Laserfiche WebLink
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 10. MONITORING SITE PLAN <br /> Date site plan was prepared:8/24/21 <br /> If a site plan has been prepared that shows all required information, you may include it, rather than this page, <br /> with your Monitoring System Certification Form. The site plan must show the general layout of tanks and <br /> identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include <br /> a legend for all symbols depicted. <br /> UST Monitoring Site Plan <br /> Site Address:\\ 99 SHELL 7700 MORELAND ROAD STOCKTON CA 95212 <br /> . ll.Jl CAS. . <br /> . /. ATG <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . X B . . . . . . . . . . . . . . . . . . . . . . . . . . . . _ <br /> . X 2. . . . . . . . . . . . . . <br /> . . . . . . VEN . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . 0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S. . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . x . 6. . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . E-S P. . . . . . . . . . . . . . . . . . . . . . <br /> X <br /> O1. . . . . . . . . . . . . . . . . . . . . X . .8. . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . O O O . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . KEY <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A=ANNULAR <br /> . . . . .87. . . . . . . . . . . . . . . . . F=FILLS <br /> . . . . . . . . . . . . . . . . . . . . . . . *PIPING* . T=TURBINE <br /> . . . . . . . . . . . . . . . . . . . . . . . (ARROWS) P=PROBE <br /> Drawing of piping V=VAPOR <br /> exit of sump and X=SUMP SENSOR <br /> O UDC's.No L=Leak Detector <br /> underground M=Manway <br /> . . . . . . x ESEL. . . . . . . . . . . . . . . . . drawing is accurate, B=Brine Sensor <br /> 03 W . . . . . . . . . . . . . . . . . . . . . we cannot I=Smart Sensor <br /> speculate blue S=STP <br /> prints. C=Floats&Chains <br /> . . . . . . . . . . . . . . E=E Stop <br /> . . . . . . . . . . . . . . . . V . . . . . . <br /> Any items underground that are not visible to the certifying technician are a <br /> professional opinion only and are solely for informational purposes. Drawing <br /> not to scale <br /> Date map w-as drawn 8/31/20 <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br /> Page 6 of 6 <br />