My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2300 - Underground Storage Tank Program
>
PR0231426
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 1:26:54 PM
Creation date
3/3/2021 1:46:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231426
PE
2361
FACILITY_ID
FA0004625
FACILITY_NAME
NATIONAL PETROLEUM MANTECA
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by r Manufacturer Ej Industry Standard E] Professional Engineer <br /> Test Type FI .Pressure 8 Vacuum ® Hydrostatic <br /> Test Equipment Used: Pressure Gauge <br /> Tank ID Diesel <br /> Tank Manufacturer N/A <br /> Tank Capacity 9024 <br /> Test Start Time 0 mins <br /> Initial Reading 2 Psi <br /> Test End Time 60 mins <br /> Final Reading 2 Psi <br /> Change in Reading 0 <br /> Pass/Fail Criteria Pass <br /> Tightness Test Results 0 Pass Fail Pass Fail Pass E Fail F1 Pass rj Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by Manufacturer Industry Standard R7 Professional Engineer <br /> Test Type Pressure Vacuum El Hydrostatic <br /> Test Equipment Used: <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ® Pass Fail ® Pass ® Fail I ® Pass ® Fail M Pass E Fail <br /> Pipe Run ID <br /> Pipe Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results Pass ® Fail Pass ® Fail I ® Pass ® Fail Ej Pass ® Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.