Laserfiche WebLink
<br /> <br />Soil Investigations for Data Collection in the Delta <br />Initial Study/Proposed Mitigated Negative Declaration 204 <br />impact on an adopted emergency response plan or emergency evacuation plan, <br />implementation of Mitigation Measures MM-PUB-1 and HAZ-2 would further avoid, <br />minimize and/or reduce the potential for impacts. <br /> <br /> <br />b) Due to slope, prevailing winds, and other factors, exacerbate wildfire risks, <br />and thereby expose Proposed Project occupants to, pollutant concentrations <br />from a wildfire or the uncontrolled spread of a wildfire? <br /> <br />Less than Significant with Mitigation Incorporated. There are tall, dry grasses <br />surrounding some of the Impact Areas, the machinery and vehicles actively working <br />on the Impact Areas have the potential to exacerbate wildfire risks. Mitigation <br />Measure MM PUB-1 ensures that a plan will be prepared which incorporates fire <br />safety measures, as well as a Safety Plan, and incorporation of these plans would <br />include county specific emergency response considerations plans which would <br />reduce the Proposed Project wildfire risk to less than significant. <br />c) Require the installation or maintenance of associated infrastructure (such as <br />roads, fuel breaks, emergency water sources, power lines or other utilities) <br />that may exacerbate fire risk or that may result in temporary or ongoing <br />impacts to the environment? <br />No impact. The Proposed Project does not require the installation or maintenance of <br />associated infrastructure (roads, fuel breaks, emergency water sources, powerlines <br />or other utilities). Therefore, Proposed Project activities would have no impact on <br />exacerbating wildfire risk or resulting in temporary or ongoing impacts to the <br />environment. <br />d) Expose people or structures to significant risks, including downslope or <br />downstream flooding or landslides, as a result of runoff, post-fire slope <br />instability, or drainage changes? <br />No impact. This Proposed Project would not alter the current runoff regime and <br />drainage of the Impact Areas, nor would it impact people or structures in a way that <br />could pose significant risks through downslope or downstream flooding or landslides <br />as a result of runoff, post-fire slope instability, or drainage changes. Therefore, no <br />impact would occur as a result of the Proposed Project. <br />