My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAM
>
236
>
2300 - Underground Storage Tank Program
>
PR0231333
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2021 11:15:27 AM
Creation date
3/8/2021 8:17:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231333
PE
2361
FACILITY_ID
FA0003711
FACILITY_NAME
LAKEWOOD CHEVRON
STREET_NUMBER
236
Direction
N
STREET_NAME
HAM
STREET_TYPE
LN
City
LODI
Zip
95240
APN
03710028
CURRENT_STATUS
01
SITE_LOCATION
236 N HAM LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site: L-A rUN- ) C*e-,/v-N <br /> Appendix B Date: U/u/-j` <br /> 71 SO Overfill Valve in Tank Shut off Level Worksheet Tank ID Tester DW <br /> Imoortant: This is meant to be supplemental worksheet and not a substitute to following the installation <br /> manual instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br /> tion(AHJ)and review local,state,and national codes to determine the regulatory requirements governing <br /> shut-off capacity in your region,as well as take into account other considerations such as extreme tank tilt. <br /> Take the following measurements with the valve in- <br /> stalled in the tank: <br /> Distance from the 71 SO inlet tube flange to the cast <br /> lug in the 71 SO body(see figures),upper tube length. <br /> Note: the Upper Tube Length must be at least 16"to in- <br /> clude the protective bend in the tube. <br /> (D) <br /> Distance from the 71 SO inlet tube flange to the top and J �� <br /> bottom of lower tube,valve length. <br /> (w) (D) <br /> Upper <br /> (U)=-1Tube <br /> Distance from the 71 SO inlet tube flange to the bottomof the tank. Note:If a tank bottom protector is present it <br /> may be necessary to add this thickness to dimension �� <br /> (OPW 6111 &61 TP models add 0.6") (W)Valve <br /> (B)= i �oS 1� Length, <br /> bottom of <br /> From the tank calibration chart provided by tank manu- cut <br /> facturer find the dipstick number(Y) which corresponds <br /> to the 1000/ volume. (B) <br /> (Y)4 To Tank X <br /> (Y) <br /> 1. To determine shut-off percentage: Tank <br /> Subtract upper tube length (D)from distance to tank (U)Valve Chart <br /> bottom (B) Length, 100% <br /> (X) =(B) -(D)-2"_ /yy. r top of cut � Volume <br /> Dipstick <br /> Using the tank calibration chart provided by the tank ` <br /> manufacturer determine the tank capacity at the cal- <br /> culated (X)dimension and the 100%volume(Y)tank <br /> capacity. <br /> (X)tank capacity in gallons= �l 0 3J� > >��- 1i2 <br /> (Y)tank capacity in gallons= _ <br /> - <br /> SO% - -- <br /> = (X)capacity/(Y)capacity x100 <br /> Note: The overfill valve must be installed per AHJ require- <br /> ments and all applicable local,state,and national codes. If <br /> the overfill valve is set above the allowable shut-off percent- <br /> age the overfill valve must be removed and replaced. For <br /> reference 40 CFR part 280 Subpart B Section 280.20 overfill <br /> valves should be set to a maximum of 95%. <br /> 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.