Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 8. SUMP/UDC TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ® Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ® Hydrostatic <br /> Test Equipment Used: Caldwell Level Change Indicator <br /> Sump/UDC ID 1-87-PS-Main 2-87-PS-Siph 3-91-PS 4-110 R-PS <br /> Sump Manufacturer Western FG Western FG Western FG Western FG <br /> Sump Depth (inches) 36" 36" 34" 30" <br /> Sump Bottom to Top of 16" 14" 15" 13" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 9:42 9:46 9:37 8:52 <br /> Initial Reading .001 .001 .001 .001 <br /> Test End Time 10:12 10:16 10:07 9:22 <br /> Final Reading .001 .001 .001 .001 <br /> Change in Reading 0 0 0 0 <br /> Lss/FailCriteria > .002 > .002 > .002 > .002 <br /> htness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Sump/UDC ID 5-Diesel-PS 6-100 R-PS <br /> Sump Manufacturer Total Cont. Total Cont. <br /> Sump Depth (inches) 30" 30" <br /> Sump Bottom to Top of 11" 12" <br /> Highest Pipe Penetration <br /> (inches) <br /> Test Start Time 8:47 8:42 <br /> Initial Reading .001 .001 <br /> Test End Time 9:17 9:12 <br /> Final Reading .001 .001 <br /> Change in Reading 0 0 <br /> Pass/Fail Criteria > .002 > .002 <br /> Tightness Test Results ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Additional copies of this page may be attached. <br /> All tests marked "Fail'and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 3 of 5 <br />