My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013926
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRIDER
>
692
>
2600 - Land Use Program
>
PA-2100020
>
SU0013926
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2021 11:11:28 AM
Creation date
3/8/2021 4:26:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013926
PE
2666
FACILITY_NAME
PA-2100020
STREET_NUMBER
692
Direction
W
STREET_NAME
GRIDER
STREET_TYPE
WAY
City
STOCKTON
Zip
95209-
APN
07014035, 07057013
ENTERED_DATE
2/17/2021 12:00:00 AM
SITE_LOCATION
692 W GRIDER WAY
RECEIVED_DATE
3/5/2021 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21SJCOG, Inc. <br />Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs. <br />Upon issuance of fully executed ITMMs and prior to any ground disturbance, the project applicant must: <br />a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage being covered (the bond <br />should be valid for no longer than a 6 month period); or <br />b. Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered; or <br />C. Dedicate land in -lieu of fees, either as conservation easements or fee title; or <br />d. Purchase approved mitigation bank credits. <br />Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs first, the project applicant must: <br />a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered; or <br />b. Dedicate land in -lieu of fees, either as conservation easements or fee title; or <br />C. Purchase approved mitigation bank credits. <br />Failure to satisfy the obligations of the mitigation fee shall subj ect the bond to be called. <br />Receive your Certificate of Payment and release the required permit <br />it should be noted that if this project has any potential impacts to waters of the United States [pursuant to Section 404 Clean Water Act], <br />it would require the project to seek voluntary coverage through the unmapped process under the SJMSCP which could take up to 90 <br />days. Itmaybe prudent to obtain a preliminary wetlands map from a qualified consultant. if waters of the United States are confirmed on <br />the project site, the Corps and the Regional Water Quality Control Board (RWQCB) would have regulatory authority over those mapped <br />areas [pursuant to Section 404 and 401 of the Clean Water Act respectively] and permits would be required from each of these resource <br />agencies prior to grading the project site. <br />If you have any questions, please call (209) 235-0600. <br />Planning Commission Staff Report, PA -2100019, 20 (GP, ZR) <br />Response Letters <br />
The URL can be used to link to this page
Your browser does not support the video tag.