Laserfiche WebLink
Engineered Septic System Report Irerracon <br /> Jeremy Winery Property Lodi, California <br /> October 1, 2020 Terracon Project No. NA197008 <br /> 4.2 Plan Review and Inspection <br /> The results of this investigation are not a guarantee that the San Joaquin County EHD will approve <br /> the proposed septic system design and layout on the property. Three copies of this letter <br /> should be submitted with a report review fee to the San Joaquin Environmental Health <br /> Department. Please be aware that the owner is responsible for these fees. <br /> Our office should be retained to perform four inspections of the septic system during construction. <br /> We will need to coordinate the inspections with the contractor prior to construction. Our office <br /> must inspect the system at the time of the following: <br /> 1. Backfill and grading inspection <br /> If we are not retained, our office cannot be held responsible for problems arising during or after <br /> construction that could have been avoided had these services been performed. The fees for <br /> these services are in addition to that associated with this report. The contractor, however, <br /> is required to pull permits, request inspections, and follow the Rules and Regulations of the San <br /> Joaquin County Environmental Health Department for septic systems: <br /> San Joaquin County Environmental Health Programs <br /> 1868 E. Hazelton Avenue <br /> Stockton, CA 95205 <br /> 209-468-3420 <br /> 5.0 GENERAL COMMENTS <br /> The professional findings presented in this report are strictly based on the information provided <br /> to us regarding the septic system, our observations, and field explorations performed for this <br /> study. The analysis and test results presented in this report are based upon the data obtained <br /> from the soil suitability/nitrate loading report. This report does not reflect variations that may occur <br /> beyond the test hole, across the site, or due to the modifying effects of construction or weather. <br /> The nature and extent of such variations may not become evident until during or after construction. <br /> Our professional services were performed, our findings obtained, and our professional opinions <br /> are in accordance with generally accepted geotechnical testing principles and practices. This <br /> warranty is in lieu of all other warranties either expressed or implied. Our findings do not constitute <br /> a guarantee or warranty, expressed or implied. <br /> Responsive ■ Resourceful ■ Reliable 5 <br />