My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
161
>
1600 - Food Program
>
PR0546570
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2021 11:08:05 AM
Creation date
3/16/2021 3:01:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0546570
PE
1623
FACILITY_ID
FA0026416
FACILITY_NAME
TRU BY HILTON LATHROP
STREET_NUMBER
161
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
161 E LOUISE AVE
P_LOCATION
07
QC Status
Approved
Scanner
SJGOV\jcastaneda
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> EXTERIOR FINISH INDEX EXTERIOR ELEVATION KEYNOTES I--- <br /> S-I PAINTED 5T000O SYSTEM: LIGHT SAND 5T000O, I. APPROXIMATE LINE OF GRADE . U <br /> COLOR TO MATCH - PANTONE IG BLACK . <br /> 2. TYZESPA METEON HIGH PRESSURE LAMINATE PANEL - SEE LU <br /> D S-2 PAINTED 5T000O SYSTEM: LIGHT SAND 5TU6GO, FINISH INDEX FOR COLOR <br /> COLOR TO MATCH - DRYVIT - #6135 OVERCAST <br /> 3. ELA5TOMERIG PAINT O/ THREE GOAT, l/8" STUCCO <br /> S-3 PAINTED 5T000O SYSTEM: ROUGH SAND STUCCO, SYSTEM - APPLY OVER VAPOR5HIELD 2 <br /> iv COLOR TO MATCH - DRYVIT - #20l GLAGIER WEATHER-RESISTIVE BARRIER SYSTEM OVER PLYWOOD r 1 <br /> SHEATHING - PROVIDE 266A. GALVANIZED WEEP V <br /> D S-4 PAINTED 5TUG60 SYSTEM: LIGHT SAND 5T000O, SCREED 4" ABOVE GRADE OR 2" ABOVE CONCRETE - <br /> COLOR TO MATCH - DRYVIT - PANTONE PM5 SEE DETAILS XX/ADX AND SPECIFICATIONS <br /> PROGE55 CYAN Q <br /> C, D 4. PROVIDE EXPAN51ON AND CONTROL JOINTS AS SHOWN - <br /> S-5 PAINTED 5T000O SYSTEM: LIGHT SAND 5TUCGO, SEE DETAIL X/ADX - TYPICAL AT EXTERIOR GEMENT -RED INC A-RGHITEGTS <br /> COLOR TO MATCH - DRYVIT - #615A TATTLETALE PLASTER - ALIGN WITH EDGE OF DOORS AND WINDOWS L2I'1 J STREET,MODESTO,GA x5354 <br /> z AS NEGE55ARY - 5EE DETAIL XX/ADX 20q.522bc100 <br /> LP—I HIGH PRESSURE LAMINATE PANEL: TRESPA METEON <br /> - UNI COLOUR A22.1.6-ROYAL BLUE SATIN FINISH 5. EXPANSION JOINT AT FLOOR LINE WITH BAGKERY20AD <br /> O AND SEALANT SEAL: <br /> LP-2 HIGH PRESSURE LAMINAET PANEL: TRE5PA METEON <br /> - UNI COLOUR A41.0.6 MOJITO GREEN SATIN FINISH 6. KYNAR FINISH ALUMINUM GOPING/GRAVEL STOP SYSTEM - <br /> COLOR TO MATCH ADJACENT MATERIAL <br /> J PAINT: BENJAMIN MOORE EXTERIOR PAINT SE1D ARC/yiT <br /> 0 S-I _ 15% NIGHTFALL/HIGH OL055 FINISH 1. EXPOSED CONTINUOUS 0.1. 5TIONOGOEEP 50RTE TOMATCH STUCCO D - PAINT ALL �G�'P��E.BUR0 <br /> SF-I STOREFRONT 8 WINDOW ASSEMBLY: COLOR <br /> z CLEAR ANODIZED ALUMINUM 3 <br /> 8. ALUMINUM FIXED WINDOW WITH THERMAL BROKEN FRAME <br /> FW FEATURE WALL: SEE DIAGRAM AND INSULATED GLAZING WITH INTEGRAL ALUMINUM <br /> p LOUVER AT PTAG UNITS - SEE WINDOW SCHEDULE REN. \P <br /> W j 03-31-21 <br /> pq. ALUMINUM FIXED WINDOW WITH THERMAL BROKEN FRAME �TFOFCALt <br /> W AND INSULATED GLAZING - SEE WINDOW SCHEDULE <br /> Q 10. ALUMINUM STOREFRONT SYSTEM WITH THERMAL BROKEN <br /> N FRAME AND INSULATED GLAZING - SEE WINDOW <br /> SCHEDULE <br /> 11• ALUMINUM AUTOMATIC SLIDING ENTRY DOOR W/ <br /> INSULATED GLAZING - SEE DOOR 56HEDULE CONSULTANT: <br /> O 12. ALUMINUM PTAG LOUVER - COLOR TO MATCH ADJACENT <br /> m <br /> MATERIAL - SEE MECHANICAL DRAWINGS FOR 51ZE AND <br /> O REFER TO STRUCTURAL DRAWINO5 FOR HEADER 51ZE <br /> N AND LOCATION <br /> W <br /> 13. HOLLOW METAL DOORS - SEE DOOR SCHEDULE <br /> W <br /> N 14. OVERFLOW SCUPPER - SEE ROOF PLAN <br /> N <br /> T 15. SPACE FOR BUILDING SIGNAGE - SIGNAGE TO BE <br /> SUBMITTED UNDER SEPARATE PERMIT AND COVER - <br /> VERIFY EXACT SIZE, LOCATION ANDREGUIREMENT5 <br /> W/OWNER - SEE ELECTRICAL DRAWINGS --REFER TO TRU <br /> BY HILTON EXTERIOR SIGNAGE 5PEGIFIGATION5 <br /> 16. REVIEW ALL VIEWS AIROUND PROPERTY BEFORE <br /> LOGATING ALL-ROOFTOP MECHANICAL UNITS - VERIFY <br /> EQUIPMENT 15 ADEQUATELY SCREENED <br /> Il. DOWNLI6HT AND IN-GROUND UPLIGHT TO ACCENT <br /> C C u MULTI-GOLORED BUILDING-RECE55E5 <br /> A © © O O r n <br /> 15. PROVIDE ILLUMINATED ADDRESS NUMBERS LOCATED IN <br /> A POSITION THAT 15 LEGIBLE AND V151BLE FROM THE <br /> STREET. NUMBERS SHALL CONTRAST WITH THEIR <br /> BAGKGROUND, BE A MINIMUM OF 5" HIGH, AND LOCATED <br /> ON THE EAST LOU15E AVENUE SIDE OF THE BUILDING <br /> Iq. PROVIDE "FIRE CONTROL-ROOM" SIGNAGE IN MIN. 3" HIGH <br /> T.O. PARAPET LETTERS ON A 6ONTRA5TING BAGKGROUND <br /> T.O. ELEMENT 45'-4 I/2" <br /> T.O. PARAPET 20. LOUVER -- SEE MECHANICAL DRAWINGS <br /> 6 46-q" <br /> T.O. ELEMENT <br /> d ° T.O. PARAPET <br /> °� 43'-q" <br /> ° d <br /> T,O.PROOF1 <br /> g ° 4 <br /> q <br /> ° d T.O. PLATE #4n1 <br /> °- - - - - - o - - - - - - - - - - - - - - -� "� BUILDING SICNACE y <br /> 4 ° ° ° ° HILTOW <br /> d° d ° d u� 5 0O 4 OO OO ALL SIGNAGE INDICATED FOR ILLUSTRATIVE PURPOSES <br /> % S-I ONLY. LOCATION, SIZE, ETC. TO BE DETERMINED ON AN <br /> d INDIVIDUAL PROJECT BASIS. <br /> d <br /> T.O. FINISH FLOOR #4 MINIMUM 3/4" PLYWOOD BACKER BOAYRDYREOUIRED AT SIGN Q <br /> - - - - - - - - - - 31'-6" <br /> LOCATIONS. AREA SHOULD COVER ENTIRE LENGTH AND Z <br /> - - - - - - - - - - - - 'd - _ S-I - - S-2 - - - - - - 3 4 5 2 I I 4 <br /> % HEIGHT OF FA561A OR SPACE AVAILABLE FOR SIGN, <br /> +8" T.O. PLATE #3 <br /> cV 30'-0 1/2" <br /> 3 N OELECTRICAL AND FINAL CONNECTION BY CONTRACTOR. LL <br /> S _ <br /> -4 ELECTRICAL�REGUIREMENT5 MAY BE OBTAINED FROM SIGN J <br /> d ° - 'n <br /> 0_\ <br /> � OO 1(�) <br /> COMPANY. TYPICAL 120VREQUIREMENT. Q <br /> T,O. PARAPET 6'-O" °22' S" ° ° ° N T.O. FINISH FLOOR #3 FEATURE WALL2 5I 3 5 RACEWAYS / WIREWAYS AYRE NOT ALLOWED <br /> ° PERMANENT AG6E55 DOORS TO INTERIOR OF ALL <br /> ° d <br /> PARAPETS WHERE SIGNS ARE LOCATED TO BE PROVIDED <br /> PAINTED STUCCO SYSTEMS: SMOOTH 5T000O, BY CONTRACTOR. CONTRACTOR TO FURNISH AND CONNECT <br /> 4001 305 20 O l0 PRIMARY ELECTRICAL SERVICE INSIDE PARAPET WALL. <br /> d° ° COLOR TO MATCH - PANTONE PM5 PROCESS <br /> d YELLOW <br /> 6 ° ° T.O. FINISH FLOOR #2 FFH 2 PAINTED STUCCO SYSTEMS: SMOOTH STUCCO, NOTES <br /> d % 12'-2" COLOR TO MATCH - PANTONE PMS PROGE55 ALL STUCCO TO BE INTEGRAL COLOR PAINT o <br /> ° cV T.O. PAYRAPET CYAN 503 2 l0 40 4003 <br /> - - - -T.O. G - - - - - ° -� ° - - - °- ° - - <br /> II'-6" d LP-I - II'-6" M STOREFRONT COMPONENTS TO <br /> PAINTED 5T0000 SYSTEMS: SMOOTH 5T0000, <br /> WINDOWS AND ALUMINUM0 �iD <br /> v T.O. PLATE #1 FW 3 COLOR TO MATCH - PANTONE PMS #311G RECEIVE WHITE FINISH <br /> 13 18 3 13 S-5 `p Q 10'-8 1/2" USE KYNAR PAINT AT LOBBY VESTIBULE ENTRY DOORS, <br /> PAINTED STUCCO SYSTEMS: SMOOTH STUCCO, a <br /> 4 _ _ _ _ FW 4 LAUNDRY, AND KITCHEN AREA VENTS, AS WELL AS WINDOWS n <br /> 10 r - - - , COLOR TO MATCH - PANTONE PMS #2g55G O 20 4 03 05 05 40 �' 0 <br /> AND DOORS AS-REQUIRED BY BRAND STANDAYRDS <br /> v — O FW 5 PAINTED STUCCO SYSTEMS: SMOOTH 5T000OSQUARE ALL STUCCO CORNERS <br /> Iq _ MSB COLOR TO MATCH -PANTONE PM5 #2685G o <br /> PTAG AND SLEEVE MUST BE COMPLETELY SEALED INSIDE <br /> LLjC� OO OO OO AND OUT TO MAKE WATERTIGHT <br /> (L T.O. FINISH FLOOR #1 3 4 5 2 I I 4 0 <br /> O 5TU6GO TO BE LIGHT SAND FINISH - SUBMIT SAMPLES TO <br /> O l l OWNER FOR APPROVAL <br /> E <br /> N � � <br /> N <br /> Q_iS <br /> UTILL: I/8" � <br /> Z <br /> 3 <br /> N <br /> O <br /> v <br /> Z <br /> o _C) <br /> T <br /> N <br /> CL <br /> 0 1 2 3 4 5 © 7 8 9 10 11 12 13 14 15 16 <br /> z <br /> I I I I I C) Q <br /> 600 AbOli 60 603 604 <br /> 4J <br /> FW FW FW <br /> _C) I I I I I 4l'-q° <br /> 16'-8" 6 I I I Il I Il Il T.O. ELEMENT <br /> REVISIONS: <br /> T.O. ELEMENT <br /> 6 45'-41/2" 0j PLANNINO 10/05/2018 <br /> � T.O. ELEMENT m T.O. PAYZAPET 43_q 2 HILTON 10/18/2018 <br /> T.O. PARAPET a a 15 ° ° cV <br /> 4 CSI <br /> S-2 5-2 T,O. ROOF VARIES <br /> S-2 q +4' 8 +4" 8 +4" 8 +4" 8 <br /> 3 HILTON 02/0-1/201q <br /> S-I ° T.O. PLATE #4 <br /> �, - - - - - - - - - - - - - - - - - - - n 6 - - n - - - - - - - - - - - - - - <br /> 3q' 6 5/8" <br /> cv S— <br /> ° [] <br /> by Hilton d S <br /> - - d ° - - - - - - - - - - - - - - - - - - - - - - T.O. FINISH FLOOR #4 <br /> I <br /> -!'EE LIE <br /> °° N EQ EQ EQ I'-II"EQ EQ EQ 3 <br /> a RED PROJECT # 18050 <br /> Q NgL E Ll 11 n <br /> 4 ° d T.O. PARAPET 22-5 HILTON # 18-428ND <br /> - - - - - - - °dam°- - - - - - - - -� - © - - - - - - - - - - - - - - - - - - - - - - - - - - T.O. FINISH FLOOR <br /> - - - - 21'-10" PLANNING # SPR-18-102 <br /> O _ <br /> PERMIT # - <br /> ° ° d d ° 2 4' APN # I qb-2-70-23 <br /> O IL( 623 8 <br /> ®° °° d ° ° ° �° F_ _11E 11E L76 DATE: 03.06.1 q <br /> 11E <br /> P-I LP-2 -I 7 DRAWN: H.GOLLINS <br /> - - — 98d LP <br /> ' = L Q T.O. CANOPY L� T.O. FINISH FLOOR #2 <br /> _ CHECKED: J.MILLER <br /> •� - - - - - - � 2_ _ - - - - - - q - - - - - 13S-I ° d° 6 <br /> 10'-8 1/2" <br /> O — +4" +4" 4" +4" a — <br /> v 3 2 + ° <br /> N 4 to d S-3 w SHEET TITLE: <br /> Z <br /> Q EXTERIOR <br /> Q S-3 Ll 1:1::1 <br /> 10 -_ <br /> u� d a ° <br /> N r d r <br /> 3 � ELEVATIONS <br /> T.O. FINISH FLOOR #I <br /> N <br /> s = I II I I I I I = <br /> O I l I I I 10'-3 1/4" 3'-5" Il I IW-11 3/4" l 5'-3 I/2" Il W-10 1/4" 3'-5" Il 10'-3 1/2" O <br /> O <br /> N <br /> EAST <br /> WAST �L�VAT I ON <br /> 2 2 SHEET NO.: <br /> T5 z O <br /> s A500 <br /> A EST <br /> W <br /> KEY PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.