Laserfiche WebLink
(V Ln <br /> (- <br /> CONSTRUCTION STAKING LIABILITY WAIVER U <br /> 1. THESE IMPROVEMENT PLANS HAVE BEEN PREPARED WITH THE INTENT THAT THE FIRM OF <br /> HAWK/NS & ASSOCIATES ENG/NEER/NG, INC. WILL PERFORM THE CONSTRUCTION STAKING FOR _ <br /> THE COMPLETE PROJECT, IF, HOWEVER, ANOTHER ENG/NEER/NG AND/OR SURVEY/NG FIRM <br /> SHOULD BE EMPLOYED TO USE THESE PLANS FOR THE PURPOSE OF CONSTRUCT/ON STAKING, <br /> iv NOTICE /S HEREBY GIVEN THAT THE FIRM OF HAWK/NS & ASSOC/A TES ENG/NEER/NG, INC. WILL U <br /> NOT ASSUME ANY RESPONSIBILITY FOR ERRORS OR OM/SS/ONS, IF ANY, WH/CH MIGHT OCCUR N <br /> AND WH/CH COULD HAVE BEEN AVO/DED, CORRECTED OR M1T/GATED /F HAWKINS AND I� <br /> ASSOCIATES ENG/NEER/NG. INC. HAD PERFORMED THE STAKING. <br /> 0 <br /> MONUMENT PRESERVATION RED INC ARCHITECTS <br /> 1217 J STREET, MODESTO, CA 95354 <br /> 209.522.8900 <br /> J <br /> 0 1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF ALL SURVEY <br /> I L MONUMENTA TION AND REFERENCE POINTS WH/CH MA Y BE LOST OR DISTURBED AS A RESUL T SEAL: <br /> 10"sS SE INV=9.68 y I_-------- I ° OF THE WORK. <br /> Q / 8"SS(W)INV=9.68 h �' r <br /> / I " 2. PRIOR TO THE START OF CONSTRUCTION THE CONTRACTOR SHALL VERIFY THE LOCATION OF <br /> w y -------------------- ------------ -- I <br /> / / 4 v - -- -- - -- - - II " MONUMENTATION WH/CH MAY BE DISTURBED. HE SHALL BE RESPONSIBLE FOR THE <br /> Q <br /> U / / I PRESERVATION OR REPLACEMENT OF ALL SUCH MONUMENTA TION /N COMPLIANCE WIN 8771 <br /> n l� <br /> n / LZZLZ�SLZ�LZ�LZc�LZ�LI y ° OF THE BUS/NESS AND PROFESS/ONS CODE AND SECT/ONS 7325, 1492.5 AND 1810.5 OF <br /> c� I o III THE CALIFORNIA STREETS AND HIGHWAY CODE. <br /> / I ° u <br /> J. THE CONTRACTOR SHALL EMPLOY A LICENSED SURVEYOR TO SET TIES TO ANY MONUMENT <br /> ry <br /> a_ / ',� / / �, THAT MAY BE DISTURBED OR LOST DURING THE COURSE OF THE WORK. SUCH TIES SHALL <br /> o / ° / / I , I °I BE SET IN L OCA TION THAT WILL NOT OTHERWISE BE DISTURBED. <br /> w <br /> 4. THE CONTRACTOR SHALL BEAR ALL COSTS OF SURVEY, RE-SURVEY, REFERENCE TIES, <br /> J ��, I I REPLACEMENT CORNERS, CORNER RECORDS, MAPPING, CHECK/NG AND RECORDING FEES <br /> WH/CH MAY BE REQUIRED AS A RESULT OF LOSS OR DISTURBANCE OF MONUMENTATION <br /> WH/CH MAY OCCUR DURING THE COURSE OF THE WORK. <br /> I III I II " <br /> II I II " <br /> / <br /> SSMH RIM=17.83$ t` <br /> CALL BEFORE YOU DIG <br /> 8„ss(SE)lNV=1o. 3 y ------ - - - ------------------ ----------------------------- -------- -------- -------- -------- -------- -------- ----- I III CONSULTANT: <br /> 6"SS(N W)IN V-I O. J <br /> o ° / - -- ' - - - '- - - ' _ ________ __ _ _ _ __ _ __ _ _ __ _ ___ ___ _ _ __ _ ___ _ ___ ___ _ _ __ _ __ _ _ __���ti�i��L���sLoLOZ�L��tir�t�z�Lvt�Lt� d II 1. BEFORE PLANT/NG TREES, TRENCH/NG, POST HOLING, BLAST/NG, GRAD/NG, EXCAVATING, <br /> v , � 16"SS(W)lNV=70.0 I W <br /> �, I illi II BOR/NG, DR/LL/NG, ETC. CALL UNDERGROUND SERVICE ALERT FOR UNDERGROUND [� <br /> CLEARANCE. THEY WILL LOCATE AND MARK UNDERGROUND FACILITIES, OR PROVIDE THE <br /> NECESSARY L OCA TION /NFORMA TION TO YOU. j y� <br /> m � � <br /> Cf1 VVT--�11 <br /> = <br /> C° I III III II `�'U hW-I V) 00 <br /> IIII x c) <br /> ' II II <br /> 1 e __ SSMH RIM-17.66 [ n{0ST0�]C o U0LDDQ�]C ' <br /> - n i w O O <br /> " Q .Ni <br /> u / / , + SS(E,W)lN V--9.76 � 11 1 I IIII o o Q+ � `o Q ' <br /> TIE /N TO EX/ST G SS STUB SSMH RIM=17.68 J <br /> u VER/FY EXl TING INVERT r ,i �o <br /> SSVH RIM=17.25 / �� SS(E)INV=9.88 <br /> n W w <br /> p' 6" S(S)IN V=10.54 <br /> ' a SSMH RIM=fX 8" S(E)lNV=10.54 ' � , , I I III <br /> 6"SS(N,W)INV=10.77 <br /> I III ' I II <br /> „ SDM R1M=17.30 „ SOD/ RIM=15.96 <br /> I 24" D(E,W)NV=10.10 ° 8 SD(W)lNV=13.87 <br /> J III II II 3a <br /> y __________ __ ___ _____ 1. I III II <br /> I L��pt\ZpZ�ZUZ�'aUZ�1Ut:'aVZ[i�Zr1ti--------- --------- -- ---- ------Z��Z� ��ZZUZr'aUZ'Z^---- -- -- -- ------- -- ---- --- <br /> 12"�D(S)IN =10.20 „g SDDI R1M=17.00 <br /> _ 8 SD(S)INV=12 95 _ SDDI RIM=16.20 SOD/ RIM=17.00 SDDI RIM=17.25 1 I, II <br /> 12"SO(W)INV=12.95 8 SD N,S/NV=13.41 1 11, <br /> ( ) 8"SD(W)lNV=14.26 8"$D(W)lNV=14.60 I u II <br /> II , II " <br /> 8"SS 8"SD 92 LF 8"SD $"SD 8"SD 218 LF 8"SD 8'Sp <br /> CONNECT TO �F 6 S=.0050 _ _ S=.0050 <br /> 11 II <br /> EX/ST/NG SEWER oos ss o 0 0 - - - - - - ° ° ° ° <br /> n <br /> 0 �I ❑❑ I II I I I III II <br /> SOCO RIM=17.78 II <br /> 8'SD(N)INV=14,50 II <br /> 0 <br /> u �o o SD WYE EX/ST/NG FIRE HYDRANT AND I " <br /> SD WYE 8'SD(N,S)INV=14.16 <br /> °�o VALVE TO BE ADJUSTED TO GRADE o 0 <br /> 11 � 0 8"SD(N,S)lNV=13.77 <br /> SOD/ R/M=15.96 ®I I II <br /> INSTALL WATER METER AND <br /> I I I 12'SD(E,W)INV=9.61 REDUCED PRESSURE BACKFLOW o I u b H I LTO N <br /> u <br /> " PROPOSED BUILDING PREVENT/ON DEV/CE PER C/TY OF II II y <br /> U)1 <br /> u I I I � LATHROP STANDARDS FOR II II <br /> LANDSCAPE AND DOMESTIC WATER I " <br /> II <br /> INSTALL DOUBLE CHECK BACKFLOW <br /> HOSE BIB <br /> I o " n0MF W4 TER o PREVENT/ON DEV/CE PER CITY OF Q <br /> u I o I LATHROP STANDARDS FOR FIRE WATER - <br /> u p � o N o BU/LD/NG POC II Z <br /> J SSMH BU/LD/NG POC BUILD/NG POC I EX/STING WATER " 0 <br /> CONNECT TO <br /> O <br /> c" I J II ° 6'SS(W)INV=1240 <br /> 16 LF 6" WATER- W " Q <br /> pJ 0 <br /> 1� ° <br /> 11 I 1"W o <br /> \25, <br /> LLF6 ATE? F� lil 11 <br /> 1 0 <br /> 0 - <br /> o 0 0 0 o <br /> 6��FS <br /> oo�o <br /> e0000 <br /> W <br /> I <br /> UTILITY CROSSING0025 LF 4" WATER � <br /> cn Q 15 LF 6 WATER <br /> BOTTOM 6 SS=11.25 9) <br /> 11 I TOP 12'SD=9.35 ° 33 LF 4" WATER W <br /> 11 I I I I 6"SS 209 LF 6"S5 i 8"SS J � LANDSCAPE <br /> S=.0050 121 LF 4" WATER �, WATER POINT 0 <br /> u 4' 4 W I OF CONNECTION <br /> u I I I SMH <br /> RIM=16.46T I 1 <br /> v I1 I 6' S S,E/NV=11.21 <br /> 1 ( ) SDMH RIM=16.05 SSMH RIM=17.33 <br /> I SDMH RIM=16.09 12"SD(N, INV=9.45 6 SS(NE)INV=1225 <br /> I ( ) SDMH R/M=16.62 <br /> a I I 12'SD(NW,E,S)lNV=9.45 12 SD(N,W)INV=10.32 <br /> II II � a <br /> c- ° I 12"SD 46 LF 12"SD 12"SD 174 LF 12"SD <br /> u 1 S� 5=.0050 S=.0050 0 <br /> Q I 1105 o o ELECTRIC TRANSFORMER <br /> u I SDMH fl'IM=1 .98 <br /> 0 No No i1 <br /> u I � ii• SDDI R/M=15.54 � II <br /> 0 24"SD( ,W)/ V=8.08 o o SDDI RIM= EX/STING ELECTRIC BOX <br /> 12 SD(E)INV=9.55 ,� O <br /> I12 SD(E)INV=10.42 I \� <br /> o " - SD <br /> �I I T CONNECT TO <br /> 00 <br /> c EX/STING STUB7•n" <br /> cn a, ' ) r, <br /> II 1 �� ) ��.,.7i ).j� � ,4 ) �) rr�� L -�) - �,'") � •�� ) 11 II <br /> 'l �,°,L 1 <br /> Q u TIE INTO EX/STING SD STUB , <br /> Q u VE /FY EXISTING INVERT t <br /> 5� a SDMH RIM=16.86 fx 'ir x�? ,•nc' " 0 <br /> U II I I �-------- --- ---- --- ---- ------ <br /> ---- _- -,d-- =-T.F ) }: 4' a F7 - ___-____ �''�iar-,l =___- _ `^ __ -__ __=" _E_�~ l� <br /> II 1 ) 7 r7 N1 )!); <br /> 11 18 SD(SE)1NV=9.00 s. � �y: 11 <br /> EX 18"SD(N)INV=9.00 I <br /> II <br /> Z <br /> I <br /> \ I\ __ III II II Q <br /> 4J �, I \-_ 1 1 III ° II � <br /> .Q I 11 1 <br /> R <br /> 0 <br /> 0 1 I IIII „ Z <br /> II <br /> U li 11 1 <br /> - - - - - - - - - - - - - - - - - - - - III I II <br /> O <br /> U II , 111 II II <br /> U 11 , 111 11 11 O <br /> Q Q <br /> , I I I( I I �' 11 111 I II III U <br /> REVISIONS: <br /> 'I I I I II I u II -- -_----------------- 1 111 I II II <br /> U I I � � II II II II <br /> I I p II II I I II I II <br /> 11 II 1 II II ' II II 11 <br /> T PLANNING 10/05/2018 <br /> --------- --------- --------- --------- --------- --------- ----- �/ , II 111 I I II II <br /> r� <br /> --------------------------------------- - --- c�UZc��"J �`_ --------------------------------- <br /> ti !� II IIII II Q2 HILTON 10/18/2018 <br /> II I II 1 U ,� II 111 11 �� <br /> 'I I II I 111 <br /> II I II I 1 LL= I II I I 19 1 I � II <br /> 'I II I �� LOT�10v1 �Z�'aUt <br /> I}J I II III I <br /> V i�1O-0 ati�ZUZ�Zpt� i �Lv1 1 1 1 u II II <br /> J I I 1 1 A <br /> I I II <br /> � 111 I <br /> L <br /> II 1 1 II B <br /> I II I � VV � I I I III I 11 II <br /> SDMH IM=16.159 I ,l <br /> 4 RIM=15. 4 I <br /> � 24"SD(�W)lNV=70.19 <br /> I I I 111 I 0 Y <br /> o D(SW INV= 0V <br /> 18"SD( )l V=10.19i <br /> 18"SD18"SD )NV=10.49 MM (��(��` <br /> U � EMSTI]NO B UL ��CdJ II 1 111 II <br /> I ° RED PROJECT # 18050 <br /> I II I II I II 1, I II HILTON # 18-428ND <br /> II III II <br /> L I I 111 1 III <br /> PLANNING # SPR-18-102 <br /> sO I II i I rLt�Zr �h d � I 11 � IIII I 11 <br /> PERMIT # - <br /> I � <br /> - - _ I11 1 VIII 11 APN # 196-270-23 <br /> IIrLtZr�y1 <br /> N \ 11 n �� II 111 II <br /> C-) I v ��OLZUZ�LLL3LL=_=L=_=JJ DATE: 01.07.19 <br /> Q N + Ir_ L <br /> I SDMH RIM-15.6J n u <br /> 18"SD NElNV=10.93 a J _______________� DRAWN: - <br /> --- <br /> � I I I II r ----------- ---------� �.��a�.r.-. -.- .-.-.-.-.-'^-.-'--- -- --- - - - - - �--------------------- I 111 <br /> CHECKED: <br /> Q <br /> 0 <br /> U <br /> a� <br /> SHEET TITLE: <br /> COMPOSITE UTILITY <br /> PLAN <br /> 0 <br /> 0 <br /> Q <br /> SHEET NO.: <br /> 0 <br /> 20 O 10 20 40 <br /> co <br /> C7 <br /> SCALL : 1=20' <br />