My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
7906
>
2300 - Underground Storage Tank Program
>
PR0231094
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 4:32:32 PM
Creation date
3/8/2021 8:14:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231094
PE
2361
FACILITY_ID
FA0003632
FACILITY_NAME
AJS MINI MART INC
STREET_NUMBER
7906
Direction
N
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95210
APN
07935016
CURRENT_STATUS
01
SITE_LOCATION
7906 N EL DORADO ST
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
216
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN J 0 A Q I I I Irl Environmental Health Department <br /> CCUNTY <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Facility Address: Date: <br /> AJS MINI MART INC 7906 N EL DORADO ST, STOCKTON March 30, 2021 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 208 CCR 2716(a-e) Failure to comply with the designated operator inspection requirements. <br /> OBSERVATION: The designated operator failed to check and note the correct test dates for the overfill prevention <br /> inspection on the May 2020 through October 2020 designated operator inspection reports. The overfill prevention <br /> inspection date was documented on the reports as 10/24/2018, however,the correct test date is 08/31/2018. <br /> REGULATION GUIDANCE: During the inspection, the designated operator shall check that all required testing and <br /> maintenance for the UST system have been completed and document the dates they were done. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> ---------------------------------- <br /> ---------------------------------- <br /> OBSERVATION: The designated operator failed to document all the alarms from the attached alarm history on the <br /> 08/28/2020 and 10/22/2020 designated operator inspection reports and failed to check that they were responded to <br /> appropriately. The missing alarms include: Q2 87 Master- PLLD Shutdown alarms on 08/21/2020 and 10/18/2020. <br /> REGULATION GUIDANCE: During the inspection,the designated operator shall review the alarm history since the <br /> previous inspection, check that each alarm was documented and responded to appropriately, and attach a copy of <br /> the alarm history with documentation taken in response to any alarms to the inspection report. <br /> CORRECTIVE ACTION: Ensure that designated operators performing inspections at this facility are including all of <br /> the required information on the reports. <br /> ----------------------------------- <br /> ----------------------------------- <br /> OBSERVATION: The designated operator inspections for the following months were performed more than 30 days <br /> after the previous inspection: <br /> - Initial inspection on 03/05/2020, next inspection performed on 04/15/2020 (41 days) <br /> REGULATION GUIDANCE: The designated operator visual inspections shall be conducted within 30 days or less of <br /> the previous inspection. <br /> CORRECTIVE ACTION: Ensure that all designated operator inspections are performed within the required time <br /> frames. <br /> This is a repeat violation, Class II. <br /> Overall Inspection Comments: <br /> Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br /> documenting the corrective actions that have been or will be taken for each violation, and any supporting <br /> paperwork, by April 29, 2021 . <br /> To minimize person to person contact EHD is choosing to write the name of person receiving the report instead <br /> FA0003632 PR0231094 SCO01 03/30/2021 <br /> EHD 23-01 Rev.9/16/2020 Page 5 of 6 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.