My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 1:58:42 PM
Creation date
2/25/2021 4:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tape measure IMPORTANT.Remove a 1)dtip5 and shavings 9er?er- <br /> 1 ated in steps 3 th ru 5 out of the cut en4 of the tube- DO <br /> NOT remove chips ar%d shavings by dumping thru valve <br /> body- <br /> Mark Upper Tube <br /> (Cur line) STEP 4: FUTHE UPPER DWF TUDE <br /> Seam Fife the upper tube square,and remove any burrs or <br /> FJgum2 rough edges. Make sure thQ cut Is flat and square. <br /> IMPORTANT:Ca ref uIly file a good chamfer on the <br /> STSP 3: CVT TH9 UPPER DROP TUBE insideedge of the drop folk to provide a leadin fort <br /> p*psk seal and inlet tube irtstOW in Step g, <br /> Attach the suppiled band clamp to the upper to be just <br /> below the mark and ensure that It Is assembled square <br /> to the ujbe. The damp ca n be used as a guide for mak- <br /> ing a square cut, if a vise Is used,clamp on the valve / <br /> body caning only to avoid darnage to the float and <br /> tubes lSwf4wre3A). Carefully saw thmmgnthe Sub& <br /> squarely,at the mark made In Step 2. Use a hacksaw <br /> with a new fine`tooth blade_ Rotating the upper tube <br /> as the sawing progresses wiH minimize run out and en- <br /> sure a square 94degrae tut. !Remove the band clannp <br /> aftu tube is cut <br /> CA -Oa NOT v"a pipe or tuhkty Mbar to CA HW*nail(NA"ft <br /> the upWrdroptube,this may damage the tube, <br /> causing it to be out of round tbereby praobibiOng <br /> assend%fy ofthe unit. <br /> abaft 4 <br /> r <br /> STEPS: SAMA THE UPPER DROP TUBE <br /> Sand the Inside of the drop tube with sandpaper andfot <br /> steel wool to remove all burrs and 9f'18rp edges. After <br /> sands ng wipe down the inside of the tube wMi a clean <br /> rag from the Wp to approxiinately 4 inches down to <br /> remove eny debris. <br /> "jai Q Failure to property charnforr satrd,and <br /> clean the drop tubo mar cart the waI and result in a <br /> fallum of a pressure dear Iwk tasL <br /> Figum JA <br /> as"Cu" •� — <br /> . <br /> 'r FaM Wt <br /> 1 <br /> �r„r 3a 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.