My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1490
>
2300 - Underground Storage Tank Program
>
PR0541436
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2022 8:50:05 AM
Creation date
2/25/2021 2:28:30 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0541436
PE
2351
FACILITY_ID
FA0023750
FACILITY_NAME
AGS FUEL INC DBA CIRCLE K CHEVRON
STREET_NUMBER
1490
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1490 S MAIN ST
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Carol <br /> Thanks for the detailed guidelines for future inspections. Please see attachment for corrective action <br /> statement and let me know if you have any further questions. <br /> Thanks <br /> Annie- Gurpreet D Sandhu <br /> Retailer-Developer <br /> Chevron -Circle K <br /> Arco-Ampm <br /> 7-Eleven <br /> Ph: 925-785-2000 <br /> From: Presto, Carol [EHD] <cpresto@sigov.org> <br /> Sent:Tuesday, March 30, 20214:21 PM <br /> To:Annie Gurpreet Sandhu <anniesandhu@live.com> <br /> Subject: UST Inspections-documents overview <br /> Hi Annie, <br /> Here are documents we will be checking during annual UST inspections: <br /> 1. Annual permit to operate <br /> 2. Current Monitoring Plan for each tank(CERS print out) <br /> 3. Current Response Plan (CERS print out) <br /> 4. Current Financial Responsibility(your financial responsibility forms would be the Certificate of Financial <br /> Responsibility and Letter from Chief Financial Officer) <br /> 5. Employee Training by your Designated Operators (all employees should be trained annually by your Designated <br /> Operators) <br /> 6. Test Results for any testing the has happened on your UST system for the past 3 years <br /> a. annual Monitoring System Certification test results for the past 3 years <br /> b. triennial Overfill Prevention Equipment test results <br /> c. triennial Secondary Containment test results (if your other site requires it, 1490 S Main does not need <br /> Secondary Containment because it is a VPH site.) <br /> 7. Work order for the past 3 years of any repairs or replacements that have happened on your UST system <br /> 8. Monthly Designated Operator Reports for the past 3 years. <br /> UST CERS: <br /> 1. Upload the financial responsibility documents annually.They expire 1 year after the date they are signed. New <br /> signatures and dates should be obtained every year. <br /> 2. Any time a DO changes or any other changes occur, updates should be made in CERS by 30 days. <br /> 3. All other items in CERS does not need to be updated and resubmitted unless there have been changes, only the <br /> financial responsibility needs to be resubmitted annually. <br /> Things to remember: <br /> - Return to Compliance statements should be submitted to EHD within 30 days of receiving the report.The <br /> deadline to submit is typically written on the report. <br /> - All testing completed on the UST System should be submitted to EHD within 30 days of test completion. Usually <br /> the testing companies submit these results to us, but per the regulations it is the owner/operators responsibility <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.