My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO0052918
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
0
>
2900 - Site Mitigation Program
>
CO0052918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 10:51:25 AM
Creation date
3/5/2021 10:16:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
RECORD_ID
CO0052918
PE
2900
STREET_NUMBER
0
STREET_NAME
WALNUT GROVE
City
WALNUT GROVE
ENTERED_DATE
11/4/2020 12:00:00 AM
SITE_LOCATION
WALNUT GROVE & OTHERS
RECEIVED_DATE
11/4/2020 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Soil Investigations for Data Collection in the Delta <br />Initial Study/Proposed Mitigated Negative Declaration 161 <br />loading of fuel, topographic conditions, and local climate (e.g. temperature and <br />likelihood of strong winds). In total, there are three CalFire designations for fire <br />hazards, which are moderate, high, and very high. Typically, homes that are located <br />within high or very high CalFire severity zones are considered lacking in adequate <br />wildland or structural fire protection. CalFire has designated the Study Area as being <br />near a moderate or high threat of fire (CalFire 2017), however, the Proposed Project <br />itself is not likely to cause any risk of fire due to the nature of the activity. While this <br />would be a less than significant impact, implementation of Mitigation Measures MM <br />BIO-1 and MM HAZ-4 would further avoid, minimize and/or reduce the potential for <br />impacts. <br />MM HAZ-4: <br />a. The contractor would develop a fire protection and prevention plan which <br />incorporates fire safety measures on all equipment with the potential to create <br />a fire hazard. <br /> <br />b. The plan would ensure that fire suppression equipment is onsite and that all <br />employees have received appropriate fire safety training. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.