Laserfiche WebLink
IIIII�ILII IIIII ILII IIID IIIII IIII IN R5548425 TWG0011 <br /> DLYIWKLY REFRIGERATION ROUNDS <br /> Site: 03E-RIPON (RPN) GENERATED FROM MODEL WO 549670 11/17/2020 18:40:21 <br /> Work Order No: 671877 WF- Facilities Maintenance Page i of 4 <br /> Assigned To Originator <br /> Craft MTT WO Type 2 - Maintenance Program PM/PD <br /> Planned Start Date 11/16/2020 WO Status MH -W/O Issued & Released <br /> Requested Finish Date 11/16/2020 WO Priority 3 - Normal <br /> Estimated Hrs. 1.00 Requestor <br /> Equipment/Unit No 1528 / 03-1002401 <br /> Model#/Serial# / <br /> Equipment Desc. REFRIGERATION AREA B <br /> Location CEL- CELLAR <br /> Sub Location <br /> Sub Location 2 -BLANK <br /> Part Number Description Bin Location UOM Oty. Req'd Pick Slip No <br /> P!!N u m b e r Description Bin Location <br /> Safety Instructions <br /> SAFETY NOTE <br /> xxx*xxxx****xxxx*x*xxxxxzxxz***xxxxx*x****xx**xxx*xzxxxx*xxz xx*x*xx xx*xzx*xx**xxx*******xx*xxx****xxxx***********xr <br /> ***xx***xx*******x*****x ALWAYS WATCH OUT FOR YOUR SAFTEY FIRST ************************* <br /> LOCK OUT AND TAG OUT ALL ENERGY SOURCES. <br /> ELECTRICAL, HYDRAULIC, PNEUMATIC. <br /> BLOCK UP ANY PART OF EQUIPMENT THAT MAY MOVE FROM GRAVITY <br /> TRY TEST STARTING EQUIPMENT AFTER IT IS DE-ENERGIZED <br /> CHECK YOUR SURROUNDINGS AND WORK AREA CARFULLY FOR ANY POSSIBLE DANGERS <br /> WHEN YOU ARE DONE WITH PROJECT, ******************************** <br /> ***xx*****x*x***********xx*****xxxxx BEFORE RELEASING EQUIPMENT, xx*x**x*********x****************** <br /> ENSURE THAT ALL OLD PARTS, <br /> LEFT OVER NEW PARTS AND TOOLS ARE <br /> *********x*********x********x*xxxx PICKED UP AND ACCOUNTED FOR xxxxxx**x**x****xx**********xx****** <br /> **xxx***************x************xxx*x*xx*****xx**************xxx*********xx*x*x*x*xx**x**xx***xx*******x***xxx*x*x <br /> Work Order Attachments <br />