My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COA70MLPJ
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
17000
>
2500 – Emergency Response Program
>
COA70MLPJ
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:00:54 PM
Creation date
3/3/2021 4:42:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2500 – Emergency Response Program
RECORD_ID
COA70MLPJ
PE
2546
FACILITY_NAME
WINE GROUP LTD PTP
STREET_NUMBER
17000
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
Zip
95366
APN
24506030
ENTERED_DATE
11/23/2020 12:00:00 AM
SITE_LOCATION
17000 E HWY 120, RIPON, CA
RECEIVED_DATE
11/23/2020 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I IIIIII VIII(IIII VIII VIII VIII IIII IIII R5548425 TWG0024 <br /> REPLACE SEAL ON RECIRC PUMP <br /> Site: 03E -RIPON(RPN) REPLACE SEAL ON RECIRC PUMP 11/25/2020 10:24:23 <br /> Work Order No: 674927 WF-Facilities Maintenance Page 1 of 2 <br /> Assigned To Humphrey, Brett T. 102188 Originator Jeff Atkinson <br /> Craft REF WO Type 1 - Requested Work <br /> Planned Start Date 11/24/2020 WO Status MH -W/O Issued& Released <br /> Requested Finish Date 12/4/2020 WO Priority - <br /> Estimated Hrs. Requestor <br /> Equipment/Unit No 1531 ! 03-1002404 <br /> Model#/Serial# / <br /> Equipment Desc. RECIRCULATOR RP1 B-AREA B <br /> Location CEL-CELLAR <br /> Sub Location - <br /> Sub Location 2 -BLANK <br /> Part Number Description Bin Location UOM Oty. R 'd Pick Slip No <br /> Part Number Description Bin Location <br /> Safely Instructions <br /> ****####+#x#+#+k#k#*k***#**+kk**#*#***#kk#k**}* SAFETY NOTE <br /> ALWAYS WATCH OUT FOR YOUR SAFTEY FIRST <br /> LOCK OUT AND TAG OUT ALL ENERGY SOURCES. <br /> ELECTRICAL, HYDRAULIC, PNEUMATIC. <br /> BLOCK UP ANY PART OF EQUIPMENT THAT MAY MOVE FROM GRAVITY <br /> TRY TEST STARTING EQUIPMENT AFTER IT IS DE-ENERGIZED <br /> CHECK YOUR SURROUNDINGS AND WORK AREA CARFULLY FOR ANY POSSIBLE DANGERS <br /> WHEN YOU ARE DONE WITH PROJECT, <br /> ****************x********kk***kxx*** BEFORE RELEASING EQUIPMENT, #k#k*****+**###*}#k##*+#*#x***##k*} <br /> ENSURE THAT ALL OLD PARTS, <br /> LEFT OVER NEW PARTS AND TOOLS ARE <br /> **++x****+xx##*******#*****##k*xkx PICKED UP AND ACCOUNTED FOR*+**#***#**#+k##*#***#**+##****+**** <br /> Work Order Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.