My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2300 - Underground Storage Tank Program
>
PR0231426
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/5/2021 1:26:54 PM
Creation date
3/3/2021 1:46:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231426
PE
2361
FACILITY_ID
FA0004625
FACILITY_NAME
NATIONAL PETROLEUM MANTECA
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Worksheet for OPW 61 SO and 71 SO <br /> Appendix B <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet <br /> Important: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion(AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: -- <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body(see figures),upper tube length. <br /> Note: the Upper Tube Length must be at least 16"to in- <br /> clude the protective bend in the tube. <br /> i <br /> (D)= 1 I <br /> Distance from the 71 SO inlet tube flange to the top and <br /> bottom of low r tube,valve length. (D) <br /> (W)_ Upper <br /> (U)_ / �� Tube <br /> Distance from the 71 SO inlet tube flange to the bottom <br /> of the tank. Note:If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension <br /> (OPW 6111 &61 TP models add 0.6") (W)valve <br /> (B)_ Length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- <br /> cut <br /> facturer find the dipstick number(Y)which corresponds <br /> to the 100%volume. (B) <br /> _ To Tank <br /> (Y) <br /> M y <br /> 1. To determine shut-off percentage: Tank I <br /> Subtract upper tube length (D)from distance to tank (U)Valve Chart <br /> bottom (B) /_ Length, 100% <br /> (X)=(B)—(D)-2"= 7 l top of cut Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank <br /> manufacturer determine the tank capacity at the cal- <br /> culated(X)dimension and the 100%volume(Y)tank <br /> capacity. --- <br /> (X)tank capacity in gallons= 2- <br /> (Y)tank capacity in gallons= Cs 2, I <br /> SO%=(X)capacity/(Y)capacity x100 L Note: The overfill valve must be installed per AHJ require <br /> ments and all applicable local,state,and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.