My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2014
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREWERT
>
916
>
4400 - Solid Waste Program
>
PR0526865
>
COMPLIANCE INFO_2013-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 12:07:16 PM
Creation date
2/23/2021 4:19:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2014
RECORD_ID
PR0526865
PE
4443
FACILITY_ID
FA0018195
FACILITY_NAME
CENTRAL VALLEY COMPOST
STREET_NUMBER
916
Direction
W
STREET_NAME
FREWERT
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19126022
CURRENT_STATUS
01
SITE_LOCATION
916 W FREWERT RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
cal Recycle <br /> Compostable Materials Handling Operation and Facility Inspection Report (93) <br /> En C c i+n# get�cy � County of San Joaquin <br /> tY miser(99 xx999 lnspecltadn <br /> 6V1►t1=aT� Eii�fiu <br /> p ,k <br /> 39-AA-0051 6/25/2013 LEA Periodic <br /> Timir 10:15 am 11:45 am lnspctlor�Ti <br /> Harvest-Lathrop Harvest Power California, LLC <br /> 920 West Frewert Road, Lathrop <br /> 95330 <br /> * 4F7 I�Ia end ). <br /> Pres N <br /> Benjamin Escotto George Azevedo (Assistant General Manager) <br /> THE ABOVE FACILITY WAS INSPECTED FOR COMPLIANCE WITH APPLICABLE SECTIONS OF THE DIVISION W OF THE PUBLIC RESOURCES CODE(PRC)AND TITLE td AND TITLE 27 CALIFORNIA CODE OF REGULATIONS(CCR) <br /> X <br /> .. :6 '.�i+ �,ws�.�,a"� <br /> Routine monthly inspection conducted on this date and the following was noted: <br /> 1. The newly deposited unscreened greenwaste was separated from the manually screened <br /> greenwaste pile. <br /> 2. Facility submitted a rough draft updated RCSI. Facility will be instructed to submit a final <br /> copy with recommended changes by 7/31/13. <br /> 3. All records were available for review. <br /> 4. There was a significant increase in the fly population. This was brought to the attention <br /> of the assistant general manager during the inspection. He said that he is in the process <br /> of contracting with "Premiere Pest Mangament"to come out and do fly control. <br /> 5. The temperature of the greenwaste and ground material was 86 F and 139 F respectively. <br /> The temperature range of the windrows was 118 F to 147 F. The temperature of the <br /> sawdust pile and pre-screend pile was 92 F and 116 F respectively. The temperature <br /> range of the screened material was 97 F to 103 F. The temperature of the wood waste <br /> pile, hog fuel pile, and overs was 86 F , 98 F, and 92 F respectively. <br />
The URL can be used to link to this page
Your browser does not support the video tag.