Laserfiche WebLink
N U) <br /> I- <br /> . U <br /> Lu <br /> INTERIOR FINISH SGHEDULE <br /> -ROOM WALLS PARTIAL iRESPONS EUT T` MATSR X <br /> GEILIN6 <br /> NAME FLOOR BASE WALL-I/ BED WALL WALL 2/ EXTERIOR WALL WALL-3/ TV WALL WALL5-4/ACCENT WALL REMARKS24 U <br /> NO. <br /> OWNER FURNISHED GONTRAGTOR u <br /> GUE5TROOM5 MATERIAL FINISH MATERIAL FIN15H MATERIAL FINISH MATERIAL FINISH MATERIAL OWNER FURNISHED OWNER INSTALLED GONTRAGTOR FURNISHED GONTRAGTOR INSTALLED <br /> INSTALLED <br /> 0 <br /> GUEST ROOMS Q <br /> TYP.GUESTROOM VFO6 BOI GYP•BD 5PA02 GYP•BD 5PA01 GYP•BD 5PA01 GYP•BD 5PA01 PTOIA I I CARPET I ALL TOILET ACCESSORIES -RED ING A-RGHITEGTS <br /> J <br /> J Q J1 7- TYP•GUE5T ENTRY VFO6 1301 GYP•13D 5PA02 - - GYP•13D 5PA01 GYP•13D 5PA01 PTOI A/PT26 A 1211 J STREET,MOPESTO,GA 95354 <br /> v w O 2 FITNESS ROOM EQUIPMENT 2 CARPET PAD 2 CORNER GUARDS 209.522.8900 <br /> p D cj TYP•GUE5T BATH TOI 502 GYP.BD W002,TA02 GYP.SD TAO2,WG01 GYP.BD TAO2,WG01 GYP.BD WGOI PTO2,13 <br /> fY ~ 3 ICE MACHINES 3 WALL COVER 3 LAUNDRY FOLDING TABLES <br /> SEAL: <br /> 4 4 LAUNDRY EQUIPMENT<WASHER AND DRYER 4 4 WELGOME CUBES <br /> w TYP.GUE5TROOM VFO6 BOI GYP•BD 5PA02 GYP•BD 5PA01 GYP•BD 5PA01 GYP•BD 5PA01 PTOI A p ARC <br /> J J � 5 GOMMISSIONING 5 5 CERAMIC TILE SSG H/�� <br /> 0 v� Z TYP•GUE5T ENTRY VFO6 1301 GYP•13D 5PA02 GYP•13D 5PA01 GYP•13D 5PA01 GYP•BD 5PA01 PTOI A ��� E.BUR� C, <br /> 0 (3 <br /> v O TYROUE5T BATH TOI 502 GYP.BD W002,TA02 GYP.SD TAO2,WG01 GYP.SD TAO2,WG01 GYP.SD WGOI PTO2,13 6 TESTING AND INSPECTIONS 6 6 CORNER GUARDS <br /> � Q� <br /> z 7 SHOWER CURTAINS 7 7 CODE SIONAOE <br /> n <br /> 8 PATIO FURNITURE 8 8 MONUMENT SIGNAGE CONCRETE AND ELECTRICAL REN. \P <br /> 03-31-21 <br /> -ROOM WALLS O <br /> GEILIN6 G KITCHEN EQUIPMENT AT COMMON AREAS 9 9 WINDOW TREATMENTS AND SHADING SYSTEMS ELECTRICAL AND BLOGKIN6 TFOFCA�-�F <br /> NAME FLOOR BASE NORTH SOUTH EAST WEST REMARKS <br /> Iy NO. <br /> Q MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL FINISH MATERIAL 10 BUFFET EQUIPMENT 10 10 APPLIANCES AT GUESTROOMS <br /> MAIN LEVEL 11 BEDS,BED FRAMES, HEAD BOARDS 11 11 VAGANGES <br /> N 101 VESTIBULE T05 504 GYP.BD WG19 GYP.BD WG19 GLZ - GYP.BD WG19 PT05, A 12 NIGHTSTANDS 12 12 BACK OF HOUSE SHELVING <br /> PTo6A/wco A/ CONSULTANT: <br /> 102 WORK AREA 605 B03 GYP.BD W003 GYP.BD WGIG GYP.BD W003 GYP•BD WGIG PTO6,A/PT05,A JOINT TROUGH DESIGN, EQUIPMENT, AND FEES FOR BOTH WET AND DRY SYSTEMS <br /> 103 FRONT DESK VFOb,OI 1303 - _ _ _ _ _ _ _ 12 A/Pro 13 IRONING BOARDS, FULL LENGTH, WAIRDROBE MIRRORS 13 13 PT09 INGLUDING ALL COST. 6A5, POWER, CATV, TELEPHONE, FIBEROPTIG (TRANSFER AND PUBLIC, UTILITY FEES BY OWNER) <br /> O 104 BREAKFAST COUNTER VF06,01 503 GYP.SD WG02, T02 - - GYP.SD WC05 GYP.BD WG05 Gro ,D/ProSA <br /> IR <br /> PT25A 14 ONS 14 14 SOLAR ENERGY SYSTEMS <br /> 105 DINING VF06,01 B03 GYP.BD WG04 - - GYP.BD WG04 - - PTO6, A <br /> j 106 GAME AREA VFOb,OI E303 - - GYP.BD PA601 GYP.BD W604 - - AGT03, D 15 TELEPHONES 15 15 ENERGY MANAGEMENT SYSTEMS <br /> w <br /> N 101 LOUNGE VFO6,O1,GO5 B03 GYP•BD "019 GYP•BD W004 - - GLZ - Gr03,0/Pr05,A 16 BEDDING AND PILLOWS 16 16 AUDIO VISUAL SYSTEMS CONDUITS <br /> 108 CORRIDOR VF06,01 B03 GYP.SD PT04 GYP.BD PT05 GYP.BD PT04 GYP.BD PT04 PT25, A <br /> ~ 109 OWNER OFFICE G05 505 GYP.BD PT04 GYP.BD PT05 GYP.BD PT04 GYP.BD PTII ACT03, D Il VENDING MACHINES 17 17 CATV, PHONE AND DATA CONDUITS <br /> w <br /> 110 PANTRY TOG, 801 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 ACT, F 18 POS EQUIPMENT 18 0 ALL LIGHTING FIXTURES AT ALL LOCATIONS, INGLUDING LIGHT BULBS <br /> III OPEN OFFICE 005 805 GYP.BD PTII GYP.BD PT04 GYP•BD PT04 GYP•BD PT04 AGT03, D <br /> IG FF+E INSTALL IG IG VANITY MIRRORS <br /> 112 GENERAL MANAGER 605 1305 GYP•BD PTII GYP•BD PT04 GYP•BD PT04 GYP•BD PT04 ACT03, D <br /> 113 CORRIDOR T05 B04 - - - - GYP.BD NCO& GYP.BD WGO4/WGO6 GT03.0/PT01A 20 FF+E OFFLOAD 20 20 TV MOUNTING BRACKET BAGKIN6 AND BLOGKIN6 <br /> 114 WATER/ ICE T05 503,04 GYP.BD WG04 GYP.BD WC08 GYP.BD WGO& GYP.BD NC-05 PT25,A <br /> 21 FF+E DUMPSTERS 21 21 SATELLITE DISH MOUNTS <br /> 115 ELEVATOR LOBBY TI4 803,04 GYP.BD WG18 GYP.BD WGO& GYP.BD WGO& GYP.BD W014/W608 PT24,C CORNER GUARDS- GDO4 <br /> II6 FITNESS -ROI 503 GYP.BD PTII GYP.BD PTII,PTO4, GYP.BD PT04 GYP.BD PT04 AGT03,D 22 BUILDING BRAND SIGNAGE 22 22 ALL APPLIANCE CONNECTIONS OWNER SUPPLIED AND CONTRACTOR SUPPLIED <br /> 111 -RESTROOM TOI B02 GYP•BD "009 GYP•BD T03 GYP•BD "009 GYP•BD W010 PT2615 23 GUESTROOM SIGNAGE 23 23 ALL DIFFERED SUBMITTAL PERMITS <br /> 118 -RESTROOM TOI B02 GYP.BD T03 GYP.BD WG09 GYP.BD WG09 GYP.BD WGII PT2615 <br /> 119 EMPLOYEE BREAKRM VGTOI E305 GYP.BD PT14/ PTII GYP.BD PT14 GYP.BD PT04/ PTII GYP.BD PT04 ACT03,P 24 MONUMENT SIGN (GONG AND ELEG BY GG) 24 24 ALL MILLWORK, CABINETS, AND GASEWORK <br /> 121 LAUNDRY VGTOI 505 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 ACTO4,F 25 WINDOW TREATMENTS AND SHADING SYSTEMS 25 25 ALL GUEST ROOM APPLIANCES <br /> 128 GUE5T CORRIDOR GO6,T05 B03 - - GYP•BD W018 GYP•BD WGO& GYP•BD W001 AGT03,D <br /> 130 LINEN STORAGE VGTOI 1305 GYP•5P PT04 GYP•5P PT04 GYP•5P PT04 GYP•13D PT04 ACTO4,E 26 VALANCES AT WINDOW TREATMENTS (BLOGKING BY GG) 26 26 ALL KITCHEN EQUIPMENT, DUCTS, HOODS, 3M WRAPS <br /> 132 ELEVATOR EQUIPMENT 56 1305 GYP.SD PT04 GYP.SD PT04 GYP.SD PT04 GYP.SD PT04 PT25,A 27 SECURITY SYSTEMS 27 27 ALL LOW VOLTAGE, SECURITY, POS, WIRE AND CONDUIT <br /> 133 MECHANICAL SG E305 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 PT25,A <br /> 28 AUDIO VISUAL SYSTEMS 28 28 ALL MECHANICAL EQUIPMENT <br /> 134 PBX 5PT01 505 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 PT25,A <br /> 135 ELECTRICAL 56 1305 GYP•BD PT04 GYP•BD PT04 GYP•BD PT04 GYP•BD PT04 PT25,A 2C, CATV, PHONE AND DATA 2C, 2C, ALL DOOR HARDWARE (INGLUDIN6 KEY CARD) <br /> 5TI.1 STAFR #1 G04 B05 GYP.BD PT04 GYP.BD PT04 GYP.SD PT04 GYP.SD PT04 PT25,A 30 T.V. MOUNTING BRACKETS 30 30 ELECTRIC VEHICLE GHARGIN6 SYSTEMS by HILTON T" <br /> 5TI.2 STAN? #2 GO4 E305 CGYP.BD PT04 CGYP.BD PT04 CGYP.BD PT04 GYP.BD PT04 PT25,A <br /> 31 ROOM SAFES 31 31 DIMMING SYSTEMS / DAY L16HTING SYSTEMS <br /> TYPICAL LEVEL <br /> 5T2.1/3.1/4.1 5TAFR #1 604 1305 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 PT25,A 32 KITCHEN EQUIPMENT HOODS AND AN5UL 32 32 SODA + BEER LINE CHASES AND CONDUITS <br /> 5T2.2/3.2/4.2 5TAFR #2 G04 E305 GYP.BD PT04 GYP•BD PT04 GYP.BD PT04 GYP•BD PT04 PT25,A 33 WATER AND GAS METER FEES 33 33 ROOM SAFES z <br /> 230, 330,430 CORRIDOR GO6 503 GYP•13D WGIS GYP•13D WGIS GYP•5P WGO& GYP•5P WGOI ACT03 <br /> 34 34 34 SHOWER CURTAIN RODS <br /> 219, 319,419 LINEN STORAGE VGTOI 805 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 PT25,A ILL <br /> 215, 315,415 ELEVATOR LOBBY 606 1303 GYP.BD WG15,16,11 GYP.50 NCO& GYP.50 NCO GYP.50 NCO& PT24,A CORNER GUARDS- 6DO3 35 35 35 ALL CABINETS AND MILLWORK SHOWN IN DESIGN DOCUMENTS Q <br /> 311 ICE MACHINE T05 803,04 GYP•BD WGO& GYP.BD WGO& GYP.BD WGO& GYP.BD WGO& PT24,A 36 36 36 VANITIES AND TOPS <br /> 214, 314,414 STORAGE VGTOI E305 GYP•BD PT04 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 PT25,A <br /> 21-7,41-7 MECHANICAL 56 505 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 GYP.BD PT04 PT25,A 37 37 37 SITE TRASH CONTAINERS, BENCHES, BIKE RACKS, BIKE LOCKS, FLAG, POLES + FLAG5 <br /> 38 38 38 INSTALL OF KITCHEN + BUFFET EQUIPMENT <br /> 39 39 39 EMPLOYEE LOCKERS <br /> 40 40 40 FITNESS ROOM MIRRORS <br /> 0 <br /> 41 41 41 SECURITY GUARDS AND WATCHMAN O <br /> v <br /> 42 42 42 ENCROACHMENT PERMITS AND FEES <br /> a <br /> 43 43 43 STREET USE PERMITS AND FEES <br /> D <br /> v 44 44 44 ALL DESIGN BUILD PERMITS AND FEES <br /> Q o <br /> 45 45 45 UTILITY TAP FEES <br /> TYP I GAL GYPSUM E30ARD FIN 1 SH LEVELS FIN 1 SH LEVELS <br /> 46 46 46 SOLAR PER SBA 504 ENERGY ANALYSIS <br /> THE FOLLOWING LEVELS OF FINISH ARE ESTABLISHED SUBSTRATE FOR TILE; MAY BE SPECIFIED IN GARAGES, PAINTS, LIGHT TEXTURES, OR. KALLOOVE-RIN65 ARE TO PER HILTON TRU SPECIFICATIONS, ALL DRYWALL FINISHES TO COMPLY WITH q <br /> AS A GUIDE FOR SPECIFIC FINAL DECORATION. THE WAREHOUSE STORAGE OR OTHER SIMILAR AREAS BE APPLIED. GA-214 (EXCERPT AT LEFT) 47 47 47 0 <br /> MINIMUMYREQUIREMENT5 FOR EACH LEVEL SHALL BE WHERE SURFACE APPEARANCE 15 NOT OF PRIMARY <br /> AS DESCRIBED HE-REIN. CONCERN. IN CRITICAL LIGHTING AREAS, FLAT PAINTS APPLIED MINIMUM LEVEL 4 FINISH WITH SPATTER KNOCKDOWN AT PAINTED WALLS 48 48 48 <br /> OVER LIGHT TEXTURES TEND TO-REDUCE JOINT <br /> LEVEL O: LEVEL 3: PHOTOGRAPHING. PAINTS WITH SHEEN LEVELS OTHER MINIMUM LEVEL 4 FINISH WITH MEDIUM TEXTURE AT CEILINGS IT— <br /> NO TAPING, FINISHING, OR ACCESSORIES REQUIRED. ALL JOINTS AND INTERIOR ANGLES SHALL HAVE TAPE THAN FLAT AND ENAMEL PAINTS ARE NOT <br /> THIS LEVEL OF FINISH MAY BE USEFUL IN TEMPORARY EMBEDDED IN JOINT COMPOUND AND SHALL BE -RECOMMENDED OVER THI5 LEVEL OF FINISH. MINIMUM LEVEL 4 FINISH AT AREAS TO-REGEIVE WALLGOVERIN65 „ �J <br /> s CONSTRUCTION OR WHENEVER THE FINAL DECORATION IMMEDIATELY WIPED WITH A JOINT KNIFE LEAVING ALL <br /> (� <br /> HAS NOT BEEN DETERMINED. THIN COATING OF JOINT COMPOUND OVER ALL JOINTS THE WEIGHT, TEXTURE, AND SHEEN LEVEL OF MINIMUM LEVEL I FINISH AT ANY CONGEALED FIRE-RATED WALL LOCATION, <br /> AND INTERIOR ANGLES. ONE ADDITIONAL GOAT OF WALLGOVERING5 APPLIED OVER THIS LEVEL OF LEVEL O NEVER ACCEPTABLE ON THIS PROJECT. <br /> LEVEL I: JOINT COMPOUND SHALL BE APPLIED OVER ALL FINISH SHOULD BE CAREFULLY EVALUATED. JOINTS <br /> ALL JOINTS AND INTERIOR ANGLES SHALL HAVE TAPE JOINTS AND INTERIOR ANOLE5. FASTENER HEADS AND AND FASTENERS MUST BE ADEQUATELY CONGEALED IF A. BENCHMARK SAMPLES (MOCKUPS): PROVIDE A FULL-GOAT Z <br /> 3 SET IN JOINT COMPOUND. SURFACE SHALL BE FREE OF ACCESSORIES SHALL BE COVERED WITH TWO THE WALLGOVERING MATERIAL IS LIGHTWEIGHT, BENCHMARK FINISH SAMPLE FOR EACH TYPE OF COATING AND <br /> EXCESS JOINT COMPOUND. TOOL MARKS AND RIDGES SEPARATE GOATS OF JOINT COMPOUND. ALL JOINT CONTAINS LIMITED PATTERN, HAS A 61-055 FINISH, OR SUBSTRATE-REQUIRED. Q <br /> ARE AGGEPTABLE. GOMPOUND SHALL BE SMOOTH AND FREE OF TOOL ANY COMBINATION OF THESE FINISHES 15 PRESENT. <br /> MARKS AND ANGLES. NOTE: IT IS RECOMMENDED THAT UN13ACKED VINYL WALL60VERING5 ARE NOT 1. PROVIDE AN APPLICATION IN ONE GUE5T-ROOM FOR ACCEPTANCE BY <br /> FREQUENTLY SPECIFIED IN PLENUM AREAS ABOVE THE PREPARED SURFACE BE COATED WITH A -RECOMMENDED OVER THI5 LEVEL OF FINISH. THE OWNER'SREPRESENTATIVE AND TO-REPRESENT SURFACES AND <br /> CEILINGS, IN ATTICS, IN AREAS WHERE THE ASSEMBLY DRYWALL PRIMER PRIOR TO THE APPLICATION OF CONDITIONS FOR APPLICATION OF EACH TYPE OF COATING AND z <br /> O WOULD GENERALLY BE CONGEALED OR IN BUILDING FINAL FINISHES. SEE PAINTIN6/WALLGOVERIN6 LEVEL 5: SUBSTRATE AND SERVE AS A SAMPLE STANDARD OF QUALITY FOR C) <br /> T5 SERVICE CORRIDORS, AND OTHER AREAS NOT SPECIFICATION IN THIS REGARD. ALL JOINTS AND INTERIOR ANGLES SHALL HAVE TAPE THE BALANCE OF THE WORK. <br /> 4J NORMALLY OPEN TO PUBLIC VIEW. ACCESSORIES EMBEDDED IN JOINT COMPOUND AND SHALL BE 2.APPLY BENCHMARK SAMPLES, AGGORDING TO-REQUIREMENTS FOR <br /> OPTIONAL AT SPECIFIER DISCRETION IN CORRIDORS TYPICALLY SPECIFIED IN APPEARANCE AREAS WHICH IMMEDIATELY WIPED WITH A JOINT KNIFE LEAVING A THE COMPLETED WORK, AFTER PERMANENT LIGHTING AND OTHER �- <br /> AND OTHER AREAS WITH PEDESTRIAN TRAFFIC. ARE TO-RECEIVE HEAVY- OR MEDIUM-TEXTURE (SPRAY THIN GOATIN6 OF JOINT COMPOUND OVER ALL JOINTS ENVIRONMENTAL 5ERVIGE5 HAVE BEEN ACTIVATED. PROVIDE c <br /> OR HAND APPLIED) FINISHES BEFORE FINAL PAINTING, AND INTERIOR ANGLES. TWO SEPARATE GOATS OF -REQUIRED COLOR AND TEXTURE ON EACH SURFACE. <br /> C)_ SOME DEGREE OF SOUND AND SMOKE CONTROL IS OR WHERE HEAVY-GRADE WALLGOVERINGS ARE TO JOINT COMPOUND SHALL BE APPLIED OVER ALL FLAT 3.-REWORK SAMPLE-ROOM IF NECESSARY TO OBTAIN ARCHITECT'S 8 Z <br /> PROVIDED; IN SOME GEOGRAPHIG AREAS THIS LEVEL BE APPLIED AS THE FINAL DECORATION. THIS LEVEL JOINTS AND ONE SEPARATE GOAT OF JOINT OWNER REPRESENTATIVE'S ACCEPTANCE. O Q <br /> I5REFERRED TO AS "FIRE-TAPING." WHERE A OF FINISH 15 NOT-RECOMMENDED WHERE SMOOTH COMPOUND SHALL BE APPLIED OVER INTERIOR <br /> FIRE-RESISTANCE-RATING IS-REQUIRED FOR THE PAINTED SURFACES OR LIGHT TO MEDIUM ANGLES. FASTENER HEADS AND ACCESSORIES SHALL <br /> GYPSUM BOARD ASSEMBLY, DETAILS OF WALLGOVERING5 ARE SPECIFIED. BE COVERED WITH THREE SEPARATE GOATS OF JOINT FINAL APPROVAL OF TEXTURES AND COLORS WILL BE FROM BENCHMARK <br /> GON5TRUGTION SHALL BE IN ACCORDANCE WITH COMPOUND. A THIN SKIM GOAT OF JOINT COMPOUND SAMPLES. <br /> -REPORTS OF FIRE TESTS OF ASSEMBLIES THAT HAVE LEVEL 4: TROWEL APPLIED, OR A MATERIAL MANUFACTURED <br /> MET THE FIRE-RATING-REQUIREMENT. TAPE AND <br /> ALL JOINTS AND INTERIOR ANGLES SHALL HAVE TAPE ESPECIALLY FOR THIS PURPOSE AND APPLIED IN REVISIONS: <br /> 0 FASTENER HEADS NEED NOT BE COVERED WITH JOINT EMBEDDED IN JOINT COMPOUND AND SHALL BE ACCORDANCE WITH MANUFACTURER'S <br /> (:7 COMPOUND. IMMEDIATELY WIPED WITH A JOINT KNIFE LEAVING A RECOMMENDATIONS, APPLIED TO THE ENTIRE SURFACE. �j PLANNING 10/05/2018 <br /> 5 THIN GOATIN6 OF JOINT COMPOUND OVER ALL JOINTS THE SURFACE SHALL BE SMOOTH AND FREE OF TOOL <br /> (75 <br /> LEVEL-2—.. AND INTERIOR ANGLES. TWO SEPARATE GOATS OF MARKS AND RIDGES. NOTE: IT IS RECOMMENDED THAT A HILTON 10/18/2018 <br /> ALL JOINTS AND INTERIOR ANGLES SHALL HAVE TAPE JOINT COMPOUND SHALL BE APPLIED OVER ALL FLAT THE PREPARED SURFACE BE COATED WITH A <br /> EMBEDDED IN JOINT COMPOUND AND WIPED WITH A JOINTS AND ONE SEPARATE GOAT OF JOINT DRYWALL PRIMER PRIOR TO THE APPLICATION OF �3 HILTON 02/07/2016 <br /> 3 JOINT KNIFE LEAVING A THIN GOATIN6 OF JOINT COMPOUND SHALL BE APPLIED OVER INTERIOR FINISH PAINT. SEE PAINTING SPECIFICATION IN THIS <br /> (�5 COMPOUND OVER ALL JOINTS AND INTERIOR ANGLES. FASTENER HEADS AND ACCESSORIES SHALL REGARD. <br /> 77) ANGLES. FASTENER HEADS AND AGGE55ORIES SHALL BE COVERED WITH THREE SEPARATE GOATS OF JOINT <br /> BE COVERED WITH A GOAT OF JOINT COMPOUND. COMPOUND. ALL JOINT COMPOUND SHALL BE SMOOTH THIS LEVEL OF FINISH IS HIOHLYIREGOMMENDED <br /> SURFACE SHALL BE FREE OF EXCESS JOINT AND FREE OF TOOL MARKS AND NOTE: IT IS WHERE PAINT IS SPECIFIED OR WHERE SEVERE <br /> COMPOUND. TOOL MARKS AND RIDGES ARE RECOMMENDED THAT THE PREPARED SURFACE BE LIGHTING CONDITIONS OCCUR. <br /> ACCEPTABLE. JOINT COMPOUND APPLIED OVER THE COATED WITH A DRYWALL PRIMER PRIOR TO THE <br /> BODY OF THE TAPE AT THE TIME OF TAPE EMBEDMENT APPLICATION OF FINAL FINISHES. SEE THIS HIGHEST QUALITY FINISH IS THE MOST EFFECTIVE <br /> v SHALL BE CONSIDERED A SEPARATE GOAT OF JOINT PAINTING/WALLGOVERIN6 SPEGIFIGATION IN THIS METHOD TO PROVIDE A UNIFORM SURFACE AND <br /> p� COMPOUND AND SHALL SATISFY THE CONDITIONS OF REGARD. MINIMIZE THE POSSIBILITY OF JOINT PHOTOGRAPHING <br /> s THIS LEVEL. AND OF FASTENERS SHOWING THROUGH THE FINAL <br /> THIS LEVEL SHOULD BE SPECIFIED WHERE FLAT DECORATION. <br /> 5PE6IFIED WHERE GYPSUM BOARD IS USED AS A <br /> v <br /> QED PROJEGT # 18050 <br /> D <br /> FINISH LEOEND: NOTES HILTON # 18-428ND <br /> PLANNING # SPR-18-102 <br /> 0 <br /> PERMIT # - <br /> G - CARPET I. ALL MATERIALS SHALL BE INSTALLED USING MANUFAGTURER'S CABINET, HORIZONTAL ON COUNTERTOPS, AND HORIZONTAL ON I. ALL WALL TILE TO FLUSH OUT WITH BASE U.N.O. WITH PATTERN MATCHED TO MAINTAIN UNIFORMITY OF CARPET FOR APPROVAL PRIOR TO APPLICATION. <br /> GONG - CONCRETE -RECOMMENDED FABRICATION AND INSTALLATION PROCEDURES SELF-EDGE BAND U.N,O, DIRECTION AND LAY OF PILE. APN # IG6-270-23 <br /> � FRP - FIBER�REINFORGED PLASTIC AND ADHESIVES. 2. USE APPROPRIATE TRIM PIECES (INSIDE AND OUTSIDE CORNER 4. ALL GRILLS, VENTS, FIRE HOSE GABINETS,�REGISTERS, <br /> C) F - GLASS TRIM AND EDGE PIECES) WHERE APPLICABLE. 3. CARPET SHALL BE INSTALLED PER MANUFACTURER'S ELECTRICAL PANELS, ACCESS PANELS, WINDOW FRAMES IN PATE: 03.06.Iq <br /> 2. 'REVIEW TRANSITIONS SPECIFICATIONS FOR FLOORING -RECOMMENDATIONS AND CURRENT PUBLISHED CRI GUIDELINES, DOORS SHALL BE SPRAY PAINTED TO MATCH ADJACENT FINISH <br /> PL - PLASTIC LAMINATE CABINET HARDWARE 3. TILE TO BE INSTALLED PER THE MANUFACTURER'S <br /> TRANSITIONS INGLUDING THE USE OF MANUFAGTURER'S-RECOMMENDED LOW COLOR UNLESS OTHERWISE INDICATED. BRUSH PAINTING IS NOT <br /> PT - PAINT I. CABINET DOOR PULLS (LIBERTY), AND HEAVY DUTY GUIDES AND RECOMMENDATIONS AND TGA GUIDELINES. VOG COMPLIANT ADHESIVE. AGGEPTABLE. DRAWN: H.GOLLINS <br /> QT - QUARRY TILE 3. FLOOR COVERING MATERIAL CHANGES AT DOOR THRESHOLDS ROLLERS 4. -REVIEW TRANSITION 5PE6IFIGATION5. AT TILE-TO-TILE <br /> -RB - -RUBBER BASE TO OCCUR AT CENTERLINE R OF POOP, UNLESS OTHERWISE WOOD TRIM TRANSITIONS, FEATHER AS NEEDED FOR LEVEL TRANSITIONS. `. CARPET SEAMS SHALL BE SEALED WITH MANUFACTURER'S GHEGKED: -].MILLER <br /> RF - RESILIENT FLOOR INDICATED. APPROVED PREMIUM LOW VOC SEAM SEALER. A I/8" ELEVATOR GAB FINISHES <br /> s ST - STONE I. WOOD GRAIN DIRECTION ON WALL SURFACE PER DRAWINGS. 5. FOR THIN SET FLOOR TILE 12" X 12" OR LARGER, INSTALL SLIP CONTINUOUS BEAD OF SEAM ADHESIVE SHOULD BE APPLIED TO <br /> Q 4. ALL FINISH MATERIALS SHALL MEET THE REQUIREMENTS OF SHEET MEMBRANE. THE BASE OF THE FIRST EDGE WHERE THE FACE OF THE YARN MANUFACTURER: SGHINDLER <br /> T - TILE CHAPTER 8 AND OF THE CURRENT INTERNATIONAL BUILDING 2. CONTRACTOR TO SUBMIT SAMPLES OF WOOD BASE TO BE <br /> v VGT - VINYL COMPOSITION TILE CODE AS ADOPTED BY THE A.H.J. AND TRU BY HILTON APPROVED BY ARCHITECT PRIOR TO FABRICATION AND 6. FOR AREAS NEEDING CONTROL JOINTS, PROVIDE ARCHITECT ENTERS THE BAGKING TO SEAL THE FIRST AND SECOND EDGE, DOORSKINS AND HOIST WAY ENTRANCE: STAINLESS STEEL. <br /> p� WG - 1/4ALLGOVERIN6 PROCUREMENT 61JIM INSTALLATION. COLOR SELECTIONS FOR-REVIEW AND APPROVAL. WHEN THE TWO ARE BUTTED TOGETHER. HEADERS, TRANSOMS, AND-RETURN WALLS: STAINLESS STEEL SHEET TITLE: <br /> s WD - WOOD 5. GALLIUM CHLORIDE AND ALKALI TESTS SHALL BE PERFORMED 3. CONTRACTOR SHALL SELECT WOOD FOR CONSISTENCY IN 1 E <br /> . TILE TO BE GLEANED PER MANUFACTURER'S INSTRUCTIONS AND 5. SEAMS FOR CARPET AND OTHER FLOORING MATERIALS SHALL WALL PANELS: PL-15" PER TRU BY HILTON PROCUREMENT GUIDE <br /> ON AL LEVELS OF SHALLCRETE O EXCEED-RECEIVE <br /> 3 LBS PERINO. 4. ORAIIH AND <br /> DINCO OR. BOARDS TOGLBEAIR FREE <br /> OFPOLYSAP AND KNOTS, RECOMMENDED PRODUCTS. GROUT HAZE 15 NOT ACCEPTABLE BE KEPT TO A MINIMUM AND POSITIONED IN INCONSPICUOUS STILES AND-RAILS ON PANELS: STAINLESS STEEL, INTERIOR FINISH SCHEDULE <br /> UPON COMPLETION OF INSTALLATION. AREAS IN COMPLIANCE WITH CRI 104 (CARPET $-RUG INSTITUTE <br /> N <br /> SQUARE FEET AND PH SHALL-RANGE BETWEEN -7 AND 9, OR AS CHEMICAL AND UV RESISTANT CATALYZED GOATIN6 ACOUSTICAL GEILIN6 TILE INSTALLATION METHODS) AND MANUFACTURER'S HANDRAILS: BRUSHED STAINLESS STEEL (2" FLAT BA-R) <br /> -� -REQUIRED BY SPECIFIED FLOORING MANUFACTURERS. IF THESE -RECOMMENDATIONS FOR SEAM LOCATIONS AND DIRECTION OF CONTROLS: "TRADITIONAL" IN BRUSHED STAINLESS STEEL <br /> < 5. SHADE AND BLEND STAIN AS YREQUIRED FOR CONSISTENCY OF I. GUT TEGULAR (REVEAL EDGE) GEILIN6 TILE EDGES AT WALL CARPET. FLOORING SEAMS SHALL-RUN THE LENGTH OF THE <br /> CONDITIONS CANNOT BE MET NATURALLY, NECESSARY GEILIN6: 6 FIXTURE DOWNLIOHT WITH LED <br /> 41 CORRECTIVE MEASURES SHALL BE MADE WITH PRODUCTS OR APPEARANCE. OR SOFFITS ARE TO MATCH FACTORY EDGES AREA-RATHER THAN ACROSS A MAIN TRAFFIC PATTERN <br /> PROCEDURES COMPATIBLE WITH THE SPECIFIED FLOORING SOLID SURFACE 2. EXPOSED GUT TEGULAR GEILIN6 TILE EPOE5 TO BE FINISHED WHENEVER POSSIBLE. SEAMS SHALL NOT BE PERPENDICULAR <br /> 0 PRODUCTS. COMMENCEMENT OF INSTALLATION OF ANY 1• ALL SEAMS TO BE HARD SEAM (NO SEAMS SHOWING). AND PAINTED TO MATCH ADJACENT CEILING TILE FACE FINISH TO DOORWAY OPENINGS. <br /> FLOORING PRODUCTS SHALL BE CONSIDERED AS ACCEPTANCEPER MANUFACTURER'S-RECOMMENDATIONS. PAINT <br /> BY THE FLOORING CONTRACTOR, FOR WHICH HE/5HE SHALL 2. USE MAXIMUM WIDTHS AND LENGTHS TO MINIMIZE THE NUMBER 3• TEOULAR (REVEAL EDGE) GEILIN6 TILES ARE NOT TO BE <br /> OF SEAMS. PAINT AREAS PER INTERIOR FINISH SCHEDULE AND TRU BY HILTON GONTRAGTOR TO PROCURE ALL CONCRETE SURFACES PER THE <br /> 775 TAKE FULL-RESPONSIBILITY, OF THE SUBSTRATE AND INSTALLED TEGULAR AT ONE EDGE AND LAY-IN AT THE WALL PROCUREMENT GUIDE FOLLOWING <br /> N 3. SIDE AND BAGKSPLASHES TO BE INTEGRAL COVED WITH HARD <br /> +, CONDITIONS AS BEING SATISFACTORY FOR PROPER EDGE BRACKET. <br /> INSTALLATION OF THE PRODUCTS SPECIFIED. SEAMS (NO 5ET-ON 51DE AND BAGKSPLASHES). 4. ALL GEILINC75 SHALL BE ATTACHED TO THE STRUCTURE. DO 1. FURNISH CERTIFICATION BY THE PAINT MANUFACTURER THAT FF PER AGI 318 <br /> 6. "USG 5HEETROCK BRAND ACOUSTICAL SEALANT" (OR 4. ALL SINK BOWLS TO BE INTEGRAL U.N.O. NOT ATTACH THE UNDERNEATH GEILIN6 TO THE OVERHEAD THE PRODUCTS SUPPLIED COMPLY WITH LOCAL REGULATION FL PER AGI 302 <br /> APPROVED EQUAL). 5. EDGE DETAILS PER DRAWINGS. GEILIN6. CONTROLLING THE USE OF VOLATILE ORGANIC COMPOUNDS CONTRACTOR TO PROVIDE AND PAY FOR ALL FF 8 FL TESTING <br /> (VOG5).° CONTRACTOR TO USE PRODUCTS TO QUALIFY AND <br /> STONE METAL TILE TRANSITION 5. ALL GORNER5 SHALL BE NEATLY MITERED. MEET LOW VOG-REQUI REMENT5.° EGOSPEG PRODUCTS QUALIFY SHEET NO.: <br /> 3 I. USE MAXIMUM SLAB SIZE PER APPLICATION TO AVOID SEAMS. I. GONTRAGTOR TO VERIFY AND CONFIRM THAT APPROPRIATE 6. POP--RIVETS SHALL MATCH THE COLOR OF THE SUSPENSION UNDER LEED. <br /> 2. VERIFY EDGE DETAIL WITH DRAWINGS. TRANSITIONS ARE USED AT INTENDED LOCATIONS. SYSTEM. 2. USE THE FOLLOWING PRIMERS PER PAINT MANUFACTURER'S <br /> 3. APPLY PENETRATING SEALANT FOR 5TAIN-RE515TANCE PER 2• FEATHER FLOORING MATERIALS AS NEEDED TO CREATE A CARPET - BROADLOOM -RECOMMENDATIONS: <br /> SUPPLIER'5-REGOMMENDATION5. SURFACE MUST BE GLEAN AND LEVEL, EVEN SURFACE AT ALL TRANSITIONS. 1. INSTALLER MUST ISSUE A SEAMING DIAGRAM TO THE INTERIOR A.FOR LOW VOG PAINT:° 312 EGO SPEC W/B PRIMER A7 0 0 <br /> DRY BEFORE APPLICATION OF SEALANT. PORCELAIN / CERAMIC TILE DESIGNER FOR APPROVAL PRIOR TO ORDERING THE MATERIAL B.FOR EXISTING PAINTED GYPSUM BOARD: 023 FRESH START <br /> PLASTIC LAMINATE AND INSTALLATION. PRIMER <br /> 1• WOOD GRAIN DIREGTION TO BE VERTIGAL ON FACE OF 2. CARPET OF LIKE AND KIND SHALL BE LAID IN ONE DIREGTION G.FOR METAL.OPO4-01 ACRYLIC METAL PRIMER <br /> 3. CONTRACTOR TO SUBMIT PAINT DRAW DOWN TO ARCHITECT <br />