Laserfiche WebLink
I- <br /> U <br /> GENERAL STORM WATER MANAGEMENT NOTES wLi <br /> 1. CONSTRUCT/ON SITES ARE COMMON SOURCES OF STORM WATER POLLUTION. MA TER/AL S <br /> N AND WASTES THA T BLOW OR WASH /N TO A STORM DRAIN, GUTTER, OR STREET HAVE A U <br /> DIRECT IMPACT ON STORM WA TER POLL UT/ON. THE CONTRACTOR OR OWNER MA Y BE <br /> RESPONSIBLE FOR ENVIRONMENTAL DAMAGE CAUSED BY SUBCONTRACTORS OR EMPLOYEES <br /> 2. COVER EXPOSED PILES OF SOIL OR CONSTRUCTION MATERIALS WITH PLASTIC SHEET/NG OR <br /> C) TEMPORARY ROOFS BEFORE I T RAINS, SWEEP AND REMOVE MA TER/AL S FROM SURFACES <br /> THAT MAY CONTRIBUTE STORM WATERS TO STORM DRAIN FACIL ITIES, S <br /> RED <br /> J STREET,D INC ARCHITECTS <br /> TTEECTT 95354 <br /> J3. KEEP POLLUTANTS OFF EXPOSED SURFACES. PLACE TRASH CANS AND RECYCLING BINS <br /> 209.522.8900 <br /> CD AROUND THE SITE TO MINIMIZE LITTER. <br /> z <br /> ry 4. CLEAN UP LEAKS, DR/PS AND OTHER SP/LLS /MMED/A TEL Y SO THEY DO NOT CONTAM/NA TE SEAL: <br /> o SOIL OR GROUNDWATER OR LEAVE RES/DUE ON PAVED SURFACES <br /> 0 <br /> Q 5, COVER AND MAINTAIN DUMPSTERS CHECK FREQUENTLY FOR LEAKS. PLACE DUMPSTERS <br /> J WI <br /> UNDER ROOFS OR COVER TH TARPS OR PLASTIC SHEETING SECURED TO THEM. NEVER <br /> CLEAN OUT A DUMPSTER BY HOS/NG /T DOWN ON THE CONSTRUCT/ON SITE. (WM-5) <br /> 6. MAINTAIN PORTABLE TO/LETS /N GOOD WORK/NG ORDER. INSPECT FREQUENTLY FOR LEAKS. <br /> z <br /> 7. REMOVE ANY EX/STING VEGETATION ONLY WHEN ABSOLUTELY NECESSARY. <br /> ry <br /> 8. PROTECT DOWNSLOPE DRAINAGE COURSES, AND STORM DRAINS WITH "WATTLES, SILT <br /> o FENCES, OR DIRT BERMS AS NECESSARY. (SE-5) <br /> II <br /> 9. USE CHECK DAMS OR DITCHES TO DIVERT RUNOFF AROUND EXCA VA TIONS. <br /> I <br /> 10. PRACTICE SOURCE REDUCTION - MINIMIZE WASTE WHEN YOU ORDER MATER/ALS SUPPLY <br /> Q / / ~ I I , u ONL Y SUCH QUAN RT/ES NECESSARY TO COMPL ETE THE JOB. <br /> ' 11. USE RECYCABLE MATER/ALS WHENEVER POSSIBLE. <br /> 12. DISPOSE OF ALL WASTES PROPERLY. MANY CONSTRUCT/ON MATER/ALS AND WASTES, <br /> -FIBER ROLLS ' I INCLUDING SOL VENTS, WATER BASED PA/NTS, BROKEN ASPHALT, CONCRETE, WOOD, AND <br /> N I ' SE-5 PER CASQA ' VEGETATION CAN BE RECYCLED. MATERIALS THAT CANNOT BE RECYCLED MUST BE TAKEN CONSULTANT: <br /> a ' . TO AN APPROPRIATE LANDFILL OR DISPOSED OF AS HAZARDOUS WASTE. NEVER BURY <br /> !I I I WASTE MATERIALS OR LEAVE THEM /N STREETS OR NEAR STORM DRAIN FACILITIES. w <br /> ~o 'I I (WW-6) <br /> z I 1 I Y 13. DESIGNATE ONE AREA OF THE CONSTRUCT/ON SITE, WELL AWAY FROM STORM DRAIN <br /> '- <br /> (� <br /> v_ I I INLETS, FOR AUTO AND EQUIPMENT PARK/NG. AS PRACTICAL, REFUEL/NG AND ROUT/NE <br /> �I <br /> VEHICLE AND EQUIPMENT MAINTENANCE TO BE OFF-SITE AT APPROPRIATE SERVICE <br /> CENTERS <br /> c/) CONCRETE WASHOUT <br /> ELI 14. MAINTAIN ALL VEHICLES AND HEAVY EQUIPMENT. INSPECT FREQUENTLY. (NS-8) W <br /> � X , II <br /> AREA WW-8 PER CASQA I i cz) <br /> 15. PERFORM MAJOR MAINTENANCE, REPAIR, AND VEHICLE/EQUIPMENT WASH/NG OFF-SITE. w <br /> PORTABLE TOILET <br /> CONSTRUCT/ON TRA/LER LOCAT/ON WW- 16, DO NOT USE DIESEL OIL TO LUBRICATE EQUIPMENT OR PARTS. 0 0 <br /> I � W II <br /> SWPPP TO BE KEPT /NS/DE PER CA SOA I--� 17. NEVER HOSE DOWN DIRTY" PAVEMENT OR IMPERMEABLE SURFACES WHERE FLU/DS HAVE O <br /> Y <br /> SPILLED. USE DRY CLEANUP METHODS (ABSORBENT MATERIALS, CAT LITTER, RAGS, ETC.) W 0 2 <br /> 'I WHEN POSSIBLE. IF WATER MUST BE USED, USE JUST ENOUGH TO KEEP THE DUST DOWN. <br /> ' (WW-4) <br /> 18. SWEEP UP SPILLED DRY MA TER/ALS /MMED/A TEL Y. NEVER A TTEMPT TO "WASH THEM AWA Y" <br /> 0 <br /> � WITH WATER, OR BURY THEY. USE AS L/TTL E WATER AS POSSIBLE FOR DUST CONTROL. <br /> �_----- TRASH BIN LOCATION (WW <br /> WA4-5 PER CASQA <br /> 19. CLEAN SP/LLS ON DIRT AREAS BY EXCAVATION AND DISPOSAL OF CONTAM/NA TED SO/LS <br /> M--� <br /> (WW-4) <br /> O <br /> 20. REPORT SIGNIFICANT SPILLS TO THE APPROPRIATE SPILL RESPONSE AGENCIES/MMED/A TEL Y. (KV-4) <br /> l I` <br /> ~ 21. AVOID CREAT/NG EXCESS DUST WHEN BREAK/NG ASPHAL T OR CONCRETE. <br /> Y <br /> xX , IY W � 22 MAKE SURE BROKEN PAVEMENT DOES NOT COME /N CONTACT WITH RAINFALL OR RUNOFF. <br /> I I <br /> x 23. SHOVEL OR VACUUM SAW-CUT SLURRY AND REMOVE FROM THE SITE. COVER OR <br /> I I i BARRICADE STORM DRAIN DURING SAW-CUTTING AS NECESSARY. <br /> x <br /> -STABILIZED CONSTRUCT/ON <br /> 24. STORE BOTH DRY AND WET MATERIALS UNDER COVER, PROTECTED FROM RAINFALL AND <br /> ENTRANCE TC-1, TC-3 o " RUNOFF. PROTECT DRY MATER/ALS FROM W/ND. <br /> FIBER ROLLS I , <br /> PER CASQA SE-5 PER CASQA 25. SECURE BAGS OF CEMENT AFTER THEY ARE OPEN. BE SURE TO KEEP WIND-BLOWN <br /> y CEMENT POWDER AWAY FROM GUTTERS, STORM DRAINS, RAINFALL, AND RUNOFF. <br /> I , <br /> SD <br /> 26. WASH OUT CONCRETE MIXERS ONLY /N DESIGNATED ON-S/TE WASH-OUT AREAS WHERE b HILTON'" <br /> POSSIBLE, RECYCLE WASHOUT BY PUMP/NG BACK INTO MIXERS FOR REUSE. NEVER Y <br /> --- _ _ _ _ - _ _ OF WASHOUT INTO STREETS, STORM DRAINS, DRAINAGE DITCHES OR BAS/NS <br /> � � �:} �. � � Y DISPOSE TS, NS, <br /> c�0 '' ,1 �'�, -' .i •�' �.-___- -------_ t% ,,-� �- i �'�' ), •�) � �� � ' ° y (WM-Yg) <br /> r 27. CONTRACTOR SHALL INSTALL A CITY APPROVED WASH-OUT STRUCTURE AT THE PROJECT <br /> kA:4� �'��„?dry �`'� t.' X y V <br /> St TE AND ALL "F/NES" MUST BE WASHED OUT /N DESIGNATED WASH-OUT STRUCTURE,• Q <br /> INCLUDING ALL CONCRETE, PA/NT, STUCCO AND ALL OTHER LIQUIDS, <br /> Z <br /> 28. PLACE "WATTLES" OR OTHER EROS/ON CONTROL DOWN-SL OPE TO CAPTURE RUNOFF <br /> " CARRY/NG MORTAR OR CEMENT BEFORE IT REACHES THE STORM DRA/N. (SE-5) � <br /> I r-------------- III II I I J <br /> r 29. WHEN BREAK/NG UP PAVING, THOROUGHLY CLEAR ALL PIECES AND DISPOSE PROPERLY Q <br /> r ' ' RECYCLE LARGE CHUNKS OF BROKEN CONCRETE AT A LANDFILL. DISPOSE OF SMALL U <br /> AMOUNTS OF EXCESS DRY CONCRETE, GROUT, AND MORTAR AT AN APPROVED DUMP SITE <br /> '--__- <br /> I I F-1 <br /> � �1 - - -- I A I " ; I ' 30. CONTRACTOR SHALL PROVIDE PAVEMENT SWEEP/NG AS NECESSARY TO KEEP THE ROADS <br /> u �o ; " AND PARK/NG LOT CLEAN AROUND THE PROJECT AREA. <br /> GRADING PHASE 31. THE STRAW WATTLES SHALL BE INSTALLED CONTINUOUSLY AROUND THE PER/METER OF <br /> THE PROJECT AREA AND REMAIN /N PLACE UNTIL LANDSCAPING /S COMPLETED. <br /> SCALE: 1"-JO' <br /> 32 CONTRACTOR SHALL INSTALL DRAIN INLET PROTECT/ON FOR ALL CATCH BAS/NS LOCATED <br /> IN THE WC/N/TY OF WORK THIS INCLUDES ANY CATCH BAS/NS L OCA TED /N THE PUBLIC <br /> RIGHT-OF-WAY, AS WELL AS ANY ON-SITE CATCH BAS/NS.. o <br /> 33. CONTRACTOR SHALL INSTALL A STABILIZED CONSTRUCTION ENTRANCE/EGRESS FROM O <br /> PROJECT SITE TO PREVENT TRACKOUT OF SEDIMENT ONTO THE PUBLIC RIGHT-OF-WAY <br /> v FROM CONSTRUCTION VEHICLES <br /> 34, CONTRACTOR SHALL ENSURE THAT CONSTRUCT/ON OR DEMOLITION ACTIVITIES DO NOTDEPOSIT SEDIMENT ONTO THE PUBLIC a <br /> AND CONS TRUCTION DEBRIS MUST BE REMOVED B ADWAY SIDEWALKS, <br /> END OFDEACHT WORK/NG DAERS. ALL D/MENT O <br /> Q <br /> 35. CONTRACTOR SHALL USE STREET SWEEP/NG OR OTHER DRY-SWEEPING METHOD, AS � o <br /> NECESSARY, TO REMOVE CONSTRUCTION OR DEMOLI TION-REL A TED SEDIMENT FROM PUBLIC <br /> III ' V SIDEWALKS, GUTTERS, AND ROADWAY. <br /> 36. CONTRACTOR SHALL SCHEDULE WORK FOR DRY-WEATHER DAYS WHEN NO RAIN /S THE <br /> O <br /> � 0 III II I u IMMEDIATE FORECAST <br /> 'I 37. CONTRACTOR SHALL PROVIDE DUST CONTROL TO PREVENT THE NUISANCE OF BLOW/NG <br /> C777 / / I <br /> FIBER ROLLS I ' ' DUST WITHOUT CAUS/NG SED/MENT DEBR/S, OR LITTER TO ENTER THE C/TY STORM DRA/N �° <br /> SE-5 PER CASQA I SYSTEM. <br /> � I <br /> E CA TCH BASIN CATCH BA SIN CATCH BASIN CATCH BASIN CA TCH BAS/N <br /> o l PORTABLE TOILETPRO ' o <br /> 2 PROTECTION PER PROTECT/ON PER PROTECTION PER PROTECTION PER TECT/ON PER <br /> LOCATION WM-9 <br /> I ' CASQA SE-f0 PER CASQA CASQA 5E-10 CASQA SE-10 CASQA SE-10 CASQA SE 10 ^ 0 <br /> ' I O <br /> 1 - _ I 111 � <br /> ° ° ° ❑❑ g < <br /> El ❑❑ ❑❑ °I o <br /> ou I CONCRETE WASHOUT , !I <br /> AREA WW-8 PER CASQA , 0O <br /> o n I i <br /> TRAILER CONSTRUCTION L E I ° , <br /> U <br /> � I SWPPP TO BE KEPT INSIDE I I � � W 11 � � <br /> PROPOSED BUILDING ° Rftf <br /> � CATCH BAS/N �7 I <br /> o PROTECT/ON PER I ; , f�T� U) _ <br /> CASQA SE-10 ° ° ° l-�-I ; O Q <br /> I u <br /> _____- --TRASH BIN LOCATION I ° " <br /> u <br /> WW-5 PER CASQA I 2 <br /> REVISIONS: <br /> ... <br /> 00°00 <br /> - - - oevae�e��voavov0000�ewovoss000aoaoevo�000soaoaoaoao��eee�oo - - - - - - - - - I II <br /> - ° ° ° I II <br /> PLANNING 10/05/2018 <br /> a I <br /> o vooe O HILTON 10/18/2018 <br /> STABILIZED CONSTRUCT/ON = P � © ,oP�H��� ❑� <br /> � ENTRANCE TC-1, TC-3 X X � I J 1 VI <br /> PER CA SOA x ' <br /> u , I <br /> - ca TCH BASIN <br /> x <br /> PROTECT/ON PER <br /> o CASQA SE-10 , <br /> c FIBER ROLLS " <br /> ~ CATCH BASIN <br /> SE-5 PER CASQA <br /> PROTECT/ON PER <br /> CASQA SE-10 ' <br /> 'I Y <br /> u � I <br /> o SD I <br /> � c�0 �' .,1' i�� ., i ."i' ,_ -__- -- - � "�" �' Say i ,�� ),. .'•�; ? ,��i � ' I Y <br /> RED PROJECT # 18050 <br /> X LEGEND <br /> ;,, ° :• z ' HILTON # 18-428ND <br /> PLANNING ## SPR-18-102 <br /> o " aY PERMIT ## <br /> a r--- ----- - - - - - - I FIBER ROLLS <br /> AREA OF PROPOSED CONCRETE (SEE SPECIFICATIONS AP N ## 196-270-23 <br /> ON GRADING PLAN) KRISTAR SLOPEGARD 1 SE-5 PER CASQA <br /> FIBER ROLL, OR EQUAL <br /> DATE: 01.07.19 <br /> DRAWN: - <br /> I F-1 F/BER ROLL CHECKED: <br /> --- - - - ' (SEE DETAIL THIS SHEET) F- 2-p <br /> CONSTRUCTION PHASE <br /> SCALE: 1"-30' CA TCH BA SIN STORM POLL U RON PRO TEC TION <br /> ID PLACE GRAVEL BAGS AROUND PER/METER '!/�!/. !i./' SHEET TITLE: <br /> AND GEO FABRIC UNDERGRADE (TYPE 3, SC-10) <br /> .cn FIBER ROLL DETAIL <br /> CONCRETE WASTE MANAGEMENT (SEE WW-8) PER <br /> cn CAL TRANS STORM WATER QUAL/TY HANDBOOK - 2012 N75 <br /> EROSION CONTROL <br /> PLAN <br /> o ROCK BAGS <br /> 0 <br /> Q <br /> SHEET NO.: <br /> 0 <br /> XX 0 XX XX XX <br /> C9 <br /> SCALE 1"= XX' <br />