Perry Inc Contact: Gomez ICC Cert# 8231233 exp.8/1/22 Phone#: 951-855-4629 <br /> Inspection Summary: <br /> Phase I System Type: VR-101 Phase II System Type: VR-202 Number of Dispensers: 6 <br /> Vapor return slope piping: Slope is 1/8"or greater draining toward the UST?®Yes ❑No <br /> Vapor return pipe diameter: Pipe diameter is 2"from the dispenser to the first manifold? ❑Yes❑No <br /> 3"Thereafter?❑Yes❑No <br /> Diesel tanks on-site? ❑Yes ®No If yes,are they manifolded with the gasoline tanks? ❑Yes ❑No <br /> Compliance ® No defects apparent in the vapor return piping.Final compliance to be determined with TP 201.4 test at <br /> Status: start-up <br /> ❑ The following items must be addressed and re-inspected before backfill can commence: <br /> Comments: <br /> Facility is implementing ATC 1-8 to install an Arid Permeator.The contractor had uncovered the turbine sump of the 87 tank <br /> farthest from the processor in order to add a new vapor return line from the processor. The CAS was still in place as the Permeator <br /> was not yet installed,and the new line was capped until installation can be finalized. <br /> Piping from the tanks to the dispensers and between the tanks had not been uncovered. <br /> The new piping is configured so that the permeator can be installed in accordance with figure 2-10 from exhibit 2 of VR-202-Z <br /> (single 3-inch manifolded inlet,2-inch return line to 87 grade tank). <br /> The vapor piping run to highest grade tank is less than 90 feet. <br /> The start-up date is projected to be around 2/18/21. <br /> Inspector: Mark Rasmussen Date: 2/8/2021 <br /> When repairs are complete call: 559-253-3093 Received By: <br /> NOTE:CA Health&Safety Code,Section 41960.2(a)—Maintenance of Installed Systems.(e)Requires that ■ <br /> the above listed 7-day deficiencies be repaired within 7 days.Failure to do so will result in legal action. HEALTHY AIR LIVING <br /> For important updates and information regarding gasoline dispensing operation requirements,please join wwwheal thysirliving.com <br /> our email notification list for Gasoline Vapor Recovery at: http://www.valleyair.org/lists/list.htm Make one change for clean air! <br />