Laserfiche WebLink
CalRecycle <br />Construction and Demolition and Inert Debris Transfer/Processing Facility <br />Inspection Report <br />I THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OF THE DIVISION M OF THE PUBLIC RESOURCES CODE (PRC) AND TITLE 14 AND TITLE 2] CALIFORNIA CODE OF REGULATIONS (CCR) <br />Routine monthly inspection conducted on this date and the following was noted: <br />1. According to the tonnage report submitted by the facility for the month of August 2014, there were no <br />days where the amount of ground wood waste leaving the facility was at or over 25 tons. <br />2. The average amount of material leaving the facility for the month of August 2014 is 23.1 tons per day. <br />