My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CO0048503 (3)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
12 (STATE ROUTE 12)
>
13550
>
4200 – Liquid Waste Program
>
CO0048503 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:47:15 PM
Creation date
3/5/2021 11:43:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4200 – Liquid Waste Program
RECORD_ID
CO0048503
PE
4200
STREET_NUMBER
13550
Direction
W
STREET_NAME
STATE ROUTE 12
City
LODI
Zip
95242
APN
05502002
ENTERED_DATE
1/23/2019 12:00:00 AM
SITE_LOCATION
13550 W HWY 12
RECEIVED_DATE
1/23/2019 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\ymoreno
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Environmental Health Department (EHD) has not received permit application for demolition or <br />installation of the septic system at Grindstone Joe's, 13550 or 14900 HWY 12. Septic permit and <br />inspection by EHD is required for demolition or installation of septic system, San Joaquin County <br />Development Title 9-1110.3 and 9-1110.4. <br />Please submit permit application to EHD for approval. Soil suitability and nitrate loading study may also <br />be required prior to issuance of permit for installation of septic system. Permit application can be found <br />at: <br />https://www.sigov.orauploadedfiles/sic/departments/ehd/formsionsite%20wastewater%20tx%20sys% <br />20permit.pdf <br />If you have question please contact me at 209-468-3444 or Steven Shih, REHS, at 209-468-9850. <br />Michael Kith, REHS <br />Program Coordinator <br />San Joaquin County Environmental Health Department <br />1868 E. Hazelton Avenue, Stockton, CA 95205 <br />P: (209) 468-3444 <br />F: (209) 468-8392 <br />E: mkith@sigov.org <br />From: Gerry Kamilos <GKamilos@kamilos.com > <br />Sent: Thursday, October 24, 2019 9:03 AM <br />To: Funderburg, John <ifunderburg@sigov.org> <br />Cc: Nissim, Melissa <mnissim@sigov.org> <br />Subject: FW: County Inspections <br />John, <br />Our contractor at Grindstone Joe's has completed the septic demolition per the demo permits and is <br />now ready to start the construction of the new septic system. The contractor needs a sign off by County <br />inspection first on the work completed. Our contractor has been trying to schedule an appointment for <br />several weeks without luck. The permits to demo and replace expire at the end of November. We can <br />make that deadline; if the County can inspect the work completed now. <br />Our contractor is: <br />Comfort Air <br />See o6 /Cri:feig <br />Service Manager <br />Cell (209) 608-0204 <br />sknisely@comfortairinc.com <br />Please have the appropriate County inspector call Steve at the above and hopefully we can get the <br />inspection done and complete the work. <br />Thank you <br />4
The URL can be used to link to this page
Your browser does not support the video tag.