Laserfiche WebLink
18227.m Site Restoration <br />A description of the proposed site restoration activities, in accordance with <br />section 17870 <br />The site restoration process will remove all compost related activities from the site using the <br />following procedures: <br />1. The operator shall provide the LEA with 30 day notice in writing of intent to perform site <br />restoration. A sign will also be posted at the site entrance 30 days prior to closing; <br />2. When operations terminate, all raw and composted material shall be removed from the <br />site; <br />3. All processing equipment shall be cleaned and removed or stored securely; <br />4. All operation and facility grounds, ponds, and drainage areas shall be cleaned of all residues <br />including, but not limited to, compost materials, construction scraps, and other materials <br />related to the operations, and these residues legally recycled, reused, or disposed of at an <br />appropriate location; and <br />5. All remaining structures shall be cleaned of compost materials, dust, particulates, or other <br />residues related to the composting and site restoration operations. <br />18227.n Odor Impact Minimization Plan <br />An Odor Impact Minimization Plan pursuant to section 17863.4 <br />The Odor Impact Mitigation Plan is included as a separate document. <br />15 <br />