Laserfiche WebLink
Elite IV Contractors <br /> Date: 11/01/2021 <br /> Date for Inspection: 11/03/21 Wednesday <br /> Time: 2:00 PM <br /> Permit: SRoo83604 <br /> Site: Quik Stop 120 / 9321 Thornton Rd Stockton, CA 95209 <br /> Scope of Work: <br /> • Replace dispensers with conversion frames installation. <br /> • Cold start monitoring panel. <br /> A) Inspection for: Sensor functionality: Functionality of the monitoring system <br /> must be verified to ensure that monitoring has been restored. A copy of the <br /> alarm history shall be printed prior to performing the cold start of the monitoring <br /> panel and made available at the time of EHD inspection. <br /> B) Verification of the dispenser footprints contained by the under-dispenser <br /> containment sumps (UDC's). Any potential leaks from piping and fuel filters must <br /> drain directly into UDC's. <br /> C) Visual inspection of the piping within the dispensers. <br /> Thank you, <br /> Deborah Jones <br /> Administrative Assistant <br /> Elite IV Contractors <br /> dispatch(c)eliteiv.com <br /> (209) 461-6337 <br /> ■ <br /> Phone:(209)461-6337 Fax:(209)46i-6342 2535 Wigwam Dr.Stockton,CA 95205 <br /> Email:dispatch@eliteiv.com <br />