Laserfiche WebLink
C14 <br /> Lf) <br /> I- <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 . U <br /> . W <br /> SE 3/P0,4 FOR ENLARGED FLOOR PLAN <br /> PLUMBING SS, GAS, AND VENT FIRST FLOOR PLAN NOTES IE <br /> 04 H - SEE CIVIL PLANS FOR CONTINUATION, U <br /> �5 2❑ OFFSET SS IN CEILING SPACE AND UP INTO CHASE ON FLOOR ABOVE. SEE P2 Q <br /> ❑ ❑5 ' I _\ r RED INC ARCHITECTS <br /> 6 5 = 3❑. SPILL 1" TAILPIECE FROM ICE MACHINE F60 AND 3/4" TAILPIECE FROM ICE 1217 J STREET, MODESTO, CA 95354 <br /> ' 6 - 2os.s22.ssoo <br /> ----- <br /> Q ; I ----- O BIN FBO TO FS-1. <br /> Z 3'G r _ O <br /> o <br /> DEVELOPED <br /> _ ❑5 ❑5 _� -- PER CPC 711,1 DRAINAGE C❑NNECTI❑NS SHALL NOT BE MADE INT❑ A SEAL: <br /> Q0 PGE METERAS DE PED L - 250' O O /' ii'f fl -----� `---I V DRAINAGE PIPING SYSTEM WITHIN 8 FEET OF A VERTICAL TO <br /> D Ai H❑RIZ❑NTAL CHANGE OF DIRECTION OF A STACK CONTAINING <br /> ---- <br /> (� - II I <br /> GA S _ GAS G S GAS GAS GAS GAS AS�GAS GA GAS GA AS GAS GAS ° u' I r r---- SUDS-PRODUCING FIXTURES. TYPICAL FOR ALL WASTE STACKS CONTAINING c,\ONAL F <br /> DEMAND 3 0 CFH <br /> 0 G 7 3 G J I I c�_1 � ® BATHTUBS, LAUNDRIES, WASHING MACHINE STANDPIPES, KITCHEN SINKS, �,� G G. <br /> N _ 1293 CFH O III I I I J _ I___J I r AND DISHWASHERS. PARALLEL SS TO WASTE RISERS SHOWN ON DRAWING <br /> !FSEE 1/P .4 IF _NLA GE F LAN ci I P-1 7 1� - O TO COMPLY W/ CPC, <br /> ° a I a <br /> a ° �� 1 00 ° Cl) a I I 13 L---- 0 3/4" C❑ND FR❑M AB❑VE, SEE 1/P2 FOR CONTINUATION, SPILL " "� : s-3o-2 Q <br /> CONDENSATE LINE TO DRY WELL IN SIDEWALK, DRY WELL TO BE 12'0, <br /> �, CFH I PO 10' DEEP LINED WITH SCH 120 PIPE AND BACK FILLED WITH GRAVEL, AN��'PO�� <br /> c, H P-1 1 • - • ° - MINIMUM SIZE 1", MAZIMUM SIZE 1-1/2" TAMP OUTSIDE ❑F DRY WELL F �F <br /> �w -----�" --- ---- ------ = D ❑ D a i I S OF C P�- <br /> ' ® 0,3 II 0,3 \ / �� I CASING TO PREVENT COLLAPSE, DRY WELL TO HAVE COVER. <br /> Q 4"SS 4 SS o � "!! � - <br /> - _ o_ o _ _ cl o� © TIE 3/4" C❑ND FROM PTAC- TO 3/4" C❑ND FROM ABOVE, SEE 1/P2 FOR <br /> ❑1 4 - _ _ D�� ° ° D _ _ .\ 1 4'FCa y I B B S 2'S SS J C❑NTINUATI❑N. SPILL CONDENSATE LINE TO DRY WELL IN SIDEWALK, DRY <br /> J I I 4 SS SS 4 SS _ F <br /> 4 SS GT-1 (2)4"Hv ' , t0,3 4 SS O I 1 A - P0,3 WELL TO BE 12'0, 10' DEEP LINED WITH SCH 120 PIPE AND BACK FILLED <br /> -4 \ ---- PO B L B _ _ B 2 B - - IL I P0,3 P0,3 _ _ WITH GRAVEL MINIMUM SIZE 1" MAZIMUM SIZE 1-1/2", TAMP OUTSIDE ❑F <br /> X D 7� �G L -GL G P0.3 2'S 'ss P0.3 P0,3 2'SS I, GAS Gas A A s - - DRY WELL CASING T❑ PREVENT C❑ELAPSE, DRY WELL T❑ HAVE C❑VER, CONSULTANT: <br /> 4"YC❑ `� B n I A Ll <br /> o L - - J4 B B B A 129 CFH P0,3 A 3/4"C❑ND FR❑M HVAC EQUIPMENT W/CP-1. SPILL T❑ DRYWELL PER N❑TE ❑ ❑ <br /> B P0,3 P0,3 P0,3 I P0,3 P0,3 5,6 b 8 <br /> Z B Com 2'S 'SS 2'SS - <br /> U ❑ ❑ <br /> w C P0,3 i I 0.3 2 2 P0, r r 3 ll = DF-1 - 2'S L- 2•ss L - - - - A - �. z� o 04 ❑ <br /> w P0,3 4" 4'SS 2 , <br /> A <br /> - - i 2 SS F - I ,H Hv 4 S I •sS P 0.3 I I Z W <br /> O I �D-1 I 2"SS - 'SS I I 2'S , N l e <br /> - 77 <br /> U) 2'SS 6 -FS-1 -- 2' v L 6 YCO FIXTURE CONNECTION SCHEDULE - DFU'S FOR GREASE TRAP HYDRO DYNAMIC W 8 � ❑ ❑ <br /> ® 6"FC❑ - -_ " �4'SS \ 6'SS 4 4y \ 6'SS CONNECTION SIZES TANK SIZING 00 W ❑ ❑ <br /> 6'YC❑ 1-1/2'G RISER 4 4 D S 'Hv .v 4 ° • B 4 ° ° PLUMBING SANITARY DFU'S TOTAL HYDRO EQUIV N Z ® ❑ ❑ <br /> • m � ea � oo ❑ <br /> 0 P0,3 � r--___ __ __ FIXTURE QTY SEWER FU FU DFU'S GPM � Z � � N �❑ � <br /> D <br /> �P1 I �.5 0 '� o o C,3 ', � 0 El 7- ❑ <br /> _ 0 0 FD - 1-1/2" KITCHEN 2 2" 4 8 10 25 ❑ N <br /> 0 - I _ ----- ----- ----- MOP SINK 1 2" 4 4 5 12.5 F1 Ll <br /> 7 D O O D ❑ Frl- --- 0 ® FLOOR SINK 2" SCULLERY 4 2" 4 16 20 50 U11 E <br /> --- TOTALS 7 28 35 87.5 W <br /> C33 CL-D <br /> 5 T <br /> g - - - - - - - - - - I - <br /> ❑ 0 0 7 O L----- ----J O USE 100 GALLON MIN FOR THIS APPLICATION <br /> - - - - - - - - <br /> _ _ = 5 _- _- - � _- _7 <br /> IL I <br /> TABLE 120.3-A Pipe insulation Thickness <br /> O FLUID CONDUCTIVITY INSULATION NOMINAL PIPE DIAMETER(in inches) <br /> TEMPERATURE RANGE MEAN <1 1 TO< 1.5 1.5 TO<4 4 TO<8 8"and <br /> G A S S I Z I NG TABLE RANGE F) hour utpe sq are TEMu-inch per PERATURE INSULATION THICKNESS REQUIRED(in inches)TING I larger <br /> foot per°F) (°F) <br /> 71WC DEVELOPED PIPE CFH Space heating,Hot Water systems(steam,steam condensate and hot water)and Service Water Heating Systems(recirculating sections,all <br /> L/ piping in electric trace tape systems,and the first 8 feet ofpiping from the storage tank for nonrecirculating systems) <br /> Above 350 0 0.32-0.34 250 4.5 5.0 5.0 5.0 5.0 <br /> 250' 1/2" 30 251-350 0.29-0.31 200 3.5 4.0 4.5 4.5 4.5 <br /> SIZES FROM TABLE 201-250 0.27-0.30 150 2.5 2.5 2.5 3.0 3.0 by HILTON'" <br /> 1216.2(1) 3/4" 63 141-200 0.25-0.29 125 1.5 1.5 2.0 2.0 2.0 <br /> 105-140 0.24-0.28 100 1.0 1.5 1.5 1.5 1.5 <br /> 2016 CPC 1" 119 Space coolings stems chilled water, refri erant and brine <br /> PLUMBING SS, GAS, AND VENT FIRST FLOOR PLAN o.5 0.5 75 NON RES NON RES 1.0 - <br /> 1-1/4" 244 RES 0.75 RES 0.75 Q <br /> 0.5 0.5 Z <br /> SCALE:1/8"-1'-0" 1-1/2" 366 Below 40 0.20-0.26 50 1.0 1.5 1.5 1.5 1.5 <br /> O <br /> 2" 704 <br /> J <br /> 2-1/2' 1120 Q <br /> ALL HOT WATER LINES SHALL BE INSUALTED PER THE ABOVE TABLE. O <br /> NORTH 3' 19so <br /> _ 7 <br /> O O � ° O <br /> I I I I I I ° I I I I I <br /> _ SE 4/P0,4 FOR ENLARGED FLOOR PLAN W <br /> Vi - - - - - - - - - - - - - - - - - - - - - - - - 0 <br /> G - - - ❑ - -- - - - - - - - - - - -- - - - - - o- -- - - -- - - o =__=__ =_�_ _= - - - - - - - µ � r - - - - - ❑ - - - - - - o - - - - - - GAS SIZING TABLE � a <br /> LJJ <br /> � I DEVLELOPED 'L' PIPE CFH IIIIIIIIIIIIII� <br /> Q - - - - - - - - - - - - �- _- - - - - - - 200'- <br /> F11 <br /> HW - HW HW H ❑ ❑ I r I -- O SIZES FROM 3 4" 71 <br /> - / <br /> 0 2 L CE. - - - - _ - - _�, � - � , I I - TABLE 1216.2(1) O <br /> £ O O 2016 CPC 1" 134 <br /> o I � <br /> O � it - �!II II � i z\ i <br /> ----- -----� L 1-1/4" 275 <br /> is ii �'���'��u F11 � ----- <br /> ---- <br /> V) I= / 0,4 F❑R O III III II �I i r----- -----_I 1-1/2" 412 W <br /> £ - Q ___ 0 2" 794 r <br /> 1 E) El „� 0 UL] <br /> CPO <br /> W r ° _ _ _ _as oo 1-v :Hw ia; 0 P03 -1/41 w 141 U' 2-1/2" 1270 <br /> W L HW H Hv Hv xv HV ' <br /> o o ) ix <br /> K Q, III I ❑ I - 0_ <br /> O � �IN 3" 2240 O <br /> LL <br /> o ° P0,3 I ❑ V °2'C °° /� 4" 4560 0 <br /> 1-1/4"CW 2 .5 FU'S 1/4"C W, FU'S "'' 9 FU'S <br /> o o °o II 1'HW 120° FU'S W 120 1 FU'S 2 C 4.25 FU II 2'CW 124 FU I 2-1/2'CW b.75 F 'S <br /> o o J 2'HW 1 ' ZJ2'HW 120° 222 FU 415.75 FU'S 174. 5 FU u <br /> 1/ ' /` 1/2'HWR �� '@ ER 2- /2'CW 29 .7 F ' I 2-1/2'CW 291.75 FU = I - <br /> o� 1 140° 2'C 2'H 120° 13 I o o Q <br /> Q 2'HW 120° 222 FU I _1 1- /2'CW - <br /> ' I �� ' W 1�0° \ ° 0 2"HW 107. 1� /4'CW°1 U' 1 0 <br /> 0 1° 1 1 HW 120 FUS 2 HW 120° 222 FU <br /> FU's 61 <br /> S - 12.2 - - - Z <br /> ` vr�-Hv Hvr� HWR HW HWI- HW H}�WR HW I fR� HWI� H HWI� HW HW W HW HW H HW 1'HW 1 FTT O <br /> ' AH All AHAl- nH- AH nH-nH MH _ MH H MH _ H _MH - MH _MH MH_ MH MH MH _ _ - H H r HW HW_ -1/4' 1 U'S <br /> W nH - nH AH-nx nH- MH MH MH M MH MH MH MH MH MH H MH MH MH MH H MH MH MHt:�-AHW <br /> H MH MH MH MH 'HW 9 U'S O <br /> 0 Hv -HW ® O HW - HWR HW HWI H R HWR HW HW HW HWR - HW WR HW HWS HWR WR HW H 2'HW 120° 120° ��2'HW 120° O <br /> � - - ' 2 FLS 1-1 2' W HEADER 15 FU'S 1-1/2'CW 33,25 FU'S 1/2'H R 132.75 FU'S 147.75 FU'S 5 FU <br /> _0 700Mo ( 0 - /2 W 120° , 5 FU 75-F - - - - ~ <br /> }25 ///// 5 FU'S W 92.25 FU'S DF-1 -2 -2 _ - 12 _ <br /> W 1 (1 1/2'CW 2 Fu's WC-1 O Q <br /> 12 ° i O o I 4 CW i 9-Fj, °1-1/2' 3 O J <br /> r r 1-1/ 29 U'S 4 HW 15 S 1-1/4' 18 <br /> V) I I � O 1'H 15 U'S 3 <br /> W/ � P �WC-2 TP-1 <br /> W/�' - � ° � REVISIONS: <br /> o�� m <br /> HOH - 0,3 - <br /> o 1-1/4'cw 2s, Fu's K 1-1 C 28. F IS 1-1/4-CW 2s, Fu's � ---__, - - -_, Q HILTON 10/18/2018 <br /> 0,3 <br /> 1'HW 120° 13. FU'S 3 1"H 'S 1"HW 120° 13, FU'S P 3 1-1/4'CW 28,5 FU' 1-1/i CW 28, F .1 <br /> 1'HW 13.5 FU' L 1-HW 13 P .3 <br /> >, 1-1/4"CW 21.75 FU <br /> 0 0.3 1'HW 11.25 FU o <br /> I o 0 1 I I I I I -----i I � I L----- I -----j I I <br /> ° ° ® ® ® <br /> ❑ o � a o O o <br /> 0 <br /> L) 0 - - - - - - - - - - o <br /> ' L � <br /> Q I <br /> RED PROJECT # 18050 <br /> c <br /> o HILTON # 18-428ND <br /> PLANNING # SPR-18-102 <br /> o ° ° ° 0 0 01 PERMIT # - <br /> T <br /> APN # 196-270-23 <br /> o DATE: 11.12.18 <br /> Q <br /> DRAWN: NR <br /> PLUMBING HOT AND COLD WATER FIRST FLOOR PLAN CW SIZING TABLE cIP=4 PSI/100' <br /> PLUMBING H❑T AND C❑LD WATER FIRST FL❑❑R PLAN N❑TES CHECKED: GD <br /> SCALE:1/8"=1'-0" <br /> o 3/4" PEX H&CW BELOW SLAB IN 2" CONDUIT TO TRASH ENCLOSURE, FIXTURE UNIT S <br /> 3/4"HW TO HB-1 IN TRASH ENCLOSURE AND 3/4"CW TO HB-1 IN TRASH SHEET TITLE: <br /> NORTH ENCLOSURE, PIPING ABOVE GROUND IN TRASH ENCLOSURE TO BE FU'S GPM <br /> U) GALVANIZED IRON. PLUMBING FIRST FLOOR <br /> 1/2"CW TO ICE MACHINE FB❑, SIZE FT FV <br /> VEL <=5 VEl 8 PLANS <br /> .V) FPS HW FPS CW <br /> 1/2" 2 NA 2 2 <br /> O 3/4" 6 NA 5 5 <br /> O 1" 14 NA 10 10 <br /> 1-1/4" 32 NA 20 20 <br /> c <br /> Q 1-1/2" 56 15 30 30 <br /> 2" 255 155 66 66 SHEET NO.: <br /> 2-1/2" 425 400 72 110 <br /> 3" 950 950 107 190 <br /> P 1 <br />