My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 1:58:42 PM
Creation date
2/25/2021 4:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEST IRis>E'RUCnONS Socket <br /> POPPET&FLOAT MOVEMENT adaptor � <br /> FOR TESTABLE MODELS ONLY `�_` <br /> TOOLS NEtVW hORTESTiNck <br /> I. 1/4"sentare drive extension,or 3/8'square dnve ear- I 1 , <br /> tension with 31W to 1/4'socket ado . I <br /> 2. Tongue wrench 11/4`or 318"square drive ratchet <br /> wrench. 1 ' <br /> 3, Pipe dope. <br /> 4. Flashlight(optional). <br /> Open Poppet Closed Poppet <br /> 'MST STIEP i; <br /> Remove spill container cover and fill cap frorn fiIt",pt- Tut Fig we@ 1 <br /> er and fook down into the tube and snake sure no debris Pull on extension a� <br /> cr foreign 4*jects afe present- 1fdehrr$cr faretgr%otr <br /> jects are txe�sent take appropriate steps before proceed- socket adaptor <br /> hq. took down low the tube and ensure poppet is <br /> ci�mpietely protected by the deCection shield. See Test <br /> Figure 1. If poppet is exposed and tank is rrm Full the =! � <br /> ovecfill valve should be repLxed. A flashlight may help <br /> when insprcUng te tube. <br /> TW STEP 2; <br /> ' �T <br /> unthread the socket adaptor assern*from the inlet 1 <br /> tube usin a 114'square deive extension and wrens h. j <br /> The extension%fill attach to the sacker adaptor. Secure r� <br /> all tools to et-rstrre they don't fall into tf)e tank or valve. <br /> With the exterLslon still attached pull on the socket <br /> adaptor and cable assembly and ensure float and pvfa- - - <br /> mt move I function properly, k should only require 3" .- . <br /> to 4"of movement and less than 5 lbs of force in order <br /> to actuate the float and poppet. When looking down <br /> into the upper tube ensure poppet is visible and moves E <br /> into the flow path isee Test figure 1 &Z)when socket Open fi <br /> adapWr r3 pu✓fedar4 resets properly wht-n socket adap- Poppet Closed Ij <br /> tar is releaskd. tf poppetclues not actuate freely lake { Poppet I Float moves <br /> appropriate Steps to Correct. i <br /> up <br /> TEST STEP 3: <br /> Apply pipe dope to the socket adaptor threads. Piper-- <br /> dope should be a nor hardening gasoline resinant pipe <br /> thread seat compaanid. tidake sure popptt and float i <br /> have reset properly and are npi visible th-en install sock- <br /> et adaptor and tvrqtoe to 35 ft-lbs(42 In-ibs)minim%►» i I '• <br /> to 5.0!t-lbs I60in-tbs)rnaximurn. After installing socket <br /> r <br /> adaptor.to ensure vapor tightness,OPW recommends <br /> condtxiing preswre testing per+CARS TP2o1.1D. Some TestpkWV2 <br /> &-eas may require pressure testing of overftlt valve per <br /> GARB TP201,10toensure valve Is vapor tight. tf the <br /> drop tube fails pressure testing it may be necessary to <br /> check the seat at the poppet atlaptor threads. Reinstall <br /> �'r cap ar+d cp�tt Contait�arG+ov�•ai4�r tasting, <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.