Laserfiche WebLink
SAN J iOAQ U I N Environmental Health Department <br /> -- COUNTY --- Jasjiit Kang , REHS , Director <br /> Greatn � ss yruays here . <br /> Munlappa Naidu , REHS , Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Willy Ng , REHS <br /> Michael Kith , REHS <br /> Melissa Nissim , REHS <br /> March 2 , 2021 <br /> Alexia Inigues <br /> Barghausen Consulting , Inc <br /> 18215 72r1d Ave S <br /> Kent , WA 98032 <br /> Re : Costco Gasoline #038 SR0083323 <br /> 1630 E . Hammer Ln , Stockton , CA 95210 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of the <br /> application for a permit to do the following on the underground storage tank ( UST) system at the above <br /> noted address : <br /> • Install new compression fitting at existing vent sump <br /> • Install new vapor return line from 87 Tank- 1 turbine sump ( STP) to existing vent sump <br /> Install penetration fittings at 87 tanI0 turbine sump <br /> The permit has been approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work , All new addenda supersede the previous ones . <br /> 3 . Provide written notification to ust sjggo . org to arrange the following appointments ( a 48- hour <br /> notice is required for inspection appointments) . Please be aware that inspections for <br /> emergency work must be scheduled within five days of permit approval . <br /> a . Primary piping test : One hour pressure test at 110 % operating pressure or 40psi <br /> whichever is greater, in accordance with manufacturers installation instructions <br /> b . Secondary piping soap test and penetrations : One hour pressure test at manufacturers <br /> installation instructions <br /> c . Secondary piping slope at 1 /8 inch per foot or greater to a containment sump <br /> d . 24hours hydrostatic test or equivalent on the 87 turbine tank- 1 sump and vent sump <br /> e . Visual inspection of the piping within the vent sump . <br /> Please he aware that the facility cannot receive fuel in the 87 tank4 prior to the EHD <br /> inspection and approval, <br /> 4 , Secondary containment testing for the 87 turbine tank- 1 sump and vent sump is required six <br /> months after installation . Provide 48 hours notification to the EHD when this test is scheduled . <br /> 5 . Any individual performing the work of a service technician must meet the following <br /> qualifications : <br /> 1868 E . Flazelton Avenue Stockton , California 95205 T 209 468-3420 F 209 464 - 0138 i www. sjgov . org /ehd <br />