My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRINITY
>
10858
>
2300 - Underground Storage Tank Program
>
PR0526212
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2021 1:58:42 PM
Creation date
2/25/2021 4:42:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0526212
PE
2351
FACILITY_ID
FA0017737
FACILITY_NAME
CHEVRON STATION #307709*
STREET_NUMBER
10858
STREET_NAME
TRINITY
STREET_TYPE
PKWY
City
STOCKTON
Zip
95219
APN
06602015
CURRENT_STATUS
01
SITE_LOCATION
10858 TRINITY PKWY
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> LJ Check this box if tank gauging is used only for inventory control. <br /> 11 Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1)visually inspected for kinks, breaks and proper entry and ® Lj L <br /> termination; and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup ® El El <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? ® A Ll <br /> Was accuracy of system's water level readings tested? ® Ll Ll <br /> Were all probes reinstalled properly? ® D 71 <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ® Ll Ll <br /> Probe 1D Probe Mode! Tanks Monitored Pass Fail <br /> T1 847390-111 REG.PROBE 0 L) <br /> T2 847390-111 SUP.PROBE R) Ll <br /> T3 847390-111 DSL PROBE Il <br /> Lj D <br /> I1 0 <br /> ® Il <br /> 9. COMMENTS <br /> Describe all answers marked "No"or"Fail'and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> REPLACED 464 SENSORS ON S7 AND S1 DUE TO BAD VACUUM SENSORS.ALSO REPLACED 464 HIGH LIQIUD SENSOR ON S5, <br /> DUE TO A BAD SENSOR.REPLACED ALL SENSORS AND TESTED AND PASSED WITH INSPECTOR.REMOVED 1 OZ OF LIQUID ON DSL STP SUMP. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.