My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
140
>
2300 - Underground Storage Tank Program
>
PR0505687
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2022 9:01:20 AM
Creation date
3/3/2021 9:55:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0505687
PE
2361
FACILITY_ID
FA0006943
FACILITY_NAME
LATHROP GAS & FOOD INC
STREET_NUMBER
140
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19611007
CURRENT_STATUS
01
SITE_LOCATION
140 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Monitoring System Certification Form <br /> 8. IN-TANK GAUGING TESTING <br /> 8 Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if NO tank gauging equipment is installed. Yes No NA <br /> Do not complete this section if either box is checked. <br /> All wiring has been: 1) visually inspected for kinks, breaks and proper entry and ❑ ❑ ❑ <br /> termination; and 2 tested for ground faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup ❑ ❑ ❑ <br /> to ensure that floats move freely, functionally tested, and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> Probe ID Probe Model Tanks Monitored Pass Fail <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> ❑ ❑ <br /> Ej1 _L❑ <br /> 9. COMMENTS <br /> Describe all answers marked "No"or "Fail"and proposed remedy. <br /> List all monitoring equipment either replaced or repaired. <br /> Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.