|
C14
<br /> Lf)
<br /> I-
<br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 . U
<br /> . W
<br /> SE 3/P0,4 FOR ENLARGED FLOOR PLAN
<br /> PLUMBING SS, GAS, AND VENT FIRST FLOOR PLAN NOTES IE
<br /> 04 H - SEE CIVIL PLANS FOR CONTINUATION, U
<br /> �5 2❑ OFFSET SS IN CEILING SPACE AND UP INTO CHASE ON FLOOR ABOVE. SEE P2 Q
<br /> ❑ ❑5 ' I _\ r RED INC ARCHITECTS
<br /> 6 5 = 3❑. SPILL 1" TAILPIECE FROM ICE MACHINE F60 AND 3/4" TAILPIECE FROM ICE 1217 J STREET, MODESTO, CA 95354
<br /> ' 6 - 2os.s22.ssoo
<br /> -----
<br /> Q ; I ----- O BIN FBO TO FS-1.
<br /> Z 3'G r _ O
<br /> o
<br /> DEVELOPED
<br /> _ ❑5 ❑5 _� -- PER CPC 711,1 DRAINAGE C❑NNECTI❑NS SHALL NOT BE MADE INT❑ A SEAL:
<br /> Q0 PGE METERAS DE PED L - 250' O O /' ii'f fl -----� `---I V DRAINAGE PIPING SYSTEM WITHIN 8 FEET OF A VERTICAL TO
<br /> D Ai H❑RIZ❑NTAL CHANGE OF DIRECTION OF A STACK CONTAINING
<br /> ----
<br /> (� - II I
<br /> GA S _ GAS G S GAS GAS GAS GAS AS�GAS GA GAS GA AS GAS GAS ° u' I r r---- SUDS-PRODUCING FIXTURES. TYPICAL FOR ALL WASTE STACKS CONTAINING c,\ONAL F
<br /> DEMAND 3 0 CFH
<br /> 0 G 7 3 G J I I c�_1 � ® BATHTUBS, LAUNDRIES, WASHING MACHINE STANDPIPES, KITCHEN SINKS, �,� G G.
<br /> N _ 1293 CFH O III I I I J _ I___J I r AND DISHWASHERS. PARALLEL SS TO WASTE RISERS SHOWN ON DRAWING
<br /> !FSEE 1/P .4 IF _NLA GE F LAN ci I P-1 7 1� - O TO COMPLY W/ CPC,
<br /> ° a I a
<br /> a ° �� 1 00 ° Cl) a I I 13 L---- 0 3/4" C❑ND FR❑M AB❑VE, SEE 1/P2 FOR CONTINUATION, SPILL " "� : s-3o-2 Q
<br /> CONDENSATE LINE TO DRY WELL IN SIDEWALK, DRY WELL TO BE 12'0,
<br /> �, CFH I PO 10' DEEP LINED WITH SCH 120 PIPE AND BACK FILLED WITH GRAVEL, AN��'PO��
<br /> c, H P-1 1 • - • ° - MINIMUM SIZE 1", MAZIMUM SIZE 1-1/2" TAMP OUTSIDE ❑F DRY WELL F �F
<br /> �w -----�" --- ---- ------ = D ❑ D a i I S OF C P�-
<br /> ' ® 0,3 II 0,3 \ / �� I CASING TO PREVENT COLLAPSE, DRY WELL TO HAVE COVER.
<br /> Q 4"SS 4 SS o � "!! � -
<br /> - _ o_ o _ _ cl o� © TIE 3/4" C❑ND FROM PTAC- TO 3/4" C❑ND FROM ABOVE, SEE 1/P2 FOR
<br /> ❑1 4 - _ _ D�� ° ° D _ _ .\ 1 4'FCa y I B B S 2'S SS J C❑NTINUATI❑N. SPILL CONDENSATE LINE TO DRY WELL IN SIDEWALK, DRY
<br /> J I I 4 SS SS 4 SS _ F
<br /> 4 SS GT-1 (2)4"Hv ' , t0,3 4 SS O I 1 A - P0,3 WELL TO BE 12'0, 10' DEEP LINED WITH SCH 120 PIPE AND BACK FILLED
<br /> -4 \ ---- PO B L B _ _ B 2 B - - IL I P0,3 P0,3 _ _ WITH GRAVEL MINIMUM SIZE 1" MAZIMUM SIZE 1-1/2", TAMP OUTSIDE ❑F
<br /> X D 7� �G L -GL G P0.3 2'S 'ss P0.3 P0,3 2'SS I, GAS Gas A A s - - DRY WELL CASING T❑ PREVENT C❑ELAPSE, DRY WELL T❑ HAVE C❑VER, CONSULTANT:
<br /> 4"YC❑ `� B n I A Ll
<br /> o L - - J4 B B B A 129 CFH P0,3 A 3/4"C❑ND FR❑M HVAC EQUIPMENT W/CP-1. SPILL T❑ DRYWELL PER N❑TE ❑ ❑
<br /> B P0,3 P0,3 P0,3 I P0,3 P0,3 5,6 b 8
<br /> Z B Com 2'S 'SS 2'SS -
<br /> U ❑ ❑
<br /> w C P0,3 i I 0.3 2 2 P0, r r 3 ll = DF-1 - 2'S L- 2•ss L - - - - A - �. z� o 04 ❑
<br /> w P0,3 4" 4'SS 2 ,
<br /> A
<br /> - - i 2 SS F - I ,H Hv 4 S I •sS P 0.3 I I Z W
<br /> O I �D-1 I 2"SS - 'SS I I 2'S , N l e
<br /> - 77
<br /> U) 2'SS 6 -FS-1 -- 2' v L 6 YCO FIXTURE CONNECTION SCHEDULE - DFU'S FOR GREASE TRAP HYDRO DYNAMIC W 8 � ❑ ❑
<br /> ® 6"FC❑ - -_ " �4'SS \ 6'SS 4 4y \ 6'SS CONNECTION SIZES TANK SIZING 00 W ❑ ❑
<br /> 6'YC❑ 1-1/2'G RISER 4 4 D S 'Hv .v 4 ° • B 4 ° ° PLUMBING SANITARY DFU'S TOTAL HYDRO EQUIV N Z ® ❑ ❑
<br /> • m � ea � oo ❑
<br /> 0 P0,3 � r--___ __ __ FIXTURE QTY SEWER FU FU DFU'S GPM � Z � � N �❑ �
<br /> D
<br /> �P1 I �.5 0 '� o o C,3 ', � 0 El 7- ❑
<br /> _ 0 0 FD - 1-1/2" KITCHEN 2 2" 4 8 10 25 ❑ N
<br /> 0 - I _ ----- ----- ----- MOP SINK 1 2" 4 4 5 12.5 F1 Ll
<br /> 7 D O O D ❑ Frl- --- 0 ® FLOOR SINK 2" SCULLERY 4 2" 4 16 20 50 U11 E
<br /> --- TOTALS 7 28 35 87.5 W
<br /> C33 CL-D
<br /> 5 T
<br /> g - - - - - - - - - - I -
<br /> ❑ 0 0 7 O L----- ----J O USE 100 GALLON MIN FOR THIS APPLICATION
<br /> - - - - - - - -
<br /> _ _ = 5 _- _- - � _- _7
<br /> IL I
<br /> TABLE 120.3-A Pipe insulation Thickness
<br /> O FLUID CONDUCTIVITY INSULATION NOMINAL PIPE DIAMETER(in inches)
<br /> TEMPERATURE RANGE MEAN <1 1 TO< 1.5 1.5 TO<4 4 TO<8 8"and
<br /> G A S S I Z I NG TABLE RANGE F) hour utpe sq are TEMu-inch per PERATURE INSULATION THICKNESS REQUIRED(in inches)TING I larger
<br /> foot per°F) (°F)
<br /> 71WC DEVELOPED PIPE CFH Space heating,Hot Water systems(steam,steam condensate and hot water)and Service Water Heating Systems(recirculating sections,all
<br /> L/ piping in electric trace tape systems,and the first 8 feet ofpiping from the storage tank for nonrecirculating systems)
<br /> Above 350 0 0.32-0.34 250 4.5 5.0 5.0 5.0 5.0
<br /> 250' 1/2" 30 251-350 0.29-0.31 200 3.5 4.0 4.5 4.5 4.5
<br /> SIZES FROM TABLE 201-250 0.27-0.30 150 2.5 2.5 2.5 3.0 3.0 by HILTON'"
<br /> 1216.2(1) 3/4" 63 141-200 0.25-0.29 125 1.5 1.5 2.0 2.0 2.0
<br /> 105-140 0.24-0.28 100 1.0 1.5 1.5 1.5 1.5
<br /> 2016 CPC 1" 119 Space coolings stems chilled water, refri erant and brine
<br /> PLUMBING SS, GAS, AND VENT FIRST FLOOR PLAN o.5 0.5 75 NON RES NON RES 1.0 -
<br /> 1-1/4" 244 RES 0.75 RES 0.75 Q
<br /> 0.5 0.5 Z
<br /> SCALE:1/8"-1'-0" 1-1/2" 366 Below 40 0.20-0.26 50 1.0 1.5 1.5 1.5 1.5
<br /> O
<br /> 2" 704
<br /> J
<br /> 2-1/2' 1120 Q
<br /> ALL HOT WATER LINES SHALL BE INSUALTED PER THE ABOVE TABLE. O
<br /> NORTH 3' 19so
<br /> _ 7
<br /> O O � ° O
<br /> I I I I I I ° I I I I I
<br /> _ SE 4/P0,4 FOR ENLARGED FLOOR PLAN W
<br /> Vi - - - - - - - - - - - - - - - - - - - - - - - - 0
<br /> G - - - ❑ - -- - - - - - - - - - - -- - - - - - o- -- - - -- - - o =__=__ =_�_ _= - - - - - - - µ � r - - - - - ❑ - - - - - - o - - - - - - GAS SIZING TABLE � a
<br /> LJJ
<br /> � I DEVLELOPED 'L' PIPE CFH IIIIIIIIIIIIII�
<br /> Q - - - - - - - - - - - - �- _- - - - - - - 200'-
<br /> F11
<br /> HW - HW HW H ❑ ❑ I r I -- O SIZES FROM 3 4" 71
<br /> - /
<br /> 0 2 L CE. - - - - _ - - _�, � - � , I I - TABLE 1216.2(1) O
<br /> £ O O 2016 CPC 1" 134
<br /> o I �
<br /> O � it - �!II II � i z\ i
<br /> ----- -----� L 1-1/4" 275
<br /> is ii �'���'��u F11 � -----
<br /> ----
<br /> V) I= / 0,4 F❑R O III III II �I i r----- -----_I 1-1/2" 412 W
<br /> £ - Q ___ 0 2" 794 r
<br /> 1 E) El „� 0 UL]
<br /> CPO
<br /> W r ° _ _ _ _as oo 1-v :Hw ia; 0 P03 -1/41 w 141 U' 2-1/2" 1270
<br /> W L HW H Hv Hv xv HV '
<br /> o o ) ix
<br /> K Q, III I ❑ I - 0_
<br /> O � �IN 3" 2240 O
<br /> LL
<br /> o ° P0,3 I ❑ V °2'C °° /� 4" 4560 0
<br /> 1-1/4"CW 2 .5 FU'S 1/4"C W, FU'S "'' 9 FU'S
<br /> o o °o II 1'HW 120° FU'S W 120 1 FU'S 2 C 4.25 FU II 2'CW 124 FU I 2-1/2'CW b.75 F 'S
<br /> o o J 2'HW 1 ' ZJ2'HW 120° 222 FU 415.75 FU'S 174. 5 FU u
<br /> 1/ ' /` 1/2'HWR �� '@ ER 2- /2'CW 29 .7 F ' I 2-1/2'CW 291.75 FU = I -
<br /> o� 1 140° 2'C 2'H 120° 13 I o o Q
<br /> Q 2'HW 120° 222 FU I _1 1- /2'CW -
<br /> ' I �� ' W 1�0° \ ° 0 2"HW 107. 1� /4'CW°1 U' 1 0
<br /> 0 1° 1 1 HW 120 FUS 2 HW 120° 222 FU
<br /> FU's 61
<br /> S - 12.2 - - - Z
<br /> ` vr�-Hv Hvr� HWR HW HWI- HW H}�WR HW I fR� HWI� H HWI� HW HW W HW HW H HW 1'HW 1 FTT O
<br /> ' AH All AHAl- nH- AH nH-nH MH _ MH H MH _ H _MH - MH _MH MH_ MH MH MH _ _ - H H r HW HW_ -1/4' 1 U'S
<br /> W nH - nH AH-nx nH- MH MH MH M MH MH MH MH MH MH H MH MH MH MH H MH MH MHt:�-AHW
<br /> H MH MH MH MH 'HW 9 U'S O
<br /> 0 Hv -HW ® O HW - HWR HW HWI H R HWR HW HW HW HWR - HW WR HW HWS HWR WR HW H 2'HW 120° 120° ��2'HW 120° O
<br /> � - - ' 2 FLS 1-1 2' W HEADER 15 FU'S 1-1/2'CW 33,25 FU'S 1/2'H R 132.75 FU'S 147.75 FU'S 5 FU
<br /> _0 700Mo ( 0 - /2 W 120° , 5 FU 75-F - - - - ~
<br /> }25 ///// 5 FU'S W 92.25 FU'S DF-1 -2 -2 _ - 12 _
<br /> W 1 (1 1/2'CW 2 Fu's WC-1 O Q
<br /> 12 ° i O o I 4 CW i 9-Fj, °1-1/2' 3 O J
<br /> r r 1-1/ 29 U'S 4 HW 15 S 1-1/4' 18
<br /> V) I I � O 1'H 15 U'S 3
<br /> W/ � P �WC-2 TP-1
<br /> W/�' - � ° � REVISIONS:
<br /> o�� m
<br /> HOH - 0,3 -
<br /> o 1-1/4'cw 2s, Fu's K 1-1 C 28. F IS 1-1/4-CW 2s, Fu's � ---__, - - -_, Q HILTON 10/18/2018
<br /> 0,3
<br /> 1'HW 120° 13. FU'S 3 1"H 'S 1"HW 120° 13, FU'S P 3 1-1/4'CW 28,5 FU' 1-1/i CW 28, F .1
<br /> 1'HW 13.5 FU' L 1-HW 13 P .3
<br /> >, 1-1/4"CW 21.75 FU
<br /> 0 0.3 1'HW 11.25 FU o
<br /> I o 0 1 I I I I I -----i I � I L----- I -----j I I
<br /> ° ° ® ® ®
<br /> ❑ o � a o O o
<br /> 0
<br /> L) 0 - - - - - - - - - - o
<br /> ' L �
<br /> Q I
<br /> RED PROJECT # 18050
<br /> c
<br /> o HILTON # 18-428ND
<br /> PLANNING # SPR-18-102
<br /> o ° ° ° 0 0 01 PERMIT # -
<br /> T
<br /> APN # 196-270-23
<br /> o DATE: 11.12.18
<br /> Q
<br /> DRAWN: NR
<br /> PLUMBING HOT AND COLD WATER FIRST FLOOR PLAN CW SIZING TABLE cIP=4 PSI/100'
<br /> PLUMBING H❑T AND C❑LD WATER FIRST FL❑❑R PLAN N❑TES CHECKED: GD
<br /> SCALE:1/8"=1'-0"
<br /> o 3/4" PEX H&CW BELOW SLAB IN 2" CONDUIT TO TRASH ENCLOSURE, FIXTURE UNIT S
<br /> 3/4"HW TO HB-1 IN TRASH ENCLOSURE AND 3/4"CW TO HB-1 IN TRASH SHEET TITLE:
<br /> NORTH ENCLOSURE, PIPING ABOVE GROUND IN TRASH ENCLOSURE TO BE FU'S GPM
<br /> U) GALVANIZED IRON. PLUMBING FIRST FLOOR
<br /> 1/2"CW TO ICE MACHINE FB❑, SIZE FT FV
<br /> VEL <=5 VEl 8 PLANS
<br /> .V) FPS HW FPS CW
<br /> 1/2" 2 NA 2 2
<br /> O 3/4" 6 NA 5 5
<br /> O 1" 14 NA 10 10
<br /> 1-1/4" 32 NA 20 20
<br /> c
<br /> Q 1-1/2" 56 15 30 30
<br /> 2" 255 155 66 66 SHEET NO.:
<br /> 2-1/2" 425 400 72 110
<br /> 3" 950 950 107 190
<br /> P 1
<br />
|