My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO0052918
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
0
>
2900 - Site Mitigation Program
>
CO0052918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 10:51:25 AM
Creation date
3/5/2021 10:16:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
RECORD_ID
CO0052918
PE
2900
STREET_NUMBER
0
STREET_NAME
WALNUT GROVE
City
WALNUT GROVE
ENTERED_DATE
11/4/2020 12:00:00 AM
SITE_LOCATION
WALNUT GROVE & OTHERS
RECEIVED_DATE
11/4/2020 12:00:00 AM
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
343
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DWR Project Level GHG Emissions Reduction Measures <br />The following list of Best Management Practices (BMPs) for DWR construction and <br />maintenance activities are recommended to reduce GHG emissions from construction <br />projects. All projects that rely on the GGERP must implement the BMPs as part of the <br />project or explain why the measures that have not been incorporated do not apply to the <br />project. Variances from the standard BMPs that have been requested for this project are <br />described below. <br />BMP 1. Evaluate project characteristics, including location, project work flow, site <br />conditions, and equipment performance requirements, to determine whether <br />specifications of the use of equipment with repowered engines, electric drive trains, <br />or other high efficiency technologies are appropriate and feasible for the project or <br />specific elements of the project. <br />BMP 2. Evaluate the feasibility and efficacy of performing on-site material hauling with <br />trucks equipped with on-road engines. <br />Variance requested: Material hauling is not required for the proposed soil <br />investigations; therefore, this BMP does not apply. <br />BMP 3. Ensure that all feasible avenues have been explored for providing an electrical <br />service drop to the construction site for temporary construction power. When <br />generators must be used, use alternative fuels, such as propane or solar, to power <br />generators to the maximum extent feasible. <br /> Variance requested: Electrical service drops are not feasible for this project as <br />work willbe conducted at each site for no more than 15 days; therefore, this <br />BMP does not apply. <br />BMP 4. Evaluate the feasibility and efficacy of producing concrete on-site and specify <br />that batch plants be set up on-site or as close to the site as possible. <br />Variance requested: Concrete production is not required for the proposed soil <br />investigations; therefore, this BMP does not apply. <br />BMP 5. Evaluate the performance requirements for concrete used on the project and <br />specify concrete mix designs that minimize GHG emissions from cement production and <br />curing while preserving all required performance characteristics. <br />Variance requested: Concrete is not required for the proposed soil investigations. <br />Cement-bentonite mixture used to grout boreholes conforms to industry standards. <br />BMP 6. Limit deliveries of materials and equipment to the site to off peak traffic <br />congestion hours.
The URL can be used to link to this page
Your browser does not support the video tag.