Laserfiche WebLink
orf°3 .. s-r : . •. -r-'u na rr . "f i z ia� 3.rtr. VIII : .✓ es: yr a : ^,i �+' - . <br /> :� d`.,'r�e .n5 `fisj�:: <br /> t : •c <br /> MEL <br /> P@W <br /> OPW 7150 Overfill Materials Important <br /> Prevention Valves In order to prevent product <br /> Valve Body Cast aluminum spillage from the Underground <br /> The CARB -certified OPW 7150 ( Storage Tank (UST), properly <br /> Float: Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor-tight Overfill Prevention Valve Valve : Aluminum and a proper connection at the <br /> is designed to prevent the overfill of tigltt•rill adaptor are essential. <br /> uSeals : Vitonm Delivery personnel should <br /> underground storage tanks by providing <br /> be managed and trained <br /> a positive shut-off of product delivery. Upper & lower Drop Tube : Aluminum - to inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts : Acetal and hoses for damaged and <br /> the drop tube used for gravity filling . p missing parts, They should <br /> Hardware : Stainless steel Eqr? always make certain there <br /> The OPW 7150 allows easy installation rEV#4 between the adaptor and <br /> Features , is a positive connection <br /> (without breaking concrete) and requires <br /> rrL _ _ _ _ p <br /> no special manholes. — " elbow,If delivery equipment--- <br /> ♦ Simple, Easy and Quick ; ,`. is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two - Installation mistsno excavation or or the elbow is not securely <br /> a shut-off valve. When the liquid special manholes required . <br /> - coupled to the adaptor, a <br /> stage p q serious spill may result when <br /> level rises to about 95 % of tank ♦ Economical — costs a fraction _ q the DPW 71 SO closes, causing <br /> capacity, the valve mechanism is a hazard and environmental <br /> of expensive, complicated and contamination . <br /> released, closing automatically with difficult-to install valves. f <br /> the flow. This reduces the flow rate to NOTE: The DPW 71 SO is <br /> approximately 5 m through a bypass ♦ Furnished Complete — supplied !t <br /> pp Y 9P 9 Yp designed for use on tight•fill <br /> valve. The operator may then stop the with new upper and lower drop tubes, t gravity drop applications only. <br /> mounting hardware and thorough Do not use for pressure <br /> filling process and disconnect and drain 9 g <br /> the delivery hose. As long as the liquid instructions for quick job site time. till applications. <br /> exceeds the 95 % level, the valve will ♦ Completely Automatic Operation <br /> close automatically each time delivery mins no prechecks to perform, no resets Retrofits Directly — for both new <br /> is attempted . and no overrides to be broken and existing tanks with 4 " fill risers. <br /> If the delivery is not stopped and the or abused . ♦ Quick Drain Feature — <br /> liquid rises to about 98% of tank ♦ No Pressurization of the Tank — automatically drains hose when head <br /> capacity, the bypass valve closes operates directly from liquid level . pressure is relieved . <br /> completely. No additional liquid can flow ♦ Will Accept a Dipstick • Best Flow Rate in The Industry* <br /> into the tank until the level drops below for Gauging <br /> • oPw lest Lab results <br /> a reset point. <br /> NOTE: The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and ♦ Completely Automatic faster fill times and reducing <br /> review local, state, and national codes to Operation — does not rely on the spill risk. <br /> determine the regulatory requirements alertness or speed of response of the ♦ Speeds Delivery Operations <br /> governing shut-off capacity in your delivery attendant for certainty of — product flows unimpeded into <br /> region, as well as take into account overfill prevention , the tank until the hose " kick " that <br /> other considerations such as extreme ♦. Keeps the Top of UST " Dry," accompanies the valve shut-off <br /> tank tilt . In all cases, the upper tube <br /> must protrude into the tank at least per EPA Requirements 11111Pprovides a clear signal that the <br /> 6112 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level . <br /> off flow into the tank completely before bung fittings and the need for ♦ Simple and inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation — in both two-point <br /> EPA requirements. ♦ Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required. <br /> Number , H15524PA <br /> Wajul; Look for this label for <br /> Hauthentic <br /> Listings and E _ <br /> O Approved products. <br /> Certifications our <br /> BesMY s Approved rces Board o 7150 IEVR Ad fEBs <br /> L r <br /> 104 OPW , , , t � + r i t + MV � 3 . <br /> ^vi a -� rsr ham. - <br /> t ',x ..e�fiL'fr.,t}.i�vctf.c e <br /> , . :.,._ :ia'`•tL"'_.�Ir ru•i4 bns .rcT..aa ' a�:' .-'Si vCd,:• •a zY .. Y-G'.-.+•ssr- `w.ta.�X: vFa t .i+Lt't . <br />