My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO0052918
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
0
>
2900 - Site Mitigation Program
>
CO0052918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 10:51:25 AM
Creation date
3/5/2021 10:16:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
RECORD_ID
CO0052918
PE
2900
STREET_NUMBER
0
STREET_NAME
WALNUT GROVE
City
WALNUT GROVE
ENTERED_DATE
11/4/2020 12:00:00 AM
SITE_LOCATION
WALNUT GROVE & OTHERS
RECEIVED_DATE
11/4/2020 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Soil Investigations for Data Collection in the Delta <br />Initial Study/Proposed Mitigated Negative Declaration 182 <br />emergency access, including any emergency response or evacuation routes. <br />Service ratios, response times, and other performance objectives will not be <br />significantly impacted during Proposed Project activities as it relates to police <br />protection. <br /> <br />Proposed Project activities would not increase the demand on police protection <br />services, either due to an increased worker population or due to Proposed Project- <br />related hazards and would therefore not result in impacts which would require new <br />or additional police protection. While there would be no impact to police protection, <br />implementation of Mitigation Measures MM PUB-1 and TRANS-1 would further <br />avoid, minimize and/or reduce the potential for impacts. <br /> <br />Schools? <br /> <br />No impact. Proposed Project activities are minor and short in duration and will not <br />impact service ratios or any other performance objective for schools within the <br />Proposed Project area. Additionally, as discussed above in the Population and <br />Housing Section, Proposed Project activities will not induce any population growth <br />that would necessitate building new schools. Therefore, the Proposed Project <br />activities would not result in impacts which would require new or additional schools. <br /> <br />Parks? <br /> <br />No impact. While some Proposed Project activities will occur within or in close <br />proximity to parks, wildlife areas, ecological reserves, and open spaces, drilling <br />locations are mostly located on or adjacent to roads and road shoulders in disturbed <br />areas, and will only require limited amounts of additional people and vehicles at <br />each site. Because Proposed Project activities are minor and short in duration (up to <br />15 days per site), disturbances to these areas will be minimal and the Proposed <br />Project activities would not result in impacts which would require new or additional <br />parks. <br /> <br />Other public facilities? <br /> <br />No impact. Due to the nature of Proposed Project activities (minor and occurring <br />over a short duration of time), service ratios and other performance objectives will <br />not be impacted during Proposed Project activities as it relates to other public <br />facilities, including those such as hospitals and libraries. Proposed Project activities <br />would not increase the demand on public facilities, either due to an increased worker <br />population or due to Proposed Project-related hazards. The Proposed Project <br />activities would not result in impacts which would require new or additional public <br />facilities. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.