Laserfiche WebLink
Complaint Investigation Summary Report#:5105 <br /> COMPLAINT ID: C00052944 Site Location: 2140 DANIELS ST <br /> Received by: EE0000467 CARRUESCO Received Date: 11/10/2020 Complaint Received Via: INTERNET/EMAIL <br /> Assigned To: EE0078788 FAHMY Assigned Date: 11/10/2020 <br /> Program/Element Code 1600-FOOD PROGRAM <br /> Nature of complaint: <br /> COMPLAINANT ALLEGES THE VENTS ABOVE THE GRILLAREN'T WORKING AND GREASE HAS BUILT UP ON EVERY SURFACE AND IN THE <br /> AIR.THERE WASA LOT OF SMOKE TO WHERE THE DOORS HAD TO BE OPENED AND WORKERS KEPT COUGHING AND GOING OUTSIDE <br /> MULTIPLE TIMES FOR FRESH AIR.EMPLOYEE MASKS HAVE GREASE BUILT UP ON THEM.COMPLAINANTALSO ALLEGES THAT BREAD IS <br /> USED PAST ITS EXPIRATION DATE.THERE ARE VERY LITTLE COVID PREVENTATIVE MEASURES IN PLACE,THE ONLY PREVENTION IS THE <br /> EMPLOYEES WEAR MASKS.CUSTOMERS ARE NOT REQUIRED TO WEAR THEM. <br /> PROPERTY INFORMATION <br /> Facility:FA0023728-Five Guys Manteca <br /> Site Location 2140 Daniels St District 005-ELLIOTT,BOB <br /> Manteca,CA 95337 Location Code 04-MANTECA <br /> Cross Street APN 24153006 <br /> --- ---------------------------------------------- <br /> Complaint Status: <br /> Date Abated: Abated By: <br /> --------------------------------------------------- <br /> Activity Summary <br /> Activity Date Recorded by <br /> 11/10/2020 Complaint inspection. See report. FAHMY <br /> I could verify the complaint. <br /> Follow up inspection will be conducted in 2 weeks. <br /> Report emailed to general manager at fgl801 @encore.bz <br /> General Manager( Molly) cell#209-635-2777 <br /> Signature is not captured due to COVID-19 pandemic. <br /> 11/12/2020 First follow up complaint inspection. See report. FAHMY <br /> Left hood fans were turned off by the maintenance company while cleaning the <br /> hood and never turned on back. <br /> Right hood fans is functioning but have a weak CFM as confirmed by the hood <br /> maintenance company. <br /> As per maintenance personnel, the outside power unit needs to be maintained or <br /> replaced. Repair/ replace the hood power unit to provide adequate CFM from both <br /> hoods units in 3 weeks. <br /> Second follow up inspection is required in 3 weeks. <br /> Report emailed to General manager at fg1801 @encore.bz <br /> Signature is not captured due to COVID-19 pandemic. <br /> 12/03/2020 Follow up complaint inspection. See report. FAHMY <br /> 2nd follow up. <br /> Violations corrected. <br /> No more re inspection is required. <br /> Report emailed to fg 1801 @encore.bz <br /> Signature not captured due to COVID-19 pandemic. <br /> 5105.rpt Page 1 of 1 <br />