My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO0052918
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
0
>
2900 - Site Mitigation Program
>
CO0052918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 10:51:25 AM
Creation date
3/5/2021 10:16:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
RECORD_ID
CO0052918
PE
2900
STREET_NUMBER
0
STREET_NAME
WALNUT GROVE
City
WALNUT GROVE
ENTERED_DATE
11/4/2020 12:00:00 AM
SITE_LOCATION
WALNUT GROVE & OTHERS
RECEIVED_DATE
11/4/2020 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Soil Investigations for Data Collection in the Delta <br />Initial Study/Proposed Mitigated Negative Declaration 156 <br />3.9.2 Discussion <br />a. Create a significant hazard to the public or the environment through the <br />routine transport, use, or disposal of hazardous materials? <br /> <br />Less than Significant Impact with Mitigation Incorporated. The Proposed Project <br />would not require extensive or on-going use of acutely hazardous materials or <br />substances. Proposed Project activities would require limited transport, storage, and <br />use of equipment and materials, and routine transport of vehicles that use <br />hazardous materials (e.g. motor oil, gasoline, diesel), as well as limited disposal of <br />hazardous materials. In addition, contractors that handle hazardous materials are <br />required to have a Hazardous Materials Plan that describes the hazardous materials <br />they use, and how the materials will be properly stored, used, transported, and <br />disposed of. All hazardous materials would be stored and used in accordance with <br />applicable federal, state, and local regulations, and disposed of at a properly <br />licensed disposal facility. In addition, proper spill management, including response <br />plans and spill kits, would be implemented and maintained onsite, as is currently <br />required by DWR. None of the Proposed Project components would generate new <br />sources of hazardous materials. <br />The potential for impacts due to hazards and hazardous materials will be reduced to <br />less than significant with the incorporation of Mitigation Measures BIO-1, regarding <br />removal of refuse, MM-HAZ 1 and BMM-HAZ 2 regarding development of a <br />Hazardous Materials Plan and a Spill Prevention and Response Plan. <br />MM HAZ-1: <br />a. A Plan(s) (often a contractor’s safety plan) with a section on Hazardous <br />Materials shall be written and kept on site that describes the hazardous <br />materials used during project activities, and how the materials will be properly <br />stored, used, transported, and disposed of. All hazardous materials shall be <br />properly labeled and be recycled properly or disposed of at a properly <br />licensed disposal facility. <br /> <br />b. The contractor shall contact the local fire agency and the local CUPA for any <br />site-specific requirements regarding hazardous materials or hazardous waste <br />containment or handling. <br /> <br />c. If hazardous materials, such as oil, batteries or paint cans, are encountered in <br />the Impact Area, the contractor(s) shall carefully remove and dispose of them <br />according to the Safety Plan and Spill Prevention and Response Plan. All <br />hazardous materials will be disposed of at a properly licensed disposal <br />facility. <br /> <br />d. Contact of chemicals with precipitation shall be minimized by storing <br />chemicals in watertight containers or in a storage shed (completely enclosed), <br />with appropriate secondary containment to prevent any spillage or leakage.
The URL can be used to link to this page
Your browser does not support the video tag.