Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for CIRCLE K as of October 28 , 2021 . <br /> Open violations from March 09 , 2021 inspection <br /> Violation #205 - Failure to have current UST Monitoring Plan readily accessible at the facility . <br /> OBSERVATION : An approved copy of the monitoring plans were not available for inspection. <br /> REGULATION GUIDANCE : A copy of these plans shall be accessible on site at all times . <br /> CORRECTIVE ACTION : Immediately locate and retain a copy on site . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #304 - Failure to construct, operate , and maintain primary containment as productAight. <br /> OBSERVATION : Oily liquid was observed in under containment ( UDC) sump , UDC 11 / 12 , indicating a leak in the <br /> primary containment. <br /> REGULATION GUIDANCE : All primary containment for the UST system must be product tight. <br /> CORRECTIVE ACTION : Immediately have a properly licensed , trained , and certified contractor repair or replace the <br /> failed component(s) , under permit and inspection of the EHD if necessary . <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date) : <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation : <br /> Violation #305 - Failed to maintain secondary containment (e.g . failure of secondary containment testing) . <br /> OBSERVATION : Approximately two cups of brine was found in the 91 and diesel STP sumps indicating a leak in <br /> the secondary containment. <br /> REGULATION GUIDANCE : Secondary containment shall be impervious to the liquid and vapor of the substance <br /> contained and constructed to prevent structural weakening as a result of contact with any hazardous substances <br /> released from the primary containment. <br /> CORRECTIVE ACTION : Immediately contact a properly licensed , trained , and certified contractor to make repairs <br /> to the UST system under permit and inspection of the EHD . <br /> Page 2 of 3 <br />